कथन
Will the Minister of RAILWAYS be pleased to state: (a) whether the Government has assessed the safety and operational status of railway level crossings in Maharashtra; (b) if so, the total number of level crossings in the State, classified as manned and unmanned as on date; (c) whether the Government is aware of persistent safety hazards, traffic congestion and accident risks at several suburban/semi-urban crossings and the assessment made thereof; (d) if so, the details of the number of accidents, fatalities and injuries at these crossings during the last five years, year and district-wise; (e) the steps taken/being taken by the Government to eliminate/upgrade level crossings through Road Over Bridges, Road Under Bridges and Limited Height Subway along with the present status; (f) the funds allocated/sanctioned and utilised for grade-separation projects and the reasons for delays/cost overruns; and (g) whether joint action plans with the Government of Maharashtra are being 11.02.2026 203 considered to expedite stalled projects and if so, the current status of such initiatives? THE MINISTER OF RAILWAYS; MINISTER OF INFORMATION AND BROADCASTING; AND MINISTER OF ELECTRONICS AND INFORMATION TECHNOLOGY (SHRI ASHWINI VAISHNAW): (a) to (g): As on 01.04.2025, there are 601 Nos. of Level Crossings (LCs) including 595 Nos. Manned Level Crossings (MLCs) in the state of Maharashtra. In order to ensure safety, all Unmanned level crossings (UMLCs) on Broad Gauge (BG) network of Indian Railways have been eliminated by 31.01.2019. No consequential train accident has occurred at Level Crossings situated in the state of Maharashtra during the last five years. Further, sanctioning and execution of works of Road Over Bridges/ Road Under Bridges (ROBs/RUBs) for elimination of LCs is a continuous and ongoing process on Indian Railways. Such works are prioritized and taken up on the basis of its impact on safety and mobility in train operations and impact on road users. Nos. of ROBs/ RUBs constructed on Indian Railways during the period 2004-14 vis a vis 2014-25 (upto Dec’25) is as under: Period ROBs/ RUBs constructed 2004-14 4,148 Nos. 2014-25 (upto Dec’25) 13,882 Nos.(including 1,228 Nos. in the state of Maharashtra) 11.02.2026 204 As on 01.01.2026, 4,769 Nos. ROBs/RUBs are sanctioned at the cost of ₹ 1,14,298 crore on Indian Railways including 269 Nos. at the cost of ₹ 5,599 crore in the state of Maharashtra which are at various stage of planning and execution. Completion & commissioning of ROB/RUB works depends on various factors like cooperation of State Governments in giving consent for closure of LC, fixing of approach alignment, approval of General Arrangement Drawing (GAD), land acquisition, removal of encroachment, shifting of infringing utilities, statutory clearances from various authorities, law and order situation in the area of project / work sites, duration of working season in a year for the particular project / area due to climatic conditions etc. All these factors affect the completion time of the projects / works. Railways have taken following measures to expedite the progress of ROB/RUB works: (i) Joint survey with concerned State Govt./Road Owning Authority is done before finalizing the General Arrangement Drawing (GAD) to ensure smooth execution. (ii) Periodic meetings of Railway & State Government officials are done to resolve various issues related to ROB/RUB works. (iii) Standardization of superstructure drawings for various combinations of span, skewness and width of road on Railway portion has been done to avoid 11.02.2026 205 delays during the design approval. This has been issued in the form of compendium, which can be directly adopted for Road Over Bridge across Railway lines for expeditious planning. (iv) ROB/RUB works are planned to be executed on a single entity basis by Railway wherever possible. In case any Road Owning authority/State Govt. wants, then Railway may permit them to execute the work on a single entity basis. Safety is accorded the highest priority on Indian Railways. As a consequence of various safety measures taken over the years, including those for Level Crossings, there has been a steep decline in the number of accidents. Number of Consequential Train Accidents has reduced as shown in the table below:- Year Consequential Accidents 2014-15 135 2025-26 (upto 31.01.2026) 12 (90% lesser) Another important index showing improvement in safety in train operations is Consequential Accidents Index, the details of which are as under:- Consequential Accident Index:- Year Accident Index 2014-15 0.11 2024-25 0.03 (73% lesser) 11.02.2026 206 This index measures number of consequential accidents as a ratio of total running Kilometers of all trains. Accident Index = The various safety measures taken to enhance safety in train operations are as under:- 1. On Indian Railways, the expenditure on Safety related activities has increased over the years as under:- Expenditure/Budget on Safety related activities (₹ in Cr.) 2013-14 2022-23 2023-24 2024-25 2025-26 39,200 87,336 1,01,662 1,14,022 1,17,693 234 165 135 55 31 12 2005-06 2009-10 2014-15 2019-20 2024-25 2025-26 (upto Jan) No. of Consequential Train Accidents No. of consequential accidents No. of trains X million kilometers run 11.02.2026 207 2. Electrical/Electronic Interlocking Systems with centralized operation of points and signals have been provided at 6,660 stations up to 31.12.2025 to reduce accidents due to human failure. 3. Interlocking of Level Crossing (LC) Gates has been provided at 10,097 Level Crossing Gates up to 31.12.2025 for enhancing safety at LC Gates. 4.Complete Track Circuiting of stations to enhance safety by verification of track occupancy by electrical means has been provided at 6,665 stations up to 31.12.2025. 5.Kavach is a highly technology intensive system, which requires safety certification of highest order. Kavach was adopted as a National ATP system in July 2020. Based on deployment of Kavach version 3.2 on 1465 RKm on South Central Railway and experience gained, further improvements were made. Finally, Kavach specification version 4.0 was approved by RDSO on 16.07.2024. After extensive and elaborate trials, Kavach Version 4.0 has been successfully commissioned on 1297 Route Kilometres, covering the high density Delhi - Mumbai and Delhi - Howrah routes. On the Delhi - Mumbai route Kavach ver 4.0 has been commissioned on Junction cabin - Palwal - Mathura - Nagda section (667 Rkm) & Ahmedabad - Vadodara - Virar section (432 Rkm) and on the Delhi - Howrah route on Gaya – Sarmatanr (93 Rkm) and Bardhaman - Howrah section (105 Rkm). 6. Detailed instructions on issues related with safety of Signalling, e.g. 11.02.2026 208 mandatory correspondence check, alteration work protocol, preparation of completion drawing, etc. have been issued. 7. System of disconnection and reconnection for S&T equipment as per protocol has been re-emphasized. 8. All locomotives are equipped with Vigilance Control Devices (VCD) to improve alertness of Loco Pilots. 9. Retro-reflective sigma boards are provided on the mast which is located two OHE masts prior to the signals in electrified territories to alert the crew about the signal ahead when visibility is low due to foggy weather. 10. A GPS based Fog Safety Device (FSD) is provided to loco pilots in fog affected areas which enables loco pilots to know the distance of the approaching landmarks like signals, level crossing gates, etc. 11. Modern track structure consisting of 60kg, 90 Ultimate Tensile Strength (UTS) rails, Prestressed Concrete Sleeper (PSC) Normal/Wide base sleepers with elastic fastening, fan shaped layout turnout on PSC sleepers, Steel Channel/H-beam Sleepers on girder bridges is used while carrying out primary track renewals. 12. Mechanisation of track laying activity through use of track machines like PQRS, TRT, T-28 etc. to reduce human errors. 13. Maximizing supply of 130m/260m long rail panels for increasing progress of rail renewal and avoiding welding of joints, thereby improving safety. 11.02.2026 209 14. Ultrasonic Flaw Detection (USFD) testing of rails to detect flaws and timely removal of defective rails. 15. Laying of longer rails, minimizing the use of Alumino Thermic Welding and adoption of better welding technology for rails i.e., Flash Butt Welding. 16. Monitoring of track geometry by OMS (Oscillation Monitoring System) and TRC (Track Recording Cars). 17. Patrolling of railway tracks to look out for weld/rail fractures. 18. The use of Thick Web Switches and Weldable CMS Crossing in turnout renewal works. 19. Inspections at regular intervals are carried out to monitor and educate staff for observance of safe practices. 20. Web based online monitoring system of track assets viz. Track database and decision support system has been adopted to decide rationalized maintenance requirement and optimize inputs. 21. Detailed instructions on issues related with safety of Track, e.g. integrated block, corridor block, worksite safety, monsoon precautions, etc. have been issued. 22. Preventive maintenance of railway assets (Coaches & Wagons) is undertaken to ensure safe train operations. 23. Replacement of conventional ICF design coaches with LHB design coaches is being done. 11.02.2026 210 24. All unmanned level crossings (UMLCs) on Broad Gauge (BG) route have been eliminated by January 2019. 25. Safety of Railway Bridges is ensured through regular inspection of Bridges. The requirement of repair/rehabilitation of Bridges is taken up based upon the conditions assessed during these inspections. 26. Indian Railways has displayed Statutory “Fire Notices” for widespread passenger information in all coaches. Fire posters are provided in every coach so as to educate and alert passengers regarding various Do’s and Don’ts to prevent fire. These include messages regarding not carrying any inflammable material, explosives, prohibition of smoking inside the coaches, penalties etc. 27. Production Units are providing Fire detection and suppression system in newly manufactured Power Cars and Pantry Cars, Fire and Smoke detection system in newly manufactured coaches. Progressive fitment of the same in existing coaches is also underway by Zonal Railways in a phased manner. 28. Regular counselling and training of staff is undertaken. 29. Concept of Rolling Block introduced in Indian Railways (Open Lines) General Rules vide Gazette notification dated 30.11.2023, wherein work of integrated maintenance/ repair/replacement of assets is planned up to 52 weeks in advance on rolling basis and executed as per plan. The details of the Safety related works related to better maintenance 11.02.2026 211 practices, Technological improvements, better infrastructure and rolling stock etc. undertaken by Railways are tabulated below:- S.N. Item 2004-05 to 2013-14 2014-15 to 2024-25 2014-25 Vs. 2004-14 Technological Improvements 1. Use of high-quality rails (60 Kg) (Km) 57,450 Km 1.43 Lakh Km More than 2 times 2. Longer Rail Panels (260m) (Km) 9,917 Km 77,522 Km Nearly 8 times 3. Electronic Interlocking (Stations) 837 Stations 3,691 Stations More than 4 times 4. Fog Pass Safety Devices (Nos.) As on 31.03.14: 90 Nos. As on 31.03.25: 25,939 Nos. 288 times 5. Thick Web Switches (Nos.) Nil 28,301 Nos. Better Maintenance Practices 1. Primary Rail Renewal (Track Km) 32,260 Km 49,941 Km 1.5 times 2. USFD (Ultra Sonic Flaw detection) Testing of Welds (Nos.) 79.43 Lakh 2 Crore More than 2 times 3. Weld failures (Nos.) In 2013-14: 3699 Nos. In 2024-25: 370 Nos. 90 % reduction 4. Rail fractures (Nos.) In 2013-14: 2548 Nos. In 2024-25: 289 Nos. More than 88% reduction Better Infrastructure and Rolling Stock 1. New Track KM added (Track Km) 14,985 Km 34,428 Km More than 2 times 2. Flyovers 4,148 Nos. 13,808 Nos. More than 3 11.02.2026 212 मेरठ म¤ तारामंडल/वेधशाला 1855. ®ी अŁण गोिवलः ³या िव²ान और ÿौīोिगकì मंýी यह बताने कì कृपा कर¤गे िकः (क) ³या सरकार का खगोल िव²ान म¤ भारतीयŌ कì Łिच, िजसके कारण ÿाचीन काल से úहŌ और न±ýŌ से संबंिधत महÂवपूणª खोज¤ हòई ह§ और वै²ािनक ®ी राकेश शमाª और सु®ी सुनीता िविलयÌस के अंतåर± याýा के बाद अंतåर± िव²ान म¤ भारतीय ब¸चŌ कì Łिच काफì बढ़ गई है, को Åयान म¤ रखते हòए मेरठ म¤ एक तारामंडल और वेधशाला Öथािपत करने का िवचार है और यिद हां, तो तÂसंबंधी Êयौरा ³या है; (ख) ³या सरकार का लखनऊ, वाराणसी और ÿयागराज जैसे उ°र ÿदेश के अÆय भागŌ कì तजª पर मेरठ म¤ भी तारामंडल या वेधशाला Öथािपत करने का िवचार है; और (ग) यिद हां, तो इसे कब तक Öथािपत िकए जाने कì संभावना है? िव²ान और ÿौīोिगकì मंýालय के राºय मंýी; पृÃवी िव²ान मंýालय के राºय मंýी; ÿधानमंýी कायाªलय म¤ राºय मंýी; कािमªक, लोक िशकायत और प¤शन मंýालय म¤ राºय मंýी; परमाणु ऊजाª िवभाग म¤ राºय मंýी; तथा अंतåर± िवभाग म¤ राºय मंýी (डॉ. िजत¤þ िसंह): (RoBs)/Underpasses (RUBs) (Nos.) times 3. Unmanned Level crossings (Nos.) on BG As on 31.03.14: 8,948 As on 31.03.24:Nil (All eliminated by 31.01.19) Removed 4. Manufacture of LHB Coaches (Nos.) 2,337 Nos. 42,677 More than 18 times 11.02.2026 213 (क) से (ग): सरकार देश म¤ खगोल िव²ान और अंतåर± िव²ान के ÿित बढ़ती łिच को, िवशेषकर छाýŌ के बीच, तथा वै²ािनक सोच और िव²ान के ÿित जन सहभािगता को बढ़ावा देने म¤ तारामंडलŌ और वेधशालाओं जैसी संÖथाओं कì भूिमका को माÆयता देती है। भारतीय खगोल भौितकì संÖथान (आईआईए), ब¤गलुŁ, जो िव²ान और ÿौīोिगकì िवभाग के अधीन एक Öवाय° संÖथान है, Ĭारा मैसूŁ म¤ āĺांड िव²ान िश±ा एवं अनुसंधान ÿिश±ण क¤þ (कॉÖमॉस) कì Öथापना कì जा रही है। इस क¤þ कì Öथापना को डीएसटी, डीएई, डीओएस, पीएसए के कायाªलय और माननीय िव° मंýी के सांसद Öथानीय ±ेý िवकास योजना (एमपीएलएडीएस) िनिध के अंतगªत िव°ीय सहायता ÿदान कì जा रही है। अÂयाधुिनक, दुिनया का पहला 8के रेज़ोÐयूशन वाला एलईडी डोम तारामंडल, आरएसए कॉसमॉस कì अÂयाधुिनक एलईडी तकनीक का उपयोग करते हòए 360-िडúी का शानदार ŀÔय अनुभव ÿदान करता है, जो पारंपåरक ÿोजे³शन ÿणािलयŌ से कहé ®ेÕठ है। चामुंडी पहाड़ी के पास मैसूर िवĵिवīालय म¤ िÖथत, यह तारामंडल खगोल िव²ान और एसटीईएम (िव²ान, ÿौīोिगकì, अिभयांिýकì और गिणत) िश±ा को बढ़ावा देने पर Åयान क¤िþत करता है, साथ ही दूरबीनŌ से ÿाĮ åरयल टाइम डेटा का उपयोग करके डेटा िवĴेषण म¤ िश±कŌ और छाýŌ को ÿिशि±त करता है। संÖकृित मंýालय के अधीन एक Öवाय° संगठन, राÕůीय िव²ान संúहालय पåरषद (एनसीएसएम), "िव²ान संÖकृित संवधªन योजना (एसपीओसीएस)" कì कायाªÆवयन एज¤सी है, िजसके अंतगªत िविभÆन राºय सरकारŌ और संघ राºय ±ेýŌ, जो अपने यहां िव²ान शहर, िव²ान क¤þ, िडिजटल तारामंडल, वेधशाला नवाचार क¤þ आिद Öथािपत करने के इ¸छुक ह§, से ÿाĮ ÿÖतावŌ के आधार पर देश भर म¤ िव²ान शहर, िव²ान क¤þ, िडिजटल तारामंडल, नवाचार क¤þ आिद Öथािपत िकए जाते ह§। हालांिक, अभी तक मेरठ म¤ तारामंडल/वेधशाला Öथािपत करने का कोई ÿÖताव नहé है। 11.02.2026 214 APPLICATION OF SPACE-BASED SYSTEMS FOR NATIONAL DEVELOPMENT GOALS 1856. SHRI JASHUBHAI BHILUBHAI RATHVA:
वक्ता Bhaskar Murlidhar Bhagare
कब कहा
किस वाद-विवाद में Papers laid on the Table of the house by Ministers/Members
Bhaskar Murlidhar BhagareSession ls-18-s7Papers laid on the Table of the house by Ministers/MembersLok Sabha Proceedings