Statement
Will the Minister of CIVIL AVIATION be pleased to state: (a) whether the Government has prescribed uniform national safety standards for aero-sports such as paragliding and skydiving covering pilot licensing, equipment certification, passenger insurance, operator accreditation and mechanisms to monitor compliance and if so, the details thereof; (b) whether the GAGAN is being leveraged for navigation accuracy, pilot 12.03.2026 1023 tracking, distress alerts and emergency response for adventure aviation activities at locations such as Bir Billing and Kullu-Manali and during international events including the Paragliding World Cup held at Panchgani in February 2026 and if so, the details thereof; (c) the current status of operationalisation of the Air Sports Federation of India under the National Air Sports Policy, 2022; (d) the number of accidents, fatalities and serious injuries reported in aero- sports including paragliding and skydiving during the last three years, activity- wise; and (e) the steps taken/proposed to be taken to prevent such accidents in the States such as Himachal Pradesh and Uttarakhand including improved weather forecasting and real-time advisories, crowd and launch-site regulation, inter-agency coordination and strengthened accountability of pilots and operators? THE MINISTER OF STATE IN THE MINISTRY OF COOPERATION; AND MINISTER OF STATE IN THE MINISTRY OF CIVIL AVIATION (SHRI MURLIDHAR MOHOL): (a): The National Air Sports Guidelines, 2023 (NASG- 2023) have been issued by the Ministry of Civil Aviation. It establishes a national framework for air sports through the Air Sports Federation of India (ASFI). NASG outlines the governance structure, safety, security, registration, flight permission along with provisions of penalty, suspension and cancellation for non-compliances in Air Sports activities such as paragliding and skydiving. 12.03.2026 1024 DGCA oversees safety requirements and licensing for DGCA- regulated categories such as gliders, micro-lights, Light Sport Aircraft (LSA), gyroplanes, balloons, drones, powered hang gliders, in accordance with the Aircraft Rules, 1937 and DGCA Civil Aviation Requirements issued thereunder. (b): GAGAN implemented by Indian Space Research Organisation (ISRO) and the Airports Authority of India (AAI) as a Satellite Based Augmentation System (SBAS) is primarily designed for use of civil aviation sector providing required guidance for suitable equipped aircrafts and crew. (c): National Air Sports Guidelines 2023 have since replaced the National Air Sports Policy 2022. Air Sports Federation of India (ASFI) has been constituted under the Chairmanship of Secretary (Civil Aviation) in accordance with NASG 2023. (d): At present, accident and incident data relating to aero-sports activities are largely maintained at State level. The accidents, fatalities, and serious injuries in air sports are not mandatorily reported to the Directorate General of Civil Aviation. (e): To enhance safety and prevent accidents in Air Sports activities, including in States such as Himachal Pradesh and Uttarakhand, Ministry of Civil Aviation has taken several steps such as:- i. DGCA has advised all State Governments to ensure effective implementation of the provisions of the National Air Sports Guidelines, 2023 (NASG-2023) and to disseminate the guidelines to district authorities for enforcement of necessary safety measures. DGCA has also engaged with State authorities to 12.03.2026 1025 sensitize them on key safety requirements prior to the grant of permissions for Air Sports activities. ii. States have been advised to issue or update comprehensive State-level guidelines for paragliding and other Air Sports, covering aspects such as verification of aircraft/equipment maintenance, pilot licensing and ratings, launch-site regulation, crowd management, inter-agency coordination, accident and incident reporting mechanisms, rescue arrangements and compensation framework. iii. DGCA has constituted a Committee to draft comprehensive Air Sports Rules covering safety, training, airworthiness, licensing, oversight and enforcement for all Air Sports activities, including paragliding. iv. The Aero Club of India (ACI -NAC India), the Air Sports Federation of India (ASFI) and DGCA are actively engaging with State Governments and Union Territories to facilitate alignment of air sports activities with nationally prescribed standards relating to safety, licensing, accreditation and oversight. िवīुत उÂपादन ±मता 3431. ®ी अशोक कुमार रावत: ³या िवīुत मंýी यह बताने कì कृपा कर¤गे िकः (क) वतªमान म¤ देश म¤ संÖथािपत िवīुत उÂपादन ±मता िकतनी है; (ख) ³या कोयला, जल िवīुत, सौर, पवन और परमाणु ऊजाª जैसे िविभÆन ąोतŌ के माÅयम से उÂपािदत िवīुत के िहÖसे के संबंध म¤ कोई आकलन िकया गया है और यिद हां, तो तÂसंबंधी Êयौरा ³या है; 12.03.2026 1026 (ग) िकन-िकन राºयŌ से िवīुत कटौती के संबंध म¤ सवाªिधक िशकायत¤ ÿाĮ हòई ह§; और (घ) úामीण और शहरी ±ेýŌ म¤ िवīुत आपूितª कì दैिनक औसत उपलÊधता िकतनी है? िवīुत मंýालय म¤ राºय मंýी; तथा नवीन और नवीकरणीय ऊजाª मंýालय म¤ राºय मंýी (®ी ®ीपाद येसो नाईक): (क) : वतªमान म¤ देश म¤ संÖथािपत उÂपादन ±मता 5,20,511 मेगावाट है (जनवरी 2026 तक) और इसके ąोत-वार Êयौरा संलμन िववरण-I म¤ िदया गया है। (ख) : िपछले पांच िव° वषŎ और वतªमान िव° वषª (जनवरी 2026 तक) म¤ देश म¤ ताप, जल, Æयूि³लयर और नवीकरणीय ऊजाª सिहत िविभÆन ąोतŌ से उÂपािदत िवīुत का Êयौरा संलμन िववरण-II पर िदया गया है। (ग) : िव° वषª 2025-26 (जनवरी 2026 तक) के िलए राºयवार ‘ऊजाª आवÔयकता’ और ‘ऊजाª आपूितª’ का Êयौरा संलμन िववरण-III पर िदया गया है। ये Êयौरे दशाªते ह§ िक ऊजाª आपूितª लगभग ऊजाª आवÔयकता के अनुłप रही है, िजसम¤ केवल मामूली अंतर है, जो सामाÆयतः राºय के पारेषण/िवतरण नेटवकª बाधाओं के कारण होता है। (घ) : वतªमान िव° वषª 2025-26 (िदसंबर 2025 तक) म¤ úामीण और शहरी ±ेýŌ म¤ औसत िवīुत आपूितª के घंटे øमशः 22.6 और 23.4 ह§। िववरण-I देश कì वतªमान संÖथािपत िवīुत ±मता का Êयौरा, िजसम¤ ताप िवīुत, जल िवīुत, Æयूि³लयर और नवीकरणीय/गैर-जीवाÔम ऊजाª ąोतŌ का ÿितशत-वार िहÖसा शािमल है: ®ेणी संÖथािपत उÂपादन ±मता (मेगावाट) कुल % म¤ िहÖसा जीवाÔम ईंधन कोयला 2,21,210 42.5% िलμनाइट 6,620 1.3% गैस 20,122 3.9% डीजल 589 0.1% कुल जीवाÔम ईंधन: 2,48,542 47.7% 12.03.2026 1027 गैर-जीवाÔम ईंधन आरईएस (जल िवīुत सिहत) 2,63,189 50.6% जल िवīुत 51,165 9.8% पवन, सौर और अÆय आरई 2,12,025 40.7% पवन 54,650 10.5% सौर 1,40,602 27.0% जैव िवīुत/सह-उÂपादन 10,757 2.1% अपिशĶ से ऊजाª 857 0.2% लघु जल िवīुत 5,159 1.0% Æयूि³लयर 8,780 1.7% कुल गैर-जीवाÔम ईंधन: 2,71,969 52.3% कुल संÖथािपत ±मता (जीवाÔम ईंधन एवं गैर-जीवाÔम ईंधन) 5,20,511 100% िववरण-II िपछले पांच िव° वषŎ और वतªमान िव° वषª (जनवरी, 2026 तक) के दौरान ताप िवīुत, जल िवīुत, Æयूि³लयर और नवीकरणीय ऊजाª सिहत िविभÆन ąोतŌ से देश म¤ उÂपािदत िवīुत का Êयौरा: (सभी उÂपादन आंकड़े िमिलयन यूिनट (एमयू) म¤)) ईंधन 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 (जनवरी'26 तक) ताप िवīुत कोयला 9,50,937.5 5 10,41,487. 43 11,45,907. 58 12,60,902. 62 12,98,872. 29 10,31,882. 53 डीजल/एचएस डी 126.31 117.24 229.71 400.58 442.65 358.21 िलμनाइट 30,505.68 37,094.04 36,188.34 33,949.79 32,994.77 24,906.72 बहò ईंधन 0.00 0.00 0.00 0.00 0.00 0.00 नैÈथा 101.41 0.00 0.83 0.03 0.00 0.00 ÿाकृितक गैस 50,842.59 36,015.77 23,884.21 31,295.91 31,580.05 22,764.15 ताप िवīुत कुल 10,32,513. 54 11,14,714. 48 12,06,210. 67 13,26,548. 93 13,63,889. 76 10,79,911. 61 Æयूि³लयर 43,029.08 47,112.06 45,861.09 47,937.41 56,680.83 45,193.67 कुल [पारंपåरक] 10,75,542. 11,61,826. 12,52,071. 13,74,486. 14,20,570. 11,25,105. 12.03.2026 1028 62 54 76 34 59 28 आरईएस (बड़ी जल िवīुत को छोड़कर) पवन 60,149.95 68,640.07 71,814.16 83,385.35 83,347.19 95,586.95 सौर 60,402.26 73,483.94 1,02,014.2 4 1,15,975.1 1 1,44,150.2 3 1,38,386.9 3 बायोमास 3,512.98 3,482.70 3,161.32 3,417.19 3,738.67 3,377.60 खोई 11,302.85 12,573.88 12,863.16 10,825.59 9,335.32 7,635.91 लघु जल िवīुत 10,258.41 10,463.55 11,170.62 9,485.04 11,568.04 10,885.08 अÆय 1,621.06 2,268.17 2,529.18 2,746.55 2,869.73 2,453.59 बड़ी जल िवīुत 1,50,299.5 2 1,51,627.3 3 1,62,098.7 7 1,34,053.9 2 1,48,633.9 8 1,50,039.1 2 कुल [नवीकरणीय] 2,97,547.0 3 3,22,539.6 3 3,65,651.4 5 3,59,888.7 5 4,03,643.1 6 4,08,365.1 8 भूटान से आयात 8,765.50 7,493.20 6,742.40 4,716.10 5,484.18 7,765.68 कुल योग 13,81,855. 15 14,91,859. 37 16,24,465. 61 17,39,091. 19 18,29,697. 93 15,41,236. 14 िववरण-III िव° वषª 2025-26 (जनवरी, 2026 तक) के िलए ऊजाª आवÔयकता और आपूितª कì गई ऊजाª का राºय-वार Êयौरा: राºय/ÿणाली/±ेý अÿैल,2025 – जनवरी,2026 ऊजाª आवÔयकता आपूितªत ऊजाª अनापूितªत ऊजाª (एमयू) (एमयू) (एमयू) (%) चंडीगढ़ 1,658 1,658 1 0.0 िदÐली 33,809 33,801 8 0.0 हåरयाणा 61,111 61,046 65 0.1 िहमाचल ÿदेश 11,561 11,520 40 0.3 संघ राºय ±ेý जÌमू एवं कÔमीर और लĥाख 16,840 16,824 16 0.1 पंजाब 65,972 65,913 59 0.1 राजÖथान 93,062 93,062 0 0.0 उ°र ÿदेश 1,41,475 1,41,449 26 0.0 उ°राखंड 14,081 14,027 53 0.4 छ°ीसगढ़ 34,968 34,960 8 0.0 गुजरात 1,30,452 1,30,452 0 0.0 मÅय ÿदेश 85,679 85,670 9 0.0 12.03.2026 1029 महाराÕů 1,66,392 1,66,383 9 0.0 दादरा एवं नगर हवेली और दमन एवं दीव 9,372 9,372 0 0.0 गोवा 4,528 4,528 0 0.0 आंň ÿदेश 66,329 66,323 6 0.0 तेलंगाना 69,259 69,252 7 0.0 कनाªटक 76,580 76,571 9 0.0 केरल 25,558 25,556 3 0.0 तिमलनाडु 1,10,000 1,09,990 10 0.0 पुडुचेरी 2,947 2,944 3 0.1 ल±Ĭीप (#) 60 60 0 0.0 िबहार 40,749 40,735 14 0.0 डीवीसी 20,708 20,704 3 0.0 झारखंड 13,005 13,000 5 0.0 ओिडशा 37,290 37,284 6 0.0 पिIJम बंगाल 61,969 61,906 63 0.1 िसि³कम 444 444 0 0.0 अंडमान-िनकोबार (#) 354 336 18 5.2 अŁणाचल ÿदेश 1,007 1,007 0 0.0 असम 11,875 11,875 1 0.0 मिणपुर 978 975 3 0.3 मेघालय 1,741 1,741 0 0.0 िमजोरम 629 629 0 0.0 नागाल§ड 849 849 0 0.0 िýपुरा (*) 1,655 1,654 0 0.0 अिखल भारतीय 14,27,436 14,27,009 427 0.0 उºजैन म¤ राÕůीय राजमागŎ का उÆनयन 3432. ®ी अिनल िफरोिजया: ³या सड़क पåरवहन और राजमागª मंýी यह बताने कì कृपा कर¤गे िक: (क) उºजैन म¤ राÕůीय राजमागŎ (एनएच) के उÆनयन कì वतªमान िÖथित ³या है; (ख) लंिबत सड़क पåरयोजनाओं के पूणª होने कì अपेि±त समय-सीमा ³या है; (ग) सड़क दुघªटनाओं को कम करने के िलए ³या िविशĶ कदम उठाए गए ह§; (घ) उºजैन बाईपास या åरंग रोड के िनमाªण कì योजना संबंधी Êयौरा ³या है; और 12.03.2026 1030 (ङ) úामीण सड़कŌ को राÕůीय राजमागŎ से जोड़ने के ÿÖतावŌ संबंधी Êयौरा ³या है? सड़क पåरवहन और राजमागª मंýी (®ी िनितन जयराम गडकरी): (क) और (ख): उºजैन म¤ राÕůीय राजमागŎ के उÆनयन कì िÖथित/िववरण िनÌनानुसार ह§: ø.सं. पåरयोजना का नाम लंबाई (िकमी म¤) वतªमान िÖथित 1 एनएच-752डी का 4-लेन देवास-उºजैन मागª 41.42 पूणª 2 एनएच-752डी का 4-लेन उºजैन-बदनावर मागª 69.10 पूणª 3 राÕůीय ए³सÿेसवे-4 के साथ एनएच-752डी के उºजैन-गरोठ इंटरच¤ज का 4-लेन मागª। 136.76 पूणª 4 एनएच-552जी का उºजैन-झालावाड़ मागª 133.57 पेÓड शोÐडर सिहत दो लेन सड़क का िनमाªण पूणª है और इसे चार लेन म¤ बनाने हेतु िवÖतृत पåरयोजना åरपोटª (डीपीआर) तैयार करने के चरण म¤ है। 5 एनएच-752डी के बदनवार-पेटलावाड-थंडला- ितमारवानी खंड का 4 लेन का िनमाªण 80.45 िदनांक 10.03.2026 को अनुमोिदत। (ग): भारतीय सड़क कांúेस (आईआरसी) के मानदंडŌ और िविनद¥शŌ/िदशािनद¥शŌ के अनुसार सभी सुर±ा उपाय पूरे कर िलए गए ह§। (घ): उºजैन म¤ िनÌनिलिखत िववरण के अनुसार दो बाईपास का िनमाªण िकया गया है: ø.सं. पåरयोजना का नाम लंबाई (िकमी म¤) 1 एनएच-752डी का 4-लेन देवास-उºजैन बाईपास (उºजैन बाईपास) 7.067 2 एनएच-752डी का 4-लेन उºजैन-बदनावर मागª (उºजैन बाईपास) 13.413 (ङ): सरकार का सड़क पåरवहन और राजमागª मंýालय मु´य łप से राÕůीय राजमागŎ के िवकास के िलए उ°रदायी है, और úामीण/गांव कì सड़कŌ का िवकास संबंिधत राºय सरकारŌ के अिधकार ±ेý के अंतगªत आता है। PRICES OF PETROL, DIESEL AND LPG 3433. SHRI E T MOHAMMED BASHEER: 12.03.2026 1031 Will the Minister of PETROLEUM AND NATURAL GAS be pleased to state: (a) the steps being taken by the Government in the short term to keep petrol, diesel and LPG prices stable for domestic consumers despite fluctuations in global crude oil prices; and (b) whether the Government plans to use measures such as changes in taxes, subsidies or fuel reserves to prevent sudden price hikes and if so, the details thereof? THE MINISTER OF STATE IN THE MINISTRY OF PETROLEUM AND NATURAL GAS; AND MINISTER OF STATE IN THE MINISTRY OF TOURISM (SHRI SURESH GOPI): (a) and (b): Prices of petrol and diesel in the country are market-determined and the Public Sector Oil Marketing Companies (OMCs) take appropriate decision on pricing of petrol and diesel. Government makes fiscal interventions whenever necessary to calibrate the tax structure applicable for petroleum products. Central Excise duty was reduced by the Central Government by a total of Rs. 13/litre and Rs. 16/litre on petrol and diesel respectively in two tranches in November 2021 and May 2022, which was fully passed on to consumers. In March, 2024, OMCs reduced the retail prices of petrol and diesel by Rs. 2 per litre each. But in April 2025, when excise duty on Petrol and Diesel was increased by Rs. 2 per litre each it was not passed on to consumers. The retail selling price of a 14.2 Kg domestic LPG cylinder is currently Rs. 913 in Delhi. After a targeted subsidy of Rs. 300/cylinder to PMUY 12.03.2026 1032 consumers, Government of India is providing 14.2 Kg LPG cylinders at an effective price of Rs. 613 per cylinder (in Delhi) to all eligible PMUY beneficiaries. Government has paid a compensation of Rs. 22,000 crore to OMCs in FY 2022-23 and has approved another compensation of Rs. 30,000 crore in FY 2025-26. To augment domestic LPG availability, the Ministry directed all domestic/SEZ refineries and petrochemical complexes to channel C3 and C4 streams towards LPG production and supply the same exclusively to PSU OMCs, in exercise of powers under Section 3 of the Essential Commodities Act, 1955 read with Clauses 3 and 5 of the Petroleum Products (Maintenance of Production, Storage and Supply) Order, 1999. Government of India, through a Special Purpose Vehicle called Indian Strategic Petroleum Reserve Limited (ISPRL), has established Strategic Petroleum Reserves (SPR) facilities with total capacity of 5.33 Million Metric Tonnes (MMT) of crude oil. वन ±ेý म¤ सड़कŌ का िनमाªण 3434. ®ी अमर शरदराव काले: ³या सड़क पåरवहन और राजमागª मंýी यह बताने कì कृपा कर¤गे िक: (क) ³या वधाª िजले म¤ महाराÕů राºय अवसंरचना िवकास िनगम (एमएसआईडीसी) के हाइिāड एÆयुइटी ÿोúाम (चरण-II) के अंतगªत कारंजा-वाघोड़ा-जलालखेड़ा रोड (एसएच-323) और िहंगानी बोर धरण-धानोली-काजली-सावली से राÕůीय राजमागª-06 रोड (एमडीआर-58) के 12.03.2026 1033 सुधार कायŎ म¤ वन ±ेý से गुजरने वाली लगभग 4.52 िकलोमीटर सड़क को शािमल िकया गया है; (ख) ³या उĉ कायª के िलए वन िवभाग से आवÔयक अनुमित/अनापि° ÿमाण पý (एनओसी) ÿाĮ कर िलया गया है; (ग) यिद नहé, तो िबना अनुमित के कायª आदेश जारी करने, पुलŌ के िनमाªण और पेड़Ō कì कटाई के संबंध म¤ सरकार Ĭारा ³या कारªवाई कì गई है या िकए जाने का ÿÖताव है; (घ) ³या सरकार के सं²ान म¤ यह आया है िक उĉ ±ेý बाघŌ, भालुओं आिद जैसे जंगली जानवरŌ के आवास के अंतगªत आता है और सड़क िनमाªण से पाåरिÖथितकì तंý और वÆयजीवŌ पर ÿितकूल ÿभाव पड़ सकता है; और (ङ) यिद हाँ, तो वन, पयाªवरण और वÆयजीवŌ के संर±ण के िलए ³या कारªवाई कì गई है? सड़क पåरवहन और राजमागª मंýी (®ी िनितन जयराम गडकरी): (क) से (ङ) सरकार का सड़क पåरवहन और राजमागª मंýालय राÕůीय राजमागŎ के िवकास और रखरखाव से संबंिधत है। कारंजा-वाघोड़ा-जलालखेड़ा सड़क (एसएच-323) और िहंगानी बोर धरण-धानोली-काजली-सावली से राÕůीय राजमागª-06 तक सड़क (एमडीआर-58) राºय कì सड़क¤ ह§, िजनका िवकास महाराÕů राºय अवसंरचना िवकास िनगम (एमएसआईडीसी) Ĭारा राºय सरकार कì िनिध के माÅयम से िकया जा रहा है। DELAY IN DISBURSING LOANS UNDER PMEGP 3435. SHRI BHASKAR MURLIDHAR BHAGARE: Will the Minister of MICRO, SMALL AND MEDIUM ENTERPRISES be pleased to state: (a) whether the Government has examined the persistent and disproportionate delays in sanctioning and disbursing loans under the 12.03.2026 1034 Prime Minister’s Employment Generation Programme (PMEGP) in Tribal and Scheduled Area districts of Maharashtra, including the average time taken from application to final disbursement, district-wise and if so, the details thereof; (b) whether the Government is aware that a large number of PMEGP applications in tribal districts such as Nandurbar, Gadchiroli, Palghar and parts of Nashik remain pending for prolonged periods, leading to cost escalation, beneficiary withdrawals and low conversion of approvals into functional enterprises and if so, the details thereof; (c) whether data has been compiled on rejection rates, repeated documentation demands and bank-wise performance in these tribal districts; (d) the steps taken to address structural bottlenecks in bank appraisal, credit aversion and inter-agency coordination in tribal Maharashtra; and (e) whether a State-specific accountability and monitoring mechanism is proposed to ensure timely, transparent and inclusive PMEGP loan sanctions in tribal areas and if so, the details thereof? THE MINISTER OF STATE IN THE MINISTRY OF MICRO, SMALL AND MEDIUM ENTERPRISES; AND MINISTER OF STATE IN THE MINISTRY OF LABOUR AND EMPLOYMENT (KUMARI SHOBHA KARANDLAJE): (a) and (b): The Government is implementing the Prime Minister’s Employment Generation Programme (PMEGP) through the Khadi and Village Industries Commission (KVIC) and regularly reviews its implementation 12.03.2026 1035 includingdelays in loan sanctioning and disbursementacross the country including in the Tribal and Scheduled Area districts of Maharashtra. Under PMEGP, the final sanctioning of projects and release of loans are done by the concerned financing banks after appraising the viability of each project. State Level Bankers Meetings and District level Bankers Meetings are heldto ensure proper sanctioning of loans and disbursement. Further, State Level Monitoring Committee (SLMC) and District Level Monitoring Committee (DLMC) meetings are held at State and District levels on a regular basis to monitor and review the scheme’s implementation. As per available data, the average turnaround time for disbursement of loan after loan sanction has come down from 42 days in FY 2023-24 to 27 days in FY 2025-26 at a National level. (c): Under PMEGP, key performance parameters of the scheme including bank-wise performance, rejection rates of applications along with detailed reasons for rejection as recorded by the banks etc. across the country including in the tribal districts of Maharashtra are being tracked and compiled through the online PMEGP portal. (d) and (e): Recent steps undertaken to address structural bottlenecks in bank appraisal, credit aversion and inter-agency coordination including state-specific monitoring mechanisms under PMEGP include the following: i. Top level Banker’s meetings, State Level Bankers Meetings and District level Bankers Meetings are held on a regular basis to ensure proper sanctioning of loans and disbursement of margin money. ii. State Level Monitoring Committee and District Level Monitoring 12.03.2026 1036 Committee meetings held at State and District levels on a regular basis to monitor and review the implementation of PMEGP. iii. Review of rejection reasons by Banks and removal of reasons i.e. "Out of Service Area" and "Target Achieved" as basis for rejection of PMEGP applications by banks. iv. A wide range of more than 1,000 model Detailed Project Reports have been prepared on various industries and made available on the PMEGP online portal to improve quality of proposals. v. Regular participation of Banks in applicant awareness and outreach programmes organised by Implementing Agencies to identify potential beneficiaries and provide necessary guidance and handholding support during the application process. vi. Financial literacy camps and customer awareness programmes conducted by Banks to educate prospective entrepreneurs about various initiatives of the Government, including PMEGP. उ°र ÿदेश म¤ डीडीयूजीजेवाई के अंतगªत कायª 3436. ®ी देवेश शा³य: ®ी बाबू िसंह कुशवाहा: ³या िवīुत मंýी यह बताने कì कृपा कर¤गे िकः (क) उ°र ÿदेश के एटा, कासगंज और जौनपुर िजलŌ म¤ दीनदयाल उपाÅयाय úाम ºयोित योजना (डीडीयूजीजेवाई) के अंतगªत वषª 2020 से Öवीकृत और पूणª िकए गए कायŎ का िजला-वार Êयौरा ³या है; 12.03.2026 1037 (ख) इन िजलŌ म¤ फìडर पृथ³करण, उप-पारेषण लाइनŌ के सुŀढ़ीकरण, नए ůांसफामªरŌ कì Öथापना और úामीण िवīुतीकरण के िलए Öवीकृत धनरािश और िकए गए Óयय का िजला- वार Êयौरा ³या है; (ग) ³या एटा, कासगंज और जौनपुर के कुछ úामीण ±ेýŌ म¤ अभी भी वोÐटेज कì समÖया, िůिपंग और लाइन लॉस के संबंध म¤ िशकायत¤ ÿाĮ हो रही ह§ और यिद हां, तो तÂसंबंधी Êयौरा ³या है और सरकार Ĭारा इन समÖयाओं के समाधान के िलए ³या कदम उठाए गए ह§; और (घ) ³या सरकार इन िजलŌ म¤ शेष लंिबत कायŎ को समयबĦ तरीके से पूरा करने के िलए कोई िवशेष कायª योजना तैयार कर रही है और यिद हां, तो तÂसंबंधी Êयौरा ³या है? िवīुत मंýालय म¤ राºय मंýी; तथा नवीन और नवीकरणीय ऊजाª मंýालय म¤ राºय मंýी (®ी ®ीपाद येसो नाईक): (क) और (ख) : भारत सरकार ने वषª 2014 म¤ úामीण ±ेýŌ म¤ िवतरण अवसंरचना को सुŀढ़ करने और गांवŌ के िवīुतीकरण के िलए दीन दयाल उपाÅयाय úाम ºयोित योजना (डीडीयूजीजेवाई) शुł कì। यह Öकìम िदनांक 31.03.2022 को बंद हो चुकì है। डीडीयूजीजेवाई के अंतगªत उ°र ÿदेश के एटा, कासगंज और जौनपुर िजलŌ म¤ िकए गए कायª और िव°ीय Êयौरा संलμन िववरण-I पर िदया गया ह§। (ग) और (घ) : चूंिक िवīुत एक समवतê िवषय है, उपभोĉाओं को िवīुत कì आपूितª और िवतरण संबंिधत राºय सरकार/िवतरण यूिटिलटी के अिधकार ±ेý म¤ है। भारत सरकार िविभÆन ÖकìमŌ के माÅयम से राºयŌ के ÿयासŌ म¤ सहायता देती है तािक वे सभी उपभोĉाओं को गुणव°ापूणª और िवĵसनीय िवīुत आपूितª ÿदान करने के उĥेÔय को ÿाĮ कर सक¤। उपभोĉाओं को िव°ीय łप से िÖथर और ÿचालनाÂमक łप से द± िवतरण ±ेý के माÅयम से गुणव°ापूणª और िवĵसनीय िवīुत आपूितª ÿदान करने के उĥेÔय से, भारत सरकार ने जुलाई 2021 म¤ संशोिधत िवतरण ±ेý Öकìम (आरडीएसएस) शुł कì। इस Öकìम के अंतगªत, िवतरण यूिटिलटी को उसके Ĭारा ÿÖतुत ÿÖतावŌ के आधार पर िवतरण अवसंरचना कायŎ जैसे 12.03.2026 1038 िक सब-Öटेशन और िवतरण ůांसफॉमªरŌ का उÆनयन/िवÖतार, कंड³टरŌ का ÿितÖथापन, नई एचटी/एलटी लाइन¤, फìडर िवभाजन, फìडर पृथ³करण आिद के उÆनयन के िलए िव°ीय सहायता ÿदान कì जा रही है। इस Öकìम के अंतगªत, उ°र ÿदेश के एटा, कासगंज और जौनपुर िजलŌ के िलए øमशः ₹391 करोड़, ₹358 करोड़ और ₹711 करोड़ के िवतरण अवसंरचना कायŎ, िजसम¤ Öमाटª मीटåरंग कायª भी शािमल ह§, को Öवीकृत िकया गया है (Êयौरा िववरण-II पर संलμन है)। आरडीएसएस कì समािĮ ितिथ 31 माचª 2028 है। इसके अितåरĉ, इन िजलŌ म¤ वोÐटेज समÖयाओं, िůिपंग और लाइन हािनयŌ का समाधान करने के िलए राºयŌ Ĭारा अपनी Óयवसाय योजना के अंतगªत िविभÆन िवतरण अवसंरचना कायª िकए गए ह§। िववरण-I डीडीयूजीजेवाई के अंतगªत उ°र ÿदेश के एटा, कासगंज और जौनपुर िजलŌ म¤ िकए गए कायª और िव°ीय Êयौरा: िव°ीय Êयौरा: िजला संÖवीकृत लागत (करोड़ łपये म¤) समापन लागत (करोड़ łपये म¤) जारी जीबीएस (करोड़ łपये म¤) एटा 137.94 156.94 94.43 जौनपुर 44.78 61.46 36.97 कांशीराम नगर (कासगंज) 10.92 9.59 5.77 िकए गए ÿमुख कायª: øम सं. मद यूिनट एटा जौनपुर कांशीराम नगर (कासगंज) 1 सब-Öटेशन (अिभवृिĦ सिहत) सं´या 26 20 05 2 िवतरण ůांसफामªर सं´या 1349 123 51 3 फìडर पृथ³करण सीकेएम 880.45 00 00 4 11 केवी लाइन सीकेएम 158.42 38.99 49.87 5 एलटी लाइन सीकेएम 679.42 93.62 27.35 6 33 केवी एवं 66 केवी लाइन सीकेएम 106.76 0 18.94 12.03.2026 1039 िववरण-II आरडीएसएस के अंतगªत संÖवीकृत कायŎ का Êयौरा 1. एटा िजला (करोड़ łपये) øम सं. िववरण पåरयोजना लागत 1 Öमाटª मीटåरंग कायª 155.41 2 हािन Æयूनीकरण कायª 235.31 कुल 390.72 हािन Æयूनीकरण कायª øम सं. िववरण यूिनट संÖवीकृत पåरमाण 1 हाई ट¤शन (एचडी) लाइन सीकेएम 1,114.63 2 लो ट¤शन (एलटी) लाइन सीकेएम 53,25.99 3 नए डीटी सं´या 162 4 िवīुतीकरण के िलए संÖवीकृत घर सं´या 4,618 2. कासगंज िजला (करोड़ łपये) øम सं. िववरण पåरयोजना लागत 1 Öमाटª मीटåरंग कायª 137.46 2 हािन Æयूनीकरण कायª 220.46 कुल 357.92 हािन Æयूनीकरण कायª øम सं. िववरण यूिनट संÖवीकृत पåरमाण 1 हाई ट¤शन (एचडी) लाइन सीकेएम 1,012.45 2 लो ट¤शन (एलटी) लाइन सीकेएम 4,395.27 3 नए डीटी सं´या 85 4 िवīुतीकरण के िलए संÖवीकृत घर सं´या 2,162 12.03.2026 1040 3. जौनपुर िजला (करोड़ łपये) øम सं. िवरण पåरयोजना लागत 1 Öमाटª मीटåरंग कायª 382.98 2 हािन Æयूनीकरण कायª 328.41 कुल 711.39 हािन Æयूनीकरण कायª øम सं. िववरण यूिनट संÖवीकृत पåरमाण 1 हाई ट¤शन (एचडी) लाइन सीकेएम 963.64 2 लो ट¤शन (एलटी) लाइन सीकेएम 7,642.20 3 नए डीटी सं´या 1,004 4 िवīुतीकरण के िलए संÖवीकृत घर सं´या 9,897 DOMESTIC CONSUMPTION AND PRODUCTION OF PETROLEUM PRODUCTS 3437. DR. THOL THIRUMAAVALAVAN: Will the Minister of PETROLEUM AND NATURAL GAS be pleased to state: - (a) the details about the total amount required for the nation's domestic consumption of crude, petrol, diesel and gas; and (b) the details about the amount of domestic production of petrol, diesel and gas? THE MINISTER OF STATE IN THE MINISTRY OF PETROLEUM AND NATURAL GAS; AND MINISTER OF STATE IN THE MINISTRY OF TOURISM (SHRI SURESH GOPI): (a) : Details of the consumption of crude, petrol, diesel and gas for FY 2024- 12.03.2026 1041 25 and FY 2025-26 (till January) in the country is as follows: Product Name Consumption in FY 2024- 25 Consumption in FY 2025- 26 (till January) Crude Consumption/ Processing (in MMT) 268.6 226.7 Petrol (in MMT) 40.0 35.4 Diesel (in MMT) 91.4 78.3 Gas (in MMSCM) 71314 58095 Source: PPAC (b) : Details of the amount of domestics production of crude, petrol, diesel and gas for FY 2024-25 and FY 2025-26 (till January) in the country is as follows: Product Name Production in FY 2024-25 Production in FY 2025-26 (till January) Petrol (in MMT) 48.3 41.7 Diesel (in MMT) 118.2 100.5 Gas (in MMSCM) 36113 29288 Source: PPAC DEVELOPMENT OF GREENFIELD AIRPORTS 3438. SHRIMATI SANGEETA KUMARI SINGH DEO: Will the Minister of CIVIL AVIATION be pleased to state: (a) the status of Greenfield airports accorded 'in-principle' approval and 'site clearance' indicating those operationalised, under construction and proposed across the country, State-wise; (b) the present status of the Greenfield airport proposed at Puri, Odisha including land acquisition, environmental and statutory clearances, estimated project cost, funding pattern and timelines fixed for 12.03.2026 1042 commencement and completion of construction; (c) whether the Government has undertaken any assessment of passenger demand, tourism growth and regional connectivity benefits arising from the proposed Puri Greenfield airport, particularly in view of pilgrimage and coastal tourism in Odisha and if so, the details thereof; and (d) the quantum of capital expenditure incurred/proposed to be incurred for development of airport infrastructure in Odisha under the National Infrastructure Pipeline (NIP) and other schemes including Airports Authority of India (AAI) and PPP-based projects during the financial years 2019-20 to 2025-26? THE MINISTER OF STATE IN THE MINISTRY OF COOPERATION; AND MINISTER OF STATE IN THE MINISTRY OF CIVIL AVIATION (SHRI MURLIDHAR MOHOL): (a): Under the Greenfield Airports(GFA) Policy, "In-Principle'' approval has been accorded for setting up of 24 Greenfield Airports across the country, namely, Puri in Odisha, Parandur in Tamil Nadu, Kota in Rajahtan, Mopa in Goa, Navi Mumbai, Shirdi and Sindhudurg in Maharashtra, Kalaburagi, Vijayapura, Hassan and Shivamogga in Karnataka, Dabra (Gwalior) in Madhya Pradesh, Kushinagar and Noida (Jewar) in Uttar Pradesh, Dholera and Rajkot (Hirasar) in Gujarat, Karaikal in Puducherry, Dagadarthi, Bhogapuram and Oravakal (Kurnool) in Andhra Pradesh, Durgapur in West Bengal, Pakyong in Sikkim, Kannur in Kerala and Itanagar in Arunachal Pradesh. Out of these 13 Greenfield airports viz. Durgapur, Shirdi, Kannur, Pakyong, Kalaburagi, 12.03.2026 1043 Orvakal (Kurnool), Sindhudurg, Kushinagar, Itanagar, Mopa, Shivamogga, Rajkot (Hirasar) and Navi Mumbai have been operationalised. Besides, GoI has also granted 'Site Clearance' for construction of 7 Greenfield airports namely Alwar in Rajasthan, Singrauli in Madhya Pradesh, Mandi in Himachal Pradesh, Kottayam in Kerala, Doloo in Assam, Raichur in Karnataka and Sonpur in Bihar. (b) and(c): MoCA has granted 'In-Principle' approval to State Government of Odisha (GoO) for development of International Greenfield Airport at Puri on 06.05.2025. As per the GFA Policy, the responsibility for implementation of the Greenfield airport projects including land acquisition, R andR, funding, obtaining environment clearances etc. lies with the airport developer concerned or the State Government, as the case may be. The timeline for completion of the airport projects depends upon many factors such as land acquisition, availability of mandatory clearances, financial closure etc. Airports have emerged as a nucleus of economic activities and have multiplier effect on the economy of the State. Development of airports leads to increase in passenger movements, tourism development, employment generation and augmentation in circle rates of land valuation leading to enhanced collection of various taxes/stamp duties etc., in the respective State and in the overall development of the Country. International Civil Aviation Organisation (ICAO) study shows that the air connectivity has an economic multiplier of 3.25 and employment multiplier of 6.1. 12.03.2026 1044 (d): Airports Authority of India has incurred an expenditure of Rs. 479 crore for development of airports in Odisha during FY 2019-20 to FY 2025-26 (up to February 2026). BUDGETARY ALLOCATION TO EMRSs 3439. SHRI SUKANTA KUMAR PANIGRAHI: Will the Minister of TRIBAL AFFAIRS be pleased to state: (a) the total budget allocation and the actual expenditure incurred by the Ministry during the last three financial years, namely 2023-24, 2024-25 and 2025-26, scheme-wise, particularly under the Eklavya Model Residential Schools (EMRSs) and the details thereof; (b) the number of EMRSs sanctioned, made functional and under construction in the State of Odisha, including those located in Kandhamal Lok Sabha Constituency, along with funds released and utilised, district-wise; (c) the measurable outcomes achieved in terms of tribal student enrollment, transition to higher education, success in competitive examinations and participation in sports; and (d) whether the Government proposes any additional budgetary enhancement, strengthening of digital infrastructure and establishment of Centres of Excellence for tribal districts such as Kandhamal to further accelerate educational empowerment and if so, the details thereof? THE MINISTER OF STATE IN THE MINISTRY OF TRIBAL AFFAIRS (SHRI DURGA DAS UIKEY): 12.03.2026 1045 (a): The total budget allocation and the actual expenditure incurred during the last three financial years, namely 2023-24, 2024-25 and 2025-26, under some of the major schemes of the Ministry including the scheme of Eklavya Model Residential Schools (EMRSs) is given in the enclosed Statement. (b): In the State of Odisha, 111 EMRSs have been sanctioned, out of which 47 EMRSs are functional. The construction of 54 EMRSs buildings have been completed and 57 are at various stages of construction. In Kandhamal Parliamentary Constituency, 10 EMRSs have been sanctioned, out of which 02 are functional. The construction of 2 EMRSs building have been completed and 8 are at various stages of construction. Details of Funds released for the establishment and operation of EMRS for Odisha in last 3 years is as follows: Year Rs.in Lakh 2023-24 48,934.80 2024-25 64,965.47 2025-26 (Till 28.02.2026) 60,895.45 (c): Till 06.03.2026, 156564 students have been enrolled in EMRSs. Further, as reported by the States, during 2024–25, the pass percentage of EMRS students in Class X was 89% and in Class XII was 85%. 129 EMRSs achieved 100% results in Class X and 72 EMRSs achieved 100% results in Class XII. In the same year, 219 EMRS students qualified IIT-JEE (Main), 34 qualified IIT- JEE (Advanced), and 344 students qualified the NEET examination, indicating positive learning outcomes. 12.03.2026 1046 To nurture sports talent in EMRSs, National Level Sports Meet is organized by NESTS, apart from State level sports competition in the respective EMRS States. The 4th National EMRS Sports Meet 2025 was held from 11th to 15th November 2025 in Rourkela, Sundargarh and Rajgangpur, Odisha. Around 5,500 tribal students from 21 States and 1 UT participated in 22 individual and team sporting disciplines, with near-equal participation of girls and boys. Telangana emerged as the overall Champion, followed by Chhattisgarh and Madhya Pradesh. (d): The Ministry is not in receipt of any such proposal. STATEMENT Scheme-wise budget allocation and the actual expenditure under major scheme of Ministry of Tribal Affairs during 2023-24, 2024-25 and 2025-26: (Rs. in crore) Name of Scheme Budgetary Allocation Expenditure Budgetary Allocation Expenditure Budgetary Allocation Expenditure (as on 06.03.2026) 2023-24 2024-25 2025-26 Eklavya Model Residential School (EMRS) 2471.81 2447.06 4748.92 4716.31 4900.00 4252.92 SCA to TSP (Pradhan Mantri Adi Adarsh Gram Yojna-PMAAGY) 300.00 149.93 127.51 126.19 170.00 55.84 Grants under Article 275 (1) 1172.10 1172.10 1170.57 1170.57 1171.00 568.67 Aid to Voluntary Organizations working for the Scheduled Tribes 150.00 149.95 160.00 175.00 153.93 121.23 12.03.2026 1047 Pradhan Mantri Janjatiya Vikas Mission (PMJVM) 143.00 137.10 152.32 112.58 190.89 190.89 Support to Tribal Research Institutes (TRIs) 50.00 43.54 90.00 90.00 90.00 28.24 National Fellowship and Scholarship for Higher Education of ST students 230.00 230.00 240.00 240.00 220.00 199.83 Scholarship to the ST Students for Studies Abroad 7.00 7.00 6.00 6.00 8.00 7.40 Pre-Matric Scholarship 411.63 308.59 200.00 163.69 175.00 150.47 Post-Matric Scholarship 2371.01 2668.83 2462.68 2598.34 2864.34 2836.38 Tribal Festivals, Research Information and Mass Education [Tribal Research, Information, Education, Communication and Events (TRI-ECE)] 45.00 32.04 32.00 28.33 32.00 23.68 Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM-JANMAN) (MPC) 100.00 99.99 150.00 99.68 184.99 142.41 Dharti Aaba Janjatiya Gram Utakarsh Abhiyan (DAJGUA) 500.00 477.68 500.00 264.13 NHs in TAMIL NADU 3440. SHRI SACHITHANANTHAM R.: Will the Minister of ROAD TRANSPORT AND HIGHWAYS be pleased to state: 12.03.2026 1048 (a) the details of the total length in kilometres and estimated cost of National Highway (NH) works implemented by the Government in Tamil Nadu during the periods 2014–19, 2019–24 and 2024–26 till March, NH-wise; (b) the number of toll plazas opened on National Highways in Tamil Nadu during the above periods and the details of toll collection; (c) the number of toll plazas in Tamil Nadu that have been handed over to the National Highways Authority of India during the said period and the toll rates and collection made thereof; and (d) the present status of the proposed National Highway projects from Dindigul to Karaikudi, Dindigul to Sabarimala and Dindigul to Semmadaipatty? THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI): (a) to (c): The details of length of National Highway works implemented in the State of Tamil Nadu during the periods 2014–19, 2019–24 and 2024–26 (up to 28.02.2026) along with the estimated cost, number of toll plazas opened, toll collection and the number of toll plazas handed over to the National Highways Authority of India along with toll collection are given in the enclosed Statement-I. (d): The present status of the National Highway projects from Dindigul to Karaikudi, Dindigul to Sabarimala and Dindigul to Semmadaipatty are given in the enclosed Statement-II. 12.03.2026 1049 STATEMENT-I The details of length of National Highway works implemented in the State of Tamil Nadu: Year Length of NH Works implemented (km) Estimated Cost (₹ crore) No. of Toll Plazas Opened Toll Collection (₹ crore) No. of Toll Plazas Handed Over to NHAI Toll Rate (₹) Toll Collection of Toll Plazas Handed Over to NHAI (₹ crore) 2014-19 818.35 12196.78 10 2401.59 - The user-fee rates for each category of vehicle will be as per National Highways Fee (Determination of Rates and Collection) Rules, 2008 - 2019-24 1537.06 29222.26 20 937.69 5 143.19 2024-26 442.65 13717.40 18 421.19 5 103.55 Total 2798.06 55136.44 48 3760.47 10 246.74 STATEMENT-II The present status of the National Highway projects from Dindigul to Karaikudi, Dindigul to Sabarimala and Dindigul to Semmadaipatty: Sl. No. NH No Name of the Section Present Status 1 NH- 383 and NH- 338 Dindigul to Karaikudi section Overlay work is in progress in Dindigul (Km.0.00) to Natham (Km. 38.00) stretch of NH-383 to be completed by November 2026. The stretch from Natham (Km.38+00) to Thirupathur (Km. 84+00) of NH-383 is under maintenance. Widening to 4-lane of Thirupathur - Karaikudi section of NH-338 is in progress, and will be completed by July 2026. 2 NH- 183 Dindigul to Sabarimala section The DPR of Didigal to Plapally section is under preparation. The section from Plapally to Pumba (near Sabarimalai) is a State Highway and is maintained by the State Government. 3 NH- 83 Dindigul to Semmadaipatti section The existing Dindigul to Semmadaipatti Section of NH-83 has been widened to 4-lane and is under maintenance 12.03.2026 1050 IMPLEMENTATION OF TRIBAL WELFARE SCHEMES IN HINGOLI, MAHARASHTRA 3441. SHRI NAGESH BAPURAO AASHTIKAR PATIL: Will the Minister of TRIBAL AFFAIRS be pleased to state: (a) whether the Government is informed, that the benefits of tribal welfare schemes, including the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006, scholarship schemes, housing, health and education schemes are not reaching the general public effectively and in a timely manner in the tribal-dominated areas of Hingoli Lok Sabha Constituency in Maharashtra, covering districts such as Hingoli, Nanded and Yavatmal, if so, the details thereof; (b) whether it is true that tribal citizens in these areas are facing serious difficulties such as pending claims for Forest Rights pattas, delays in scholarship disbursement, lack of basic amenities in ashram schools and hostels, inadequate availability of health and nutrition services in remote tribal villages and difficulties in Direct Benefit Transfer (DBT) payments due to lack of digital and banking facilities; (c) if so, the concrete steps taken by the Union Government so far to address these issues and whether any specific action plan has been proposed for the Hingoli Lok Sabha Constituency; and (d) whether the Government is considering sending a special Central team or implementing a time-bound review mechanism to assess the ground- 12.03.2026 1051 level implementation of tribal development schemes in the aforesaid districts, if so, the details thereof? THE MINISTER OF STATE IN THE MINISTRY OF TRIBAL AFFAIRS (SHRI DURGA DAS UIKEY): (a) and (b): Regarding benefits of tribal welfare schemes, including the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006, scholarship schemes, housing, health and education schemes , to flagship mission namely, PMJANMAN and PM DAJGUA are being implemented by Tribal Development Department Government as per guidelines received by (MoTA) to provide basic facilities and services and near by socio economic development of tribal communities in Maharashtra State. The Hingoli Lok Sabha Constituency comprises the districts of Hingoli, Nanded, and Yavatmal. For these districts, the Kalamnuri Project Office functions for Hingoli district, the Kinwat Project Office functions for Nanded district, and the Pandharkawda and Pusad Project Offices function for Yavatmal district. These project offices function under the administrative control of the Office of the Additional Tribal Commissioner, Amravati. Out of these, Kinwat and Pandharkawda are TSP (Tribal Sub-Plan) projects, while Kalamnuri and Pusad are OTSP (Outside Tribal Sub-Plan) projects. The project-wise details are as follows. Project office Kalmnuri Dist. Hingoli Government resolution dated 04 April 2025 of the Rural Development 12.03.2026 1052 Department, Government of Maharashtra, Shabari Adivasi Gharkul Yojana Rural has been included in the Pradhan Mantri Awas Yojana Rural Phase 2. Therefore, the necessary funds for the objectives to be achieved during the period 2024-25 to 2028-29 will be made available to the State Management Cell Rural Housing by making provision in the budget of the concerned administrative department. Two districts, Parbhani and Hingoli, are covered under the Project Office Kalamanuri. Out of these, a total of 10503 Scheduled Tribe students from Hingoli district have been distributed Suvarn Mahotsavi Scholarships from Zilla Parishad Hingoli to the tribal students of class 1 to 10. Also, in the post-matric scholarship, a total of 1177 tribal students have been directly credited with the scholarship through PFMS in the Aadhaar-linked bank accounts of the government. However, there has been no delay in the distribution of scholarships to tribal students. There are 05 government tribal ashram schools and 11 government hostels for tribal boys and girls functioning under the jurisdiction of this office and there is no lack of any facilities in all these schools and hostels. There is no lack of digital and banking facilities. All 05 Government Ashram School have Taken Health check-up Camp in Every month and There is no complaints regarding the nutrition. Project office Kinwat Dist. Nanded Integrated Tribal Development Project Office, Kinwat, which is one of the 11 sensitive projects in Maharashtra, is working for the entire Nanded district. 12.03.2026 1053 This office receives funds for the implementation of comprehensive development schemes of tribals at the central, state level and district level. For the collective and individual development of the Tribals, Skill Development Programme, Central Budget, Special Central Assistance Scheme, Article 275 (1) of the Indian Constitution, PTG, Pardhi Package, Protection Programme for Primitive Tribes, Housing Scheme, Nucleus Budget Scheme, Thakkar Bappa Adivasi Basti Sudhar Yojana, etc. are being implemented. Under the District Annual Tribal Sub-Plan, Kinwat and Mahur talukas are under TSP and Himayatnagar, Hadgaon and Bhokar are included in Mada-Mini Mada area while other talukas are counted as OTSP areas. The ATSP area is only for individual benefit and funds are allocated to various implementing agencies for the development schemes of the tribals in addition to the schemes for personal benefit in other areas. These include Birsa Munda Krishi Kranti Yojana, Water Conservation, Power, Rural Development Agency, Zilla Parishad, Co-operation, Forests, Fisheries, Horticulture, Animal Husbandry, Industries, Irrigation, Public Works, Education, Sports, Technical Education, Women and Child Development (Dr. A.P.J. Abdul Kalam Amrit Aahar Yojana), Health, Water Supply, Urban Development. These departments take action to implement the schemes of the Tribal Development Department from the funds received by them. Funds are distributed to the project office to implement the schemes under the welfare schemes of the backward classes. Apart from this, a separate education cell has been set up from the year 12.03.2026 1054 2024-25 for the educational development of tribal students in project office. In Nanded District there are 16 Government Ashram School, 23 Aided Ashram Schools, 15 Government Hostels and One Eklavya Residential English Public School are running .Ashram School and Government Hostel Building Construction, Education of Tribal Students from Reputed English Schools, Government of India Scholarship, Golden Jubilee Pre-Secondary Scholarship, DBT, Pandit Deendayal Upadhyay Swayam Yojana for Non-Hostel Students, etc. are implemented benefits are given through DBT in Scholarship schemes. Overall, the schemes funded by the government for the overall development of the tribals are implemented through Project office. Project office Pusad Dist.Yavatmal . Project Officer, Integrated Tribal Development Project Pusad Dist. Yavatmal has a total of 7 talukas under its jurisdiction and two talukas, Umarkheed and Mahagaon, which are subordinate to this office in Hingoli Lok Sabha constituency. The government has submitted a proposal to construct a school building and a hostel for separate accommodation of boys and girls at the Government Ashram School Korta in Umarkheed taluka for the convenience of students under the Adarsh Ashram School Scheme. Also, the closed Government Ashram School at Borivan in Mahagaon will be converted into a new Government English Medium Ashram School in the year 2025-26. Currently, classes have been started for students at Vadgaon Shinde, Tal.Pusad and efforts are underway to start it at Mahagaon in the year 2026- 27. A hostel for boys and girls is functioning in Umarkheed taluka and higher 12.03.2026 1055 education facilities are being provided to the students of this area. Also, health facilities have been provided under the PMJANMAN scheme in the remote areas of Umarkheed and Mahagaon talukas. And nutritional food facilities are also provided. Also, digital and banking facilities are provided to the tribal citizens of both Umarkheed and Mahagaon talukas through Direct Benefit Transfer (DBT). For this, the following information from this office is submitted to the public for proper information. Project office Pandharkawada Dist.Yavatmal . Integrated Tribal Development Project office Pandharkawada District, Yavatmal has a total of 9 talukas under its jurisdiction. A total of 18 government ashram schools and 19 government hostels are functioning under this project office. In18 government ashram schools under the project office Pandharkawada and the number of students as on 30/09/2025 is 4078 and till 05/03/2026, out of 4078 enrolled students a total No. of 3614 students have been health checked by the RBSK team and the Health Department. Under the Adarsh Ashram School Scheme, construction of New school buildings is underway at government ashram schools Shibla, Jamb, Antargaon, Hiwari, Nanza, Kapra and Botoni. Proposals for the construction of hostels for separate accommodation for girls at Government Ashram Schools Hiwari, Jamb and Antargaon have been submitted for approval on priority basis. Regular Medical checkup of students is being done by PHCs, HDHs, DH 12.03.2026 1056 medical teams. It is set up for medical team which is especially set up for Ashram schools to visit every school quarterly. Health cards for every students are maintend in every Ashram school. During the medical checkup refractivedeffects are checked. Till now 72 students are provided with spectacles and 2227 under 14 girls students are vaccinated for Rebella. The construction of the school building at Eklavya Model Residential School Botoni has been completed and the construction of separate hostels for boys and girls, dining hall, and staff quarters are in progress. The construction will be completed by June 2026 and the school will start from the next academic year. The work to set up science centers at government ashram schools Hiwari and Jamb have been approved and construction is in progress. A total of 19 government hostels are functioning under this office, out of which 10 are for boys and 09 are for girls. 5 hostels are at the district level and the remaining 14 hostels are at the taluka level. There are 10 hostels in the government building and 09 hostels are in rented private buildings. Construction of 04 hostels is in progress. DBT of food is provided to the students at the district level hostels. Food is provided for the students of the taluka level.by at private food contractors. All the Govt. Ashram schools are provided with all basics amenities i.e water, sanitation, toilets and bathrooms as per the students counts for pure drinking water every school have RO units of 500 lph capacity. Till today 443 Community Forest Rights (CFR) and 845 Individual Forest 12.03.2026 1057 Rights (IFR) have been granted under the Forest Rights Act (FRA) 2006. Suvarna Mahotsavi Scholarships for the students admitted in year 2024-25 have been distributed to the students. And also all the schemes of individual (c) and (d): Flagship mission namely, PMJANMAN and PMDAJGUA are being implementing by Tribal Developmented Department Government of Maharashtra as per guidelines received to provide basic facilities and services and there by socio economic development of tribal communities in Maharashtra State. The details are mentioned as given below in physical progress of PM JANMAN and PM DAJGUA. The time line for PMJANMAN is from FY 2023-24 to FY 2026-27 and for PM DAJGUA is from FY 2024-25 to FY 2028-29 Details on different Interventions and their Progress for above mentioned mission at Maharashtra State is as given below : Physical Progress - PM JANMAN: Sr No Name of Ministry Intervention / Activity Mission Target (2023- 2026) Progress Details Remark Sanctions Physical Completion 1 M/o Rural Development Provision of pucca houses 54,405 houses 54,217 houses sanctioned 18,334 houses completed 36,071 In Progress. Connecting roads 27 Roads 50.14 Km Roads sanctioned - All 27 Road works are in progress. 2 M/o Health and Mobile 87 MMU 87 MMUs 87 MMUs 2,178 PVTG Villages 12.03.2026 1058 Family Welfare Medical Units (2862 PVTG Village) approved deployed Targeted. 57,918 Visits so far, 22,11,998 OPD patients attended 3 M/o Jal Shakti Piped Water Supply 2773 Villages 2773 villages sanctioned 1,567 villages Saturated (1,090 – HGJ Reported Villages, 860 – HGJ Certified Villages) 1206 – Villages work in progress. 4 M/o Women and Child Development Construction and running of Anganwadi Centre’s 178 AWCs 178 AWCs sanctioned 178 AWCs made operational 56 Construction Completed 122 AWC are In Progress 5 M/o Education Construction and running of hostels 25 Hostels 25 Hostels Work started in all 25 Hostels The construction work of 4 hostels is in progress. Out of these 1 works is at finishing stage. 2 works will be completed by March, 2026 and remaining 1 work will be completed by Oct, 2026. 6 M/o Power Energization of un- electrified HHs 13,413 HHs 13,413 HHs 13,413 HHs 100% Saturation Certification for 1,137 Villages. 7 M/o Communications Installation of mobile towers through Coverage of 193 habitations 164 Towers Planned 100 Habitations Saturation (77 Towers 93 Habitations work in progress (87 Towers On Air) 12.03.2026 1059 BSNL On Air) Installation of mobile towers through all Operators 462 430 334 Habitations Saturated 128 Habitations work in progress 8 M/o Tribal Affairs Multipurpose Centres 121 MPCs 121 MPCs 101 MPCs Completed, Remaining 20 MPC works are in progress. Setting up of VDVKs 40 VDVKs 40 VDVKs 40 VDVKs Started Businesses 3624. Beneficia ries. 63.047 Lakh Sale Physical Progress - PM DA-JGUA: S N Name of Ministry / Department Initiative / Scheme Progress / Current Status 1 Ministry of Rural Development (MoRD) Pucca houses under Pradhan Mantri Gramin Awas Yojana - (PMAY) Out of 3,35,979 sanctioned houses; 70,435 are completed, 2,65,544 are in progress. Roads connecting tribal settlements/villages/ Padas under Pradhan Mantri Gram Sadat Yojana – (PMGSY) It is planned to propose 116.75 km of roads for 21 villages under PMGSY - IV. 2 Ministry of Jal Shakti (MoJS) Tap water supply to Scheduled Tribe families under Jal Jeevan Mission Out of 4,952 targeted villages, 2,736 villages are Saturated. (1,736 – HGJ Reported Villages., 1092 – HGJ Certified Villages.) 2216 – Villages work in progress. Water supply through common pipe connection in villages inhabited by ST Communities under Jal Jeevan Mission 3 Ministry of Power (MoP) Electricity connection for Scheduled Tribe families Sanction of electricity connections to 6,961 Scheduled Tribe families. As of now, 5,228 ST families Saturated with Electricity Connections. Electricity connection for public institutions in the village, e.g. Gram Panchayat, School, etc. 12.03.2026 1060 4 Ministry of Women and Child Development (MoWCD) Construction of new Anganwadi under Poshan Abhiyan Proposals for 802 Anganwadi have been sent to the Central Government for approval. 5 Department of School Education and Literacy (DoSEL) Construction of hostels for Scheduled Tribe students under Samagra Shiksha Abhiyan 22 hostels Approved and Construction of all 22 Hostels are in progress. Work Order issued on 26/12/2025. 6 Ministry of AYUSH (MoAYUSH) Development of nutrition gardens in EMRS schools under National AYUSH Mission Total 6 Nutrition Gardens Approved at EMRS school premises. (Deori, Aheri, Satana, Igatpuri, Kambalgaon and Shahapur) 7 Dept. of Telecommunications (Do Telecom) Telecommunication connectivity in villages inhabited by ST Communities Out of the targeted 954 villages, Survey of 101 villages is in progress. 853 villages Saturated for mobile network connectivity. (654 villages have been planned to be connected through mobile network under DBN scheme) 8 Ministry of Skill Development and Entrepreneurship (MoSDE) Establishment of skill development centres in 30 districts inhabited by Scheduled Tribes “Jan Shikshan Sanstha” has nominated for implementation of said intervention in the State. 3 Skill Development Centres approved in Maharashtra. Implementing training of 50 – 120 days. (At Nandurbar, Gadchiroli and Nashik) Nashik: Targeted 900 – Enrolled - 577. Nandurbar: Targeted 900 – Enrolled - 801. Gadchiroli: Targeted 900 – Enrolled - 660. Skill-based training for Scheduled Tribe youth and beneficiaries associated with Van Dhan Vikas Kendra’s under Kaushal Bharat Abhiyan 9 Ministry of Tourism (MoTourism) “Tribal Home Stay” scheme for Scheduled Tribe beneficiaries under Swadesh Darshan scheme The proposals have been submitted to the office of Hon'ble Under Secretary, Ministry of Tourism, New Delhi, and the said proposals will be evaluated in theVillage level community 12.03.2026 1061 activities under Swadesh Darshan Yojana meeting of the Directorate of Missions and recommended for further approval. 10 Ministry of Tribal Affairs (MoTA) To implement the activities listed below in line with the expansion of the scope of the Special Central Assistance for Tribal Development (PMAAGY) Scheme. i. Establishment of Tribal Multipurpose Marketing Centres (TMMC) Updation approval for TMMC Design as per revised guidelines from MoTA is in progress. Accordingly, Administrative and Technical Approval will be revised for 4 projects (Yavatmal, Gondia, Gadchiroli and Nashik). Site identification for 2 projects (Nashik and Dhule) is in progress. ii. Strengthening of tribal ashram schools and hostels A total of 160 works have been approved. 159 works are at tender or foundation stage. 18 Additional Classrooms, 23 Toilet Blocks, 4 Major Repair Works (Total 45 Works) will be completed by 31st March 2026 1 work (Construction of a boys' hostel at Government Ashram School, Vishanpur, Taluka Chopra, District Jalgaon) is proposed from 35 Lakhs to 350 lakhs, for re- appropriation of fund. iii. Establishment of Centre of Competence (CoC) under Sickle Cell Anaemia Eradication Campaign and provision of 1 Centre of Competence (CoC) approved at AIIMS, Nagpur. All equipment has been procured and installed. 12.03.2026 1062 counselling and medication to patients. iv. Establishment and management of CFR and FRA centres FRA center approved in 26 districts. Status on claims for Forest Rights pattas, Total no of IFR Claims approved by disrict committees- 201968 Total no of CFR Claims approved by disrict committees- 8756 DEFICIENCIES ON NATIONAL HIGHWAYS 3442. SHRI JAGADISH CHANDRA BARMA BASUNIA: Will the Minister of ROAD TRANSPORT AND HIGHWAYS be pleased to state: (a) the total number of major deficiencies reported on National Highways since 2014, year-wise and State-wise; (b) the details of agencies or contractors penalised and blacklisted for deficiencies on National Highways since 2014, year-wise and State-wise; and (c) the details of long-term rectification completed on identified blackspots and the average time taken for such rectification process, State-wise? THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI): (a) and (b): All efforts are made to ensure that the National Highways (NHs) are constructed as per stipulated quality standards specified in the Indian 12.03.2026 1063 Roads Congress (IRC) specifications and codes. To ensure that highway construction adheres to stipulated quality standards, Consultants (Authority’s Engineer/ Independent Engineers- AE/IE) are appointed by the executing agencies for day-to-day supervision of works at site. Officials of executing agencies undertake inspections from time to time and ensure adherence of conformity of quality of the work done by the Concessionaire/ Contractors with stipulated requirements. Deficiencies observed, if any, are brought to the notice of the Concessionaires/ Contractors for taking up necessary corrective/ remedial actions as stipulated in technical schedules of the Contract/ Concession Agreement or within a reasonable period as decided by the executing agency / AE/ IE. As per information provided by the executing agencies of the NHs, since 2014 major deficiencies in NH stretches have been reported for 95 projects / stretches. State / Union Territory (UT) – wise details of major deficiencies of NH stretches observed since 2014 along with status of its rectification works and action taken against contractors, concessionaires, consultants etc. are given in the enclosed Statement-I. Actions against defaulting agencies have been taken up as per the provisions of the Contract/ Concession agreement in cases of deficiencies/ damages, such as termination of contract agreement, levying of penalties/ liquidated damages, debarment/ blacklisting, declaring as non-performers etc. Remedial work to repair or reconstruct damages during construction or 12.03.2026 1064 in the Defect Liability Period (DLP) is the responsibility of the Contractor/ Concessionaire at their own cost as per provisions of contract agreement except in those cases where the Contract Agreement has been terminated in which case the securities provided are forfeited. (c): Rectification of black spots is a continuous process. Out of total 16,542 black spots identified on NHs in the country, short-term rectification has been completed on 14,138 black spots and long-term rectification has been completed on 6,649 black spots. State/UT-wise details of long-term rectification of black spots on NHs across the country is given in the enclosed Statement-II. Long term rectification works includes improvement of road geometrics, junction improvements, spot widening of carriageway, construction of underpasses/overpasses, etc. which involve pre-construction activities such as land acquisition, forest clearance and utility shifting which takes significant time. STATEMENT-I State / Union Territory (UT) – wise details of major deficiencies of NH stretches observed since 2014 along with status of its rectification works and action taken against contractors, concessionaires, consultants etc.: State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken Arunachal Pradesh 1 Permanent solution to Slip Zones on Papu – Yupia – Hoj – Potin section of NH-713A and NH-13 at Km 31.000 (Hoj 2024 RE wall Collapsed Rectification of defective work initiated by the Contractor. Penalty of 12.03.2026 1065 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken Market), Km 38.300 (Yabi Village), Km 39.000 (Waterfall), Km 39.700 (Appa Crusher) and Km 40.300 (Crusher Point) in the state of Arunachal Pradesh for the year 2021-22 5% of contract value imposed on Contractor. Andhra Pradesh 2 Six-laning of Vijayawada bypass from Chinna Autupalli (Design Ch.0+000) to Gollapudi (Design Ch. 30+000) in Vijayawada – Gundugolanu Section of NH- 16 in the State of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode 2024 Defects in the construction of RE wall. Concessionaire commenced the rectification work based on recommendation /suggestion of RE wall Expert. Rs.10,99,235/- was recovered as damages from Concessionaire. 3 SIx laning of Anandapuram- Pendurthi-Anakapalli section of NH-16 in Andhra Pradesh 2021 2 girders (G1 andG2) on A1-A2 abutment of flyover were collapsed due to usage of multiple wooden blocks and improper supports for girders. Remedial measures were completed by the Concessionaire at its own cost. 4 Rehabilitation and up- gradation of NH-4 from Km. 171.590 to Km. 216.912 (Total Length of 47.687 km) from Nalagampalli village to Allkuppam (AP/KA Boarder) to four laning under NHDP Phase-IV in the state of Andhra Pradesh on EPC 2022 Defects in the construction of RE wall. Rs. 8,80,378/- Penalty imposed on Contractor. 12.03.2026 1066 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken mode 5 6 laning of existing 4-lane road from Kalaparru (Design Km 1050.680) to Chinna Avutupalli (Design Km 1076.480) of NH-5 including 6-lane Hanuman Junction Bypass from (Existing Km 1055.680 to Km 1060.800) (Design Ch.0.000 to Ch.6.720) (Total Design Length: 27.40 Km) in the State of Andhra Pradesh under NHDP Phase-V under Bharatmala Pariyojana on EPC Mode (Package-2) 2022 and 2025 Defects in the construction of RE wall. 2022: Contractor rectified defects at his own cost. 2025: Show-cause notices issued to Contractor as per Contractual provisions. 6 Six laning of existing 4-lane road from Gundugolanu (Design km 1023.280) to Kalaparru (Design km 1050.680) of NH-5 (New NH- 16) (Design length = 27.400 km) in the State of Andhra Pradesh under NHDP Phase- V under Bharatmala Pariyojana on EPC Mode (Package-1) 2022 Defects in the construction of RE wall. Contractor rectified defects at his own cost. Bihar 7 Four Laning of Simaria- Khagaria Section of NH-31 from Km. 206.050 to Km. 266.282 (Design Chainage) and (Existing Chainage Km. 209.945 to Km. 270.000 of NH-31) in the State of Bihar 2023 Issues reported by CRRI in quality of Concrete of superstructure in bridge at Km 264.946 Repair works taken up by Contractor as recommended in CRRI report 12.03.2026 1067 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken on EPC Mode 8 Varanasi - Mohania (GTRIP/5; Package - IV A): 4L of existing 2L section from km. 65 to km. 317 of NH-2 in UP and Bihar on NH-2 2023 Major deficiencies in structural elements Damages of INR 25 Cr imposed on Contractor 9 Kanhauli Ramnagar section of NH-131G 2022 Toppling of Girder of span P3- A2 Contractor’s and Supervision Consultants personnel suspended and removed from Project site. 10 Rajauli Bakhtiyarpur Pkg-III of NH-20 2022 Girder G-4 collapsed. Chief Project Manager and Engineer (Launching) of Contractor suspended. Team Leader cum Senior Bridge Engineer and Assistant Bridge Engineer of Authority's Engineer suspended. 11 Chhapra-Hajipur Section of NH-19 (New NH-31) 2023 Falling of concrete from the deck slab of Major Bridge at km 145+280 and Falling of Concrete from the Deck Slab of ROB at Ch 157+860. Project Manager and Bridge Engineer of the Concessionaire were suspended. Reconstruction completed by concessionaire at their own cost. 12.03.2026 1068 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken 12 Umagaon-Saharsa PKG-IV (Kosi Bridge and approach Road) 2024 A girder collapsed during construction. Chief Project Manager and Engineer (Launching) of Contractor suspended. Chhattisgarh 13 4-Laning of Simga-Sargaon Section of NH-200 (New NH- 130) from Km 48+580 to Km 91+026 2024 Cracks in Cement Concrete Panels Rectifications initiated at cost of EPC Contractor. 14 4-Laning of Sargaon-Bilaspur Section of NH-200 (New NH- 130) from Km 91+026 to Km 126+525 under EPC Mode 2022 Crack in Cement Concrete Panels and RE Wall bulged at Km. 91, 96, 101, 102 and 106. The EPC Contractor has commenced the rectification work at site. 15 Rehabilitation and Upgradation 2-lane with paved shoulders configuration of Bilaspur Urdawal section in km 241.553 to 312.60 = 71.0476 km (Masanialala to Rengapali) on NH 200 (New NH 49) (Package-III)(Borai river MNB at km 217.358) 2025 Damage in slab of Minor bridge The work is in Defect Liability Period and taken up by Contractor at his own cost. 16 Construction of 4/6 Laning of Raipur-Simga of NH-200 (New NH-30) (Package-I) from Km 0.000 to Km 48.580 (Total length 48.58 Km) section of Raipur-Bilaspur Road in the State of Chhattisgarh under NHDP-IV on EPC mode 2019 Cracks in PQC panels Rectifications works initiated at cost of Contractor. 12.03.2026 1069 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken Himachal Pradesh 17 Four Laning of Parwanoo- Solan Section NH-22 (New NH-05) from Km 67.000 to Km 106.139, under NHDP phase- III on EPC basis in the State of Himachal Pradesh. 2022 Collapse of road stretch between km. 3.130 to 3.170 on the two-lane portion of the project highway (approach road to Tunnel) of Parwanoo-Solan section of NH 05. Restoration work has been completed by EPC Contractor Haryana 18 Flyover and underpass at Hero Honda Chowk NH 48 2024 Some portion of deck slab fallen down with settlement of the bituminous surface (MCW-01) on RHS at Ch. 36+350 Arbitration notice issued to Contractor for recovery of damages. Process of Rectification and repair works initiated. 19 Dwarka Expressway Pkg-III (Delhi/HR Border to start of RoB Gurugram) 2021 Crushing of concrete in some segments. Penalty of Rs. 6.67 Cr on Contractor and Rs. 20 lakhs on Authority’s Engineer imposed. Contractor and Authority’s Engineer blacklisted for 3 months. Restoration/ repair works completed. 20 Six laning and Strengthening of NH-248A from existing km.2.740 (Rajiv Chowk) to km.11.682 in Gurugram under NHDP Phase-IV on Hybrid Annuity Mode in the state of Haryana. 2020 Span (P10–P11) of the under- construction flyover collapsed. Debarment of Team Leader and SQME of Independent Engineer. Penalty imposed of Rs. 3 Cr on Contractor. Expert Committee constituted 12.03.2026 1070 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken recommended dismantling of the collapsed span of the under-construction flyover and recasting of the segments and wings by Contractor at his own cost. 21 Delhi-Vadodara Expressway Pkg. 2 2024 Rutting Authority has imposed damages amounting to Rs.48,61,243/- on the contractor for delayed maintenance. Rectification of rutting has been taken up by Contractor and majority of the rutted portion has been rectified. 22 Delhi-Vadodara Expressway Pkg. 3 2024 Rutting Authority has imposed damages amounting to Rs. 42,95,049/- on the contractor for delayed maintenance. Rectification of rutting has been taken up by Contractor and majority of the rutted portion has been rectified. Gujarat 23 Sanchore-Santalpur Package- 4 2025 Ruts, cracks and surface deformation/ Distress was observed recently Penalty of ₹2.8 crore has been imposed on the Contractor along with a 12.03.2026 1071 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken after rains in June month 2025, severe rutting at some locations. recommendation for debarment up to one year or until successful rectification, whichever is later. Contractor has taken up repair/ restoration works. The Project Director of NHAI was suspended. 24 Widening of the Existing Jetpur-Gondal Section (Km 117.600 to Km 143.000) from two lane to four lane; making improvements in the existing four lane Gondal-Rajkot Section (km 143.000 to Km 175.000) and Widening of the existing Rajkot Bypass (Km 175.000 to Km 185.000) from two lane to four-lane on NH- 8B in Gujarat on BOT Basis 2020 PCC toe wall collapsed at km 180.590 Notice issued to Contractor for debarment for 2 years. Repair work executed by Contractor at his own cost. Jharkhand 25 4 Laning of kutchery chowk to bijupara Secion of NH 75 from km 0.0 to km 34.00 2022 Cracked PQC panels Performance Bank Guarantee of Rs 11.79 Crores encashed for non- rectification of defects 26 Four Laning of Mahulia- Baharagora-JH/WB Border Section of NH- 33 (from Km.277+ 500 to Km.333+500) and NH-06 (from Km.199+200 to Km.183+587) (Length of 71.61Km) in the State of 2024 Cracked PQC panels, Potholes Rs. 1.55 Cr penalty imposed on Contractor. 12.03.2026 1072 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken Jharkhand on EPC Pattern under NHDP Phase –III. Karnataka 27 Two/Four Laning of BRT Tiger Reserve Boundary to Bengalore Section of NH-948 2025 Km 337+670 to Km337+680 RE Block of length 10 mts collapsed Concessionaire has taken up repair/ restoration works as per recommendation of report submitted by IISC Bangalore. 28 Hospet-Bellary-Karnataka/AP Border from Km.280.080 to Km.375.450 2020 Cracks are developed in PQC for 8.30 km. Original Contract Terminated. New EPC Contractor is implementing the Balance works. 29 4-laning of Hubli – Hospet section 2022 Cracks on PQC Pavement and widening of longitudinal joints on pavement Contractor has initiated actions for rectification of damages. 30 Four laning of Goa-Karnataka Border to Kundapur section of NH-66 (formerly NH-17) from Km. 93.700 to Km. 283.300 in the State of Karnataka to be executed as BOT Project on DBFOT Pattern under NHDP- IV: 2024 Incident of collapse of three spans of Kaali Bridge. Inadequate slope stability works. Contractor debarred for 1 month on Aug 2024. Kerala 31 NH Connectivity to ICTT at Vallarpdam from Kalamassery to Vallarpadam NH 966A 2025 Distress in pile foundation was observed at Bridge no. 07 and 08 Ch. 7+960 and Ch. 9+067 (BHS) Penalty of Rs. 30.74 Cr was imposed on Contractor 32 Kodugallur to Edappally NH 66 2025 Damages in the pile foundation Ch. 398+400 and Concessionaire debarred for 1 year. Rectification works 12.03.2026 1073 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken 398+989 (RHS) Sub-standard work (Minor Bridge works, backfill material for RS Wall, Poor safety precautions, delayed grouting of girders, bulging of bearing) or poor quality (Defective RE Panels) taken up at cost of contractor. 33 Chengala-Neeleshwaram Section of NH-66 2022 and 2025 Collapse of VUP at Ch. 72+927 in 2022 during construction Soil nailing collapsed incident occurred at Ch. 58+035 to Ch. 58+100 (RHS) on 16.06.2025 with no casualties. Authority has suspended the Concessionaire and its promoter from future bidding for 01- month period. Debarment also issued to Concessionaire. Senior Bridge Engineer of AE removed from site. 34 Neeleshwaram- Thaliparambha Section of NH- 66 2025 Unprotected soil slip in the cut section with debris deposition on carriageways. Rectification work carried out and traffic restored with precautionary barricading in median portion. 35 Ch.174+150 (Thalssery-Mahe Bypass Section ) 2020 01 Bridge (4 girders collpased) Penatly of Rs. 1.00 Cr imposed on Contractor and Contractor debarred from partipating in Tender 12.03.2026 1074 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken for a period of 1 year. Penalty of Rs. 20.00 lakhs imposed on Authority's Engineer. 2. Team Leader, Bridge Engineer of AE was terminated from the project and debarred for 2 years. 3. Project Manager of Contractor terminated from project. 36 NHAI - Six laning from start of Valanchery bypass to Kappirikkad section of NH – 66 (old NH-17) from Design Ch. 298+500 (Ex. km 304.250) to Design Chainage 335+850 (Ex. km 349.260) in the state of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojana 2025 RE wall collapsed Debarment of Contractor and Independent Engineering firm from participating in ongoing/future bidding for 01 month period or completion of investigation by the expert Committee whichever is later. 37 Thuravoor-paravoor 2025 Collapse of 4 PSC Girders during constructions Penalty of Rs. 15.35 Lakhs imposed. Bridge Engineer and Team Leader of AE were Terminated. 38 Six Laning of Start of Kollam Bypass to Kadambattukonam from Km.486+000 to Km.517+800 of NH-47 (New NH-66) in the State of Kerala on Hybrid Annuity Mode under BharatmalaPariyojna 2025 Failure/Collapse of scaffolding of Minor Bridge (under construction) at Km.Ch. 497+370(RHS) Penalty of Rs. 9.55 lakhs imposed on Concessionaire 39 2025 Failure of RE Wall Rectification initiated 12.03.2026 1075 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken Ch. 504+400 to 504+500(LHS) by Concessionaire. 40 6L Elevated Corridor along with development of existing 4 lane road at ground level from Aroor to Thuravoor Thekku section of NH 66 2025 Toppling of two PSC girders at span P- 202-P-203 Failure on part of AE to review efficacy of material being used in launching and not ensuring application of approved launching scheme. Contractor and AE debarred from future bidding for 1 month. 41 Azhiyur-Vengalam 2024 Soil nailing collapse At Km:191(LHS) and Km:193(RHS Rectification initiated by Concessionaire. 42 Ramanattukara-Valanchery 2025 Defects in RE wall Rectification works initiated by Contractor at his own cost. Madhya Pradesh 43 4-laning of Bhopal-Bioara section of NH-46 2025 Premature failure of pavement. Penalty of Rs. 119 Cr imposed on Contractor. Rectification work initiated at the cost of Contractor. Maharashtra 44 Construction of 4-laning Flyover of NH-6 integrated with ROB's and River Bridge including approach ramps service road footpath over RCC utility duct for Octroi Naka to Itwari and Inner Ring Road from Manewada to Kalamna and Rani Prajapati Square to Vaishnav Devi 2021 Sliding of P7 end of the single girder due to inadequate bracing after launching leading to collapse of 1 end of the girder. Debarment of the Project Manager of Contractor for 3 months and Debarment of the Contractor for 9 months. The damaged Girder was replaced by 12.03.2026 1076 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken Square including ROB LC No. 71 and72 in Nagpur of NH-6 Contractor at his own cost. Project Director, NHAI, transferred immediately. 45 Bal. Works of Fagne (Km. 510.000) to Maharashtra/Gujarat Border (Km. 650.794) on NH-06 (New NH-53) 2022 Damages observed in Slab of Major Bridge at Ch.547.344 Structure was Audited by VNIT Nagpur. As per the recommendation of VNIT, Nagpur, Contractor has taken up reconstruction of slab. 46 Balance work for 4-laning of Panvel to Indapur section from km.0.0 to km.42.3 of NH- 66 - EPC 2024 Panel cracking, poor riding quality, bumps, poor diversions etc. Contractor has taken up rectification works. 47 Bodhwad- Muktainagar - Barhanpur road Section - II Km 44/760 Km.78/145. 2020 Cracked panels Contractor has initiated actions for rectification of damages. DLP period is extended by Six months. 48 Section -II Kolde to Khetia Road km.50+200 to 98+800 2021 Cracked panels Contractor has initiated actions for rectification of damages. 49 Mehkar-Ajispur Road 2024 Cracked panels The Performance BG of Contractor is forfeited. Process initiated for rectification of damages. 12.03.2026 1077 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken 50 Bhokar-Sarsam 2024 Cracked panels Contractor has initiated actions for rectification of damages. 51 Sillod-Fardapur 2024 Cracked panels Contractor has initiated actions for rectification of damages. 52 Parbhani to Gangakhed 2021 Cracked panels Contractor has executed the panel replacement / rectification works. 53 Amdi - Saoner 2022 Cracked panels Contractor has initiated actions for rectification of damages. 54 Rehabilitation and upgradation and NH-66 (Erstwhile NH-17) form km 241+300 to 281+300 (Arawali to Kante Section) to four lane with paved shoulder in the state of Maharashtra under NHDP-IV on Hybrid Annuity Mode. 2025 Depression and cracks in PQC Contractor has initiated actions for rectification of damages. 55 Rehabilitation and Upgradation of NH-66 (Old NH17) from Km 281+300 to Km 332+200 (Kante to Waked section) to four lanes in the state of Maharashtra under NHDP-IV on Hybrid Annuity Mode. 2024 PQC cracks and settlement. Contractor has replaced cracked panels. 12.03.2026 1078 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken 56 Rehabilitation and up- gradation of NH-66 (Old NH- 17) form km 332/200 to km 367/200 (Watul to Talgaon Section) to four lanes in the State of Maharashtra under NHDP-IV on EPC Mode. 2024 Full depth Cracks in PQC Contractor has initiated actions for rectification of damages. 57 Rehabilitatyion and up gradation for Talere Gaganbawada Kolhapur Road (NH-166G) stretches start from Ch. 6/00 Km. to Ch. 11/00 Km. and Ch. 19/300 Km. (Start of Karul Ghat) to 35/300 Km. (End of Gaganbawada) of NH-166G to 2 lane paved shoulder/2 lane configuration lane, length 21.00 Km. in the state of Mahrashtra on EPC Mode. 2025 Cracks in PQC Contractor has initiated actions for rectification of damages. 58 Rehabilitation and Up- gradation to Two lanes with paved shoulder from Karad to Tasgaon NH 266 from Km. 0/00 to 58/830 in the State of Maharashtra on EPC mode 2024 Cracked panels Rectification of damages taken up at risk and cost of Contractor. 59 Upgradation to two lane with paved shoulder from Salaikhurd to Tiroda Km 120/100 to 163/200 (Design Km 44/00 to 87/00) of NH 753 on EPC Mode in the state of Maharashtra 2024 Post construction defects are observed in the Rigid Pavement i.e. formation of Longitudinal and Lateral cracks, IIT Bombay has been appointed for Technical Investigation of defects and suggestion of remedial measures. 12.03.2026 1079 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken Opening of Central Joints, Settlement of Panels etc. 60 Four laning of Pune Solapur Section from km. 150.050 to km.251.325 of Old NH 9 (Pkg- II) 2020 Rutting Penalty of Rs. 41.32 Cr imposed on Contractor. Rajasthan 61 Delhi Vadodara Expressway NE-4 Pkg.06 2024 Rutting, Raincuts, potholes and settlement Penalty imposed on each contractor amounting to Rs. 50 Lakhs for non- rectification of defects in the stipulated time frame as per provision of contract agreement. 62 Delhi Vadodara Expressway NE-4 Pkg.07 2024 63 Delhi Vadodara Expressway NE-4 Pkg.08 2024 64 Delhi Vadodara Expressway NE-4 Pkg.09 2024 65 Construction of 6-lane access- controlled Greenfield highway from km 28+70 to Km. 53+0 of Sangariya (near Chautala)- Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan under Bharatmala 2024 Deficiencies in riding quality and settlement at some locations observed (i) Damage of Rs. 50.00 Lakhs imposed upon the Contractor. (ii) Two key personnel of Authority Engineer team were terminated due to poor supervision. 12.03.2026 1080 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken Pariyojana -Phase-I (AJ/SR- Package-2) 66 Construction of 6-lane access controlled Greenfield highway from km 53+000 to Km. 88+000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar- Jamnagar Economic Corridor in the State of Rajasthan under Bharatmala Pariyojana- Phase-I (AJ/SR-Package-3) 2024 Failure of the nose structure while launching of 83 mtr single span truss bridge Penalty of Rs. 1.00 Cr. imposed and warning for debarment action for any future instances upon the Contractor was issued. Debarment of fabrication team and Designer team issued for the period of 02 years in NHAI works. Penalty of Rs. 20 Lakhs and warning for debarment action for any future instances upon the Authority Engineer. Debarment of Senior bridge Engineer deployed by the Authority Engineer issued for a period of 2 years in NHAI works. 67 Delhi-Vadodara Expressway Pkg. 4 2024 Rutting and settlement of approach Damages amounting to Rs. 1.06 Cr. imposed for delayed maintenance. Also, IIT Kharagpur has been engaged for detailed study for permanent 12.03.2026 1081 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken rectification of defects. 68 Delhi-Vadodara Expressway Pkg. 5 2024 Rutting, settlement of approach and bulging of RE wall Damages amounting to Rs. 88.32 lakhs imposed for delayed maintenance. Bulging of RE wall has been rectified as per suggestions of CRRI. Majority of the rutting has been rectified. Further, in addition to above, IIT Kharagpur has been engaged for detailed study for permanent rectification of defects. 69 Delhi-Vadodara Greenfield Alignment (NH-148N) (Pkg- 16) (Ch. 427.300 to Ch.452.420) [Major bridge over Takli river near Nayagaon Jageer village to Rajasthan/MP Border] 2024 Stretch is operational w.e.f. 30.11.2023 and at some locations the settlements observed in approaches of structure EPC Contractor has rectified damages. R 70 Construction of proposed 2- lane ROB and its approaches in lieu of existing level crossing no. C-64 at km. 172.990 on Jodhpur–Ajmer Road on NH-65 in District Nagaur Rajasthan 2024 Post-completion, structural defects have been observed in the deck slab of the ROB due to honeycombing caused by poor workmanship. Contract has been terminated. Debarment of contractor taken up. Bid for rectification works invited. 12.03.2026 1082 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken Telangana 71 Four Laning of NH-161 from Mangloor (Design Km 86.788 /existing Km 91.350 to Telangana/Maharashtra Border (Design Km 135.751/ Existing Km 140.873) in the state of Telangana under Bharatmala Pariyojana on Hybrid Annuity Mode (Package-III) 2022 At some locations Rutting and Bleeding was observed in the Project Highway during O andM Period Penalty of Rs.134.784 Cr. imposed towards Breach of maintenance obligations. Tamil Nadu 72 4-laning of Madurai - Chettikulam section from Km 0.000 to Km 7.300. 2021 3 Girders (G1, G2 and G3) between pier P4 and P5 at Km 2+850 of down ramp collapsed during fixing of the Bearing during construction. Contractor has replaced the girders at the said locations at his own cost. 73 4-laning of Sethiyathope - Cholpauram section from Km 65.960 to Km 116.440 2022 and 2025 In 2022: A Segmental Girder on P16-P17 of RHS Carriageway fell down due to failure of hydraulic jacks at Km 107+400 Anaikarai Major Bridge across Kollidam river. In 2025: The RE wall blocks portion of the A2 (Thanjavur) side approach (LHS side) have been In 2022: A penalty amounting to Rs. 7.305 crore (being 0.5% of the BPC) had been imposed and recovered from the Concessionaire. The collapsed span has been reconstructed by the Concessionaire with their own cost. In 2025: The rectification work completed by the 12.03.2026 1083 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken disconnected from the geo grid and fallen down. Concessionaire at their own cost. 74 4-laning of Thanjavur - Trichy section from Km 80.000 to Km 136.490 2023 The RE wall panel portion of the A1 (Thanjavur) side approach (LHS side) have been disconnected from the geo grid and fallen down. Based on report of Expert Committee, restoration work using soil nailing completed by Contractor. Uttar Pradesh 75 Construction of 4 lane green field highway from km 35.00 to 49.155 of NH-731A with paved shoulder on Hybrid Annuity Mode in the State of Uttar Pradesh. (Job No. CE- RO-LKO/NH(O)/NH- 731A/2021-22/627 dt 05-01- 2022) 2025 Cracks observed over DBM due to percolation of rain water in some stretches. The project is under construction, the repair and rectification work taken up by the concessionaire at its own cost. 76 Lucknow Ring Road Pkg-3A 2024 Cracks in PQC Panel in length of 2.886 Km. Contractor has initiated process for rectification of damages. 77 Rehabilitation and Up- gradation from km. 285.000 to 326.000 of NH-76 (Kalupur - Lalta Road) to two lane with paved shoulder on EPC mode in the state of Uttar Pradesh 2020 Cracks in rigid pavement. Defect Liability Period has been extended till the rectification of defects observed during DLP. Rectification work based on IQA report completed. 78 Rehabilitation and Up- gradation from km. 178.000 to 2020 Cracks in rigid pavement. Defect Liability Period has been extended till 12.03.2026 1084 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken 215.000 of NH-76 (Kabrai – Banda Road) to two lanes with paved shoulder on EPC mode in the state of Uttar Pradesh the rectification of defects observed during DLP. Rectification work based on IQA report completed. Uttar Pradesh and Haryana 79 Eastern Peripheral Expressway (packages- I, II, III, VI) 2021, 2022 Poor quality of construction. Contractors debarred. Repair works under taken by ToT Concessionaire. Uttar Pradesh and Uttarakhand 80 4L of Haridwar-Nagina section of NH-74 2023 PQC panel cracks Contractor has initiated process for rectification of damages. Uttarakhand 81 Construction, Operation and Maintenance of 2-Lane Bi- Directional Silkyara Bend Barkot Tunnel with escape passage including approaches on Dharasu–Yamunotri section between Ch. 25.400 Km and Ch. 51.000 Km falling along NH-134 (OLD NH-94) in the state of Uttarakhand 2023 Collapse at cavity in under construction Silkyara Tunnel. Rectification measures taken up by the EPC contractors at its own cost. Actions as per the Investigation Committee Report initiated. West Bengal 82 Construction of 4-Laning of Puruliya Bypass Section from Km. 84.030 to Km. 94.345 of NH-32 (length 10.315 Km) in the State of West Bengal on EPC Mode 2025 Cracks have developed in the newly constructed PQC. i) Rectification works initiated by Contractor. Amount of Rs. 20.00 Lakh withheld from Contractor's bill. ii) Key personal of AE has been debarred for a period of one year. 12.03.2026 1085 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken 83 Four laning with paved shoulders of NH-6 from Chichra to Kharagpur Km 185.150 to Km 134.400 including rehabilitation of existing four lane from Km 134.400 to Km 129.600 in the state of West Bengal 2023 Cracks in PQC panels Rectification works completed at cost of EPC Contractor. 84 Construction of new 4-lane bridge over river Ganga on NH-12 (old NH-34) 2020 One span collapsed due to toppling of launching girder. Contractor debarred for 3 years. Rectification work taken up. 85 Four laning of Berhampore – Farakka Section of NH-12 (old NH-34) 2024 Failure of membrane pad of Pot – PTFE bearing on P2 of Ahiron Bridge (Ch. 257+440 LHS MJB- truss). Also, a level difference up to 90mm had been observed between expansion joint of deck-I and deck-II along with missing of some anchoring bolts of connecting gusset plates. Rs. 26.19 lacs penalty imposed on Concessionaire. Rectification work completed. 86 Four laning of Farakka – Raiganj Section of NH-12 (old NH-34) 2024 Crack at the bottom of the deck slab at km 325+060 of the Mahananda Bridge (LHS). The crack was located under the fast lane between Rectification work completed. 12.03.2026 1086 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken span P1 and P2 (PSC Girder). 87 2024 At RHS Pier 4 of MJB at 325+223, piles are exposed and heavy reinforcement were exposed. Exposed reinforcement were corroded. Rectification work initiated by Concessionaire. 88 Four laning of Berhampore – Farakka Section of NH-12 (old NH-34) 2025 Rutting, Potholes, Cracks Rectification initiated by Concessionaire at his own cost. Odisha 89 Chandikhole-Bhadrak Section of NH-16 2023 1. Faulty Design in Bridge at km. 96+326: 2. Bridge at km. 79+614: The span A1-P1 had dislodged from the pier P2 due to breaking of the cantilever Portion of the pier cap and had fallen on the ground. Appearance of wide cracks (up to 3-4mm) in the pier cap on grid “P2”. 1. For Faulty Design at Km 96+326, penalty imposed of Rs.30 Lakhs on the Concessionaire and Rs.5 Lakhs on the Independent Engineer. Team Leader of IE and Key Personnel of Concessionaire suspended. 2. For Bridge at km. 79+614: Penalty of Rs.5 crore imposed on the Contractor and Penalty of Rs.20 lakh 12.03.2026 1087 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken Damages of deck slab and girders of the dislodged span. imposed on the Supervision Consultant. Debarment of DPR Consultant for 1 year. The cost of entire remedial measures / reconstruction recovered from the Concessionaire. 90 Completion of Balance Work Panikoili – Rimuli section of NH-215 (New NH-20) from Km.0.000 to Km.163.000 (Design Chainage Km0.000 to 166.173) in the state of Odisha in single percentage item rate Contract 2022 Collapse of pier cap (P8) and girders (P8 – P9 Span) Balance work of Belabahali Major Bridge LHS at Km.35.341 which was under construction collapsed during launching of girders. Restoration work executed by Contractor at his own Cost based on the recommendation of Expert Committee constituted. Assam 91 Construction of 6-lane Standalone Flyovers at Bongaigaon, Chapaguri, Pathsala, Simlaguri Chowk and Baihata Junctions on stretches of NH-31 and NH- 31C [new NH-27 (EW)] in the State of Assam under Bharatmala Pariyojana on EPC basis 2024 Falling of one PSC Girder at Baihata Flyover (Span P1- P2), resulting in the death of one person. Penalty imposed on Contractor. Contractor debarred for 4 months. 12.03.2026 1088 State S. No. Name of the Project Year of incident Details of Major damages / defects Action Taken 92 Two Lane with paved shoulders configuration in Jowai-Meghalaya Assam Border Section of NH - 44 from Km 69.200 to Km 173.200 (design Ch 171.455 ) in the state of Meghalaya 2025 Slippage of Bituminous concrete for a length of approximate 10-15 mtrs Penalty of Rs. 20,00,000/- imposed on Contractor and rectification work carried out by Contractor at his own cost. Delhi 93 Construction of Dwarka Expressway Package-1, from Shiv Murti Intersection at Km 20 of NH-8 till road under Bridge (RUB) near Dwarka Sector-21(From Km -0.600 to 5.300) in the state of Delhi on EPC mode 2023 P8-P9 of flyover part of Shiv Murti interchange on Dwarka Expressway toppled. Remedial measures completed by Contractor. Andaman and Nicobar Islands 94 Rehabilitation of km 181.00 to Km 206.00 section in Andaman Trunk Road of NH-4 to Intermediate Lane with hard shoulder in the union Territory of Andaman and Nicobar islands (Total length 25.00 km) on EPC Mode” (Package- VII) 2024 Distress, sinking of pavement at various locations. Rectification works completed. 95 Construction of 4 Nos. of Minor Bridges at Km 21.717, Km 23.150, Km 88.300, Km 92.100 of NH- 223 (New NH- 4) connecting South Andaman and Baratang Island in the Union Territory of Andaman and Nicobar Islands on EPC mode. 2024 Punching in Deck Slab (LHS) of the minor bridge across BD Nallah at Km 88+300 and other quality issues including bad workmanship. The EPC contractor has carried out the necessary rectifications at their own expense including replacement of slab as recommended by CRRI-CSIR report. 12.03.2026 1089 STATEMENT-II State/UT-wise details of long-term rectification of black spots on NHs across the country : States/UTs Blackspots Long-term Rectification Completed Gujarat 386 168 Odisha 597 378 Tamil Nadu 1661 613 Maharashtra 550 267 West Bengal 1339 803 Delhi 335 181 Jharkhand 279 120 Karnataka 1278 701 Kerala 701 123 Goa 50 26 Andhra Pradesh 1060 343 Telangana 1535 516 Bihar 306 64 Assam 285 77 Mizoram 1 1 Meghalaya 56 23 Nagaland 71 64 Sikkim 16 16 Manipur 19 14 Tripura 29 12 Arunachal Pradesh 9 0 Uttarakhand 110 80 Punjab 1407 463 Haryana 124 58 Chandigarh 7 0 Madhya Pradesh 596 225 Uttar Pradesh 2210 540 UT of J andK and UT of Ladakh 224 62 Himachal Pradesh 232 199 12.03.2026 1090 States/UTs Blackspots Long-term Rectification Completed Chhattisgarh 338 245 Rajasthan 727 265 Andaman and Nicobar 4 2 Total 16542 6649 मÅय ÿदेश म¤ अमृत योजना कì िÖथित 3443.®ी बंटी िववेक साहóः ³या आवासन और शहरी कायª मंýी यह बताने कì कृपा कर¤गे िकः (क) जनवरी, 2025 से अब तक मÅय ÿदेश म¤ उन शहरŌ/शहरी Öथानीय िनकायŌ का Êयौरा ³या है जहां अमृत 2.0 के अंतगªत, िवशेष łप से िछंदवाड़ा लोक सभा िनवाªचन ±ेý म¤ जलापूितª और अवजल पåरयोजनाएं शुł कì गई ह§; (ख) उĉ िमशन के अंतगªत नल कने³शनŌ का िवÖतार करने, गैर-राजÖव जल म¤ कटौती और सेवा कì गुणव°ा म¤ ÿगित को मापने के िलए कौन-कौन से ÿमुख मानदंड अपनाए जा रहे ह§; (ग) सरकार Ĭारा जल के पुनः उपयोग करने और सतत शहरी जल ÿबंधन को बढ़ावा देने के िलए ³या ठोस कदम उठाए गए ह§; (घ) ³या मÅय ÿदेश या िछंदवाड़ा म¤ िकसी पåरयोजना को तकनीकì अथवा िव°ीय कारणŌ से िवलंब का सामना करना पड़ा है; और (ङ) यिद हां, तो तÂसंबंधी Êयौरा ³या है और दीघªकािलक ÿचालन और रख-रखाव सुिनिIJत करने के िलए ³या उपाय िकए जा रहे ह§? आवासन और शहरी कायª मंýालय म¤ राºय मंýी (®ी तोखन साहó): (क) से (ग): जल एवं Öव¸छता राºय का िवषय है। भारत सरकार योजनाबĦ हÖत±ेपŌ/परामिशªकाओं के माÅयम से राºयŌ के ÿयासŌ म¤ सहयोग करती है। सरकार अटल नवीकरण और शहरी पåरवतªन िमशन (अमृत) और अमृत 2.0 जैसी िविभÆन योजनाओं/िमशनŌ के 12.03.2026 1091 माÅयम से राºयŌ को िव°ीय एवं तकनीकì सहायता ÿदान करती है। अमृत/अमृत 2.0 के तहत, राºयŌ/संघ राºय ±ेýŌ को पåरयोजनाओं के चयन, उनका मूÐयांकन, ÿाथिमकता िनधाªरण और उÆह¤ कायाªिÆवत करने का अिधकार िदया गया है। अमृत 2.0 के तहत, मÅय ÿदेश कì राºय जल कायª योजनाओं (एसडÊÐयूएपी) को अनुमोिदत िकया गया है, िजनम¤ 12,951.10 करोड़ Łपये कì 1153 पåरयोजनाएं शािमल ह§। इनम¤ 6877.53 करोड़ Łपये कì 297 जल आपूितª पåरयोजनाएं और 5432.04 करोड़ Łपये कì 36 सीवरेज/सेÈटेज ÿबंधन पåरयोजनाएं शािमल ह§। राºय Ĭारा अमृत 2.0 पोटªल पर दी गई जानकारी के अनुसार, जनवरी 2025 से अब तक 79 शहरŌ/शहरी Öथानीय िनकायŌ (यूएलबी) म¤ 79 जल आपूितª पåरयोजनाओं और 18 शहरŌ/ शहरी Öथानीय िनकायŌ म¤ 18 सीवरेज/सेÈटेज ÿबंधन पåरयोजनाओं के ठेके िदये जा चुके ह§। िछंदवाड़ा लोक सभा ±ेý म¤ अमृत 2.0 के तहत पåरयोजनाओं कì िÖथित संलμन िववरण म¤ दी गई है। इस ÿगित का आकलन घरŌ म¤ जल आपूितª और सीवरेज कने³शन कì उपलÊधता के आधार पर िकया जाता है। अमृत/अमृत 2.0 योजना के तहत और राºयŌ के साथ कनवज¦स करते हòए, शहरी ±ेýŌ म¤ अब तक 246 लाख जल नल कने³शन उपलÊध कराए जा चुके ह§। अमृत/अमृत 2.0 योजना के तहत और अमृत शहरŌ के साथ कनवज¦स करते हòए 182 लाख सीवर कने³शन (मल कìचड़ और सेÈटेज ÿबंधन (एफएसएसएम) के तहत कवर िकए गए घरŌ सिहत) उपलÊध कराए गए ह§। 93,457.51 िकलोमीटर का जल पाइपलाइन नेटवकª िबछाया/बदला गया है और 26,995.61 िकलोमीटर का सीवर नेटवकª िबछाया/बदला गया है। राºयŌ Ĭारा उīोगŌ, बागवानी, कृिष आिद म¤ ÿितिदन लगभग 6,535 िमिलयन लीटर (एमएलडी) शोिधत जल का पुन: उपयोग िकया जाता है। मÅय ÿदेश के शहरी ±ेýŌ म¤ अब तक 16.54 लाख जल नल कने³शन और 5.73 लाख सीवर कने³शन (एफएसएसएम के अंतगªत आने वाले घरŌ सिहत) ÿदान िकए गए ह§। अमृत 2.0 के तहत, शहरŌ ने शहरी जल संतुलन योजनाएँ (सीडÊÐयूबीपी) तैयार कì ह§, िजनम¤ जल आपूितª ÿणािलयŌ का यथािÖथित मूÐयांकन शािमल है, जो सतत शहरी जल ÿबंधन म¤ 12.03.2026 1092 शहरŌ/शहरी Öथानीय िनकायŌ को सहायता ÿदान करता है। जलाशयŌ का पुनŁĦार अमृत 2.0 के ÿमुख घटकŌ म¤ से एक है। अब तक, इस िमशन के तहत 6,083.32 करोड़ Ł. कì 2,991 जलाशय पुनŁĦार पåरयोजनाओं को अनुमोिदत िकया गया है, िजनम¤ मÅय ÿदेश म¤ 511.75 करोड़ Ł. कì 430 जलाशय पुनŁĦार पåरयोजनाएं शािमल ह§। इसके अितåरĉ, भूजल पुनभªरण को बढ़ावा देने, िविभÆन ÿकार कì पुनभªरण संरचनाओं को ÿदिशªत करने और शहर के अिधकाåरयŌ और नागåरकŌ को जलभृत ÿबंधन के महÂव के बारे म¤ जागłक करने के िलए, अमृत 2.0 के तहत शैलो ए³वीफर मैनेजम¤ट (एसएएम) पहल को भारत के 9 अलग-अलग शहरŌ म¤ एक ÿायोिगक पåरयोजना के łप म¤ शुł िकया गया था। एसएएम 2.0 के तहत इसे 75 अितåरĉ शहरŌ तक िवÖताåरत िकया गया है। गैर-राजÖव जल संबंधी समÖयाओं के समाधान के िलए, राºयŌ ने अमृत 2.0 के अंतगªत जल से नल (डीएफटी) पåरयोजनाएं और Öमाटª िनगरानी ÿणािलयां जैसे पयªवे±ी िनयंýण और डेटा अिधúहण ÿणाली (एससीएडीए), मीटर, ÿेशर वाÐव आिद को अपनाया है, तािक रखरखाव ÿणािलयŌ, िडिजटल िनगरानी, ऊजाª द±ता आिद को सुŀढ़ िकया जा सके। राºयŌ को ÿÂयेक अमृत शहर के भीतर एक िजला मीटर ±ेý (डीएमए) या वाडª म¤ कम से कम एक डीएफटी पåरयोजना कायाªिÆवत करने के िलए ÿोÂसािहत िकया गया है। अमृत 2.0 के तहत 1,153 िजला मीटर ±ेýŌ (डीएमए) म¤ फैली 408 पåरयोजनाओं को अनुमोिदत िकया गया है, िजनसे 16.72 लाख घरŌ को लाभ िमलेगा। अमृत के अंतगªत 258 जल आपूितª योजनाओं म¤ एससीएडीए ÿणाली है और अमृत 2.0 के अंतगªत 1,422 जल आपूितª पåरयोजनाओं म¤ एससीएडीए ÿणाली का ÿावधान है। िमशन ने अंितम घर तक कनेि³टिवटी को बेहतर बनाने के िलए ÿित कने³शन 3000 Ł. का ÿावधान िकया है। ÿÂयेक शहर के िलए शहर जल संतुलन योजना के िवकास के माÅयम से जल कì सकुª लर इकोनॉमी को बढ़ावा देने के िलए अमृत 2.0 कì पåरकÐपना कì गई है, िजसम¤ शोिधत सीवेज के पुनचªøण/पुन: उपयोग, जलाशयŌ के पुनŁĦार और जल संर±ण आिद पर Åयान क¤िþत िकया गया है। 500 अमृत शहरŌ के िलए अमृत 2.0 के सीवरेज घटक के तहत, एंड-टू-एंड रीयूज़ योजना के 12.03.2026 1093 साथ तृतीयक शोधन (अिधमानतः सावªजिनक-िनजी भागीदारी मोड म¤); एंड-टू-एंड शोधन और रीयूज़ सिहत सीवरेज ÿणािलयŌ का ÿावधान/संवधªन और पुनवाªस; पुनचªøण के िलए ÿयुĉ जल का दोहन; पुनचªिøत ÿयुĉ जल के थोक उपयोगकताªओं कì पहचान करना और संभािवत उपयोगकताªओं (जैसे कपड़ा/चमड़ा/कागज/िवīुत संयंý/रेलवे आिद जैसे औīोिगक समूह) को सुिवधाजनक तरीके से ÿयुĉ जल का िवøय करना Öवीकायª घटक ह§। इसके अितåरĉ, आवासन और शहरी मंýालय (एमओएचयूए) ने अमृत 2.0 सुधारŌ के तहत "जल ही अमृत" पहल शुł कì है, िजसका उĥेÔय राºयŌ और संघ राºय ±ेýŌ को पयाªवरण मानकŌ को पूरा करने वाले पुनचªøण योμय शोिधत जल के िलए सतत आधार पर सीवेज शोधन संयंýŌ का कुशलतापूवªक ÿबंधन करने के िलए ÿोÂसािहत करना है। इस पहल का मु´य उĥेÔय ±मता िनमाªण करना और शोिधत िनवªहन जल कì गुणव°ा म¤ सुधार के िलए ÿोÂसाहन देना है। सकुªलैåरटी को संÖथागत łप देने के िलए, इस पहल के तहत 25 राºयŌ/संघ राºय ±ेýŌ म¤ जल संसाधन पुनÿाªिĮ ÿकोķ (डÊÐयूआरआरसी) Öथािपत िकए गए ह§, तािक संसाधन पुनÿाªिĮ उपायŌ कì आयोजना कì जा सके, िनगरानी कì जा सके और उÆह¤ Óयापक Öतर पर लागू िकया जा सके। (घ) और (ङ): मÅय ÿदेश राºय Ĭारा दी गई जानकारी के अनुसार, तकनीकì समÖयाओं, भूिम कì उपलÊधता, ठेकेदार के कायª-िनÕपादन या Öथानीय ÿशासिनक बाधाओं के कारण कुछ पåरयोजनाओं म¤ देरी हो सकती है। राºय ने सूिचत िकया है िक राºय Öतरीय तकनीकì सिमित (एसएलटीसी) और समी±ा बैठकŌ, अनुबंध ÿबंधन म¤ सुधार, समय पर िनिधयाँ जारी करके और पåरयोजना िडजाइन म¤ संचालन एवं रखरखाव (ओ एंड एम) घटकŌ को शािमल करके िनयिमत िनगरानी कì जाती है। िमशन के िदशा-िनद¥शŌ म¤ कम से कम पांच वषŎ के संचालन एवं रखरखाव लागत वाली पåरयोजनाओं को शुł करने कì िसफाåरश कì गई है, िजनका िव°पोषण उपयोगकताª शुÐक लगाकर या अÆय राजÖव ąोतŌ के माÅयम से िकया जा सकता है। िमशन का Āेमवकª उपयोगकताª शुÐक लगाने और वसूलने, गैर-राजÖव जल म¤ कमी लाने, शोिधत अपिशĶ जल के पुन: उपयोग 12.03.2026 1094 और पुनचªøण तथा िव°ीय ÿबंधन पĦितयŌ म¤ बेहतरी जैसे सुधारŌ पर भी जोर देता है, तािक संपि°यŌ के Öथायी संचालन और रखरखाव कì शहरी Öथानीय िनकायŌ (यूएलबी) कì ±मता को बढ़ाया जा सके। इसके अितåरĉ, यह िमशन अमृत 2.0 के तहत जल ही अमृत और अमृत िमý जैसी िविभÆन सुधार पहलŌ के माÅयम से राºयŌ/शहरी Öथानीय िनकायŌ को जल शोधन संयंýŌ और सीवेज शोधन संयंýŌ के ÿबंधन म¤ सहायता ÿदान कर रहा है। िववरण िछंदवाड़ा लोक सभा ±ेý म¤ पåरयोजनाओं कì िÖथित ø. सं. शहरी Öथानीय िनकाय ±ेý पåरयोजना अनुमोिदत लागत (करोड़ Ł. म¤) सŏपे गए ठेके कì तारीख 1 सौसर जलापूितª अमृत 2.0 - सौसर शहरी Öथानीय िनकाय म¤ िवतरण, एचएससी, एससीएडीए कì Öथापना 6.38 30-01-2026 2 डŌगर परािसया जलापूितª जल आपूितª डŌगर परिसया शहरी Öथानीय िनकाय 22.84 10-06-2025 3 िछंदवाड़ा जलापूितª अमृत 2.0-िछंदवाड़ा शहरी Öथानीय िनकाय के िलए जल आपूितª पåरयोजना 70.40 09-10-2024 4 अमरवाड़ा जलापूितª अमृत 2.0 : अमरवाड़ा शहरी Öथानीय िनकाय म¤ िवतरण नेटवकª , एचएससी, एससीएडीए ÿदान करना। 4.09 07-10-2023 5 जुÆनारदेव जलापूितª अमृत 2.0 - जुÆनारदेव शहरी Öथानीय िनकाय म¤ एचएससी, एससीएडीए, िवतरण ÿदान करना। 8.07 13-03-2024 6 पंढुरना जलापूितª अमृत 2.0- पांढुनाª शहरी Öथानीय िनकाय के िलए जल आपूितª पåरयोजना 10.76 09-08-2024 7 िछंदवाड़ा सीवरेज/सेÈटेज ÿंबधन िछंदवाड़ा शहरी Öथानीय िनकाय कì अमृत_2.0_एमपी_सीवरेज और सेÈटेज ÿबंधन पåरयोजना 5.50 06-02-2025 8 चोरई जलापूितª अमृत 2.0 - िवतरण पाइप नेटवकª को बदलना और अपúेड करना, एचएससी और एससीएडीए ऑटोमेशन ÿदान करना 5.39 09-10-2024 12.03.2026 1095 úामीण ±ेýŌ म¤ िवīुत अवसंरचना का उÆनयन 3444. ®ी रमाशंकर िबīाथê राजभर: ³या िवīुत मंýी यह बताने कì कृपा कर¤गे िकः (क) ³या सरकार को ²ात है िक उपभोĉाओं को िविभÆन राºयŌ, िवशेषकर उ°र ÿदेश म¤ Öमाटª मीटर लगाने के बाद गलत रीिडंग, अÂयिधक िबल, ÿीपेड शेष रािश म¤ तेजी से कमी और तकनीकì गड़बिड़यŌ जैसी समÖयाओं का सामना करना पड़ रहा है और यिद हां, तो उनके समाधान के िलए सरकार Ĭारा ³या सुधाराÂमक कदम उठाए गए ह§; (ख) ³या पूवा«चल के देवåरया और बिलया िजलŌ के कई गांव अभी भी बांस के खंभे पर आधाåरत असुरि±त िवīुत आपूितª पर िनभªर ह§ और कम वोÐटेज, बार-बार िůिपंग और जीणª-शीणª लाइनŌ का खािमयाजा भुगतना पड़ता है और यिद हां, तो ऐसे ÿभािवत गांवŌ कì सं´या िकतनी है और लाइनŌ के Öथायी उÆनयन के िलए ÿÖतािवत समय-सीमा ³या है; और (ग) ³या úामीण ±ेýŌ म¤ 24x7 गुणव°ापूणª िवīुत आपूितª सुिनिIJत करने के िलए कोई िवशेष योजना, ůांसफामªर ±मता वृिĦ, लाइन सुŀढ़ीकरण या Öमाटª िúड पåरयोजना Öवीकृत कì गई है और यिद हां, तो तÂसंबंधी Êयौरा ³या है? िवīुत मंýालय म¤ राºय मंýी; तथा नवीन और नवीकरणीय ऊजाª मंýालय म¤ राºय मंýी (®ी ®ीपाद येसो नाईक): (क) : Öमाटª मीटर कì Öथापना जुलाई 2021 म¤ शुł कì गई संशोिधत िवतरण ±ेý Öकìम (आरडीएसएस) के अंतगªत एक ÿमुख हÖत±ेप है, जो वाÖतिवक खपत के आधार पर सटीक िबिलंग, मैनुअल मीटर रीिडंग ýुिटयŌ को खÂम करने, उपभोĉाओं के िलए åरचाजª कì सुिवधा और िवīुत कì खपत कì िनगरानी करने कì ±मता जैसे लाभ ÿदान करता है। Öमाटª मीटर िवतरण यूिटिलटी को संúह द±ता म¤ सुधार करने, Öवचािलत ऊजाª लेखांकन को स±म करने, बेहतर भार पूवाªनुमान और ऊजाª पारगमन के िलए एक स±म पाåरिÖथितकì तंý कì सुिवधा ÿदान करने म¤ भी सहायता करते ह§। 12.03.2026 1096 ÿारंभ म¤, Öमाटª मीटर के लाभŌ के बारे म¤ सीिमत उपभोĉा जागłकता के कारण कुछ चुनौितयŌ कì सूचना िमली थी। उपभोĉाओं का िवĵास बढ़ाने और समÖयाओं का समाधान करने के िलए, िनÌनिलिखत उपाय िकए गए ह§: (i) सरकारी संÖथानŌ, वािणिºयक और औīोिगक उपभोĉाओं के िलए, और इसके बाद जब इनके लाभŌ का सफलतापूवªक ÿदशªन हो जाए, अÆय उपभोĉाओं के िलए Öमाटª मीटरŌ कì Öथापना को ÿाथिमकता देना। (ii) मंýालय Ĭारा िविभÆन परामिशªकांए और मानक संचालन ÿिøयाएँ (एसओपी) जारी कì गई ह§, िजनम¤ शािमल ह§: ÿीपेड Öमाटª मीटरŌ कì Öथापना के िलए उपभोĉाओं को िबल म¤ åरयायत के माÅयम से ÿोÂसािहत करना; Öमाटª मीटरŌ Ĭारा åरकॉडª िकए गए अिधकतम मांग के आधार पर उपभोĉाओं पर कोई शािÖत नहé लगाना; पूवªवतê बकाया रािश कì वसूली के िलए आसान िकÖतŌ म¤ तंý ÿदान करना; Öमाटª मीटरŌ कì सटीकता म¤ िवĵास बढ़ाने के िलए चेक मीटरŌ कì संÖथापना; उपभोĉाओं को िबजली खपत ůैक करने और सुिवधाजनक åरचाजª के िलए मोबाइल एिÈलकेशन कì ÓयवÖथा; बैल¤स उपलÊधता और आपातकालीन øेिडट सुिवधाओं के िलए अिúम अलटª। (iii) िवतरण यूिटिलटी, नोडल एज¤िसयŌ और एएमआई सेवा ÿदाताओं Ĭारा पÌपलेट, बैनर, जागłकता िशिवर और सोशल मीिडया के माÅयम से उपभोĉा जागłकता कायªøम आयोिजत िकए जा रहे ह§। पåरणामÖवłप, देशभर म¤ िविभÆन ÖकìमŌ के अंतगªत 5.97 करोड़ से अिधक Öमाटª मीटर लगाए जा चुके ह§। 12.03.2026 1097 इसके अितåरĉ, िवīुत (उपभोĉाओं के अिधकार) िनयम, 2020 के तहत एक मजबूत बहò-Öतरीय िशकायत िनवारण तंý Öथािपत िकया गया है। उपभोĉा िवतरण यूिटिलटी कì आंतåरक िशकायत िनवारण ÿणाली से संपकª कर सकते ह§ और यिद संतुĶ नहé ह§, तो उपभोĉा िशकायत िनवारण फोरम (सीजीआरएफ) और उसके बाद िबजली लोकपाल के माÅयम से अपनी िशकायत का िनवारण करवा सकते ह§। (ख) और (ग): िवīुत एक समवतê िवषय है, उपभोĉाओं को िवīुत कì आपूितª और िवतरण संबंिधत राºय सरकार/िवतरण यूिटिलटी के अिधकार ±ेý म¤ है। इसके अितåरĉ, िवīुत (उपभोĉा अिधकार) िनयम, 2020 के िनयम (10) के अनुसार, िवतरण लाइस¤सधारी सभी उपभोĉाओं को 24x7 िवīुत आपूितª करेगा। हालांिक, आयोग कुछ उपभोĉा वगŎ, जैसे कृिष, के िलए आपूितª के घंटे कम िनधाªåरत कर सकता है। भारत सरकार िव°ीय łप से िÖथर और ÿचालनाÂमक łप से द± िवतरण ±ेý के माÅयम से िवīुत आपूितª कì िवĵसनीयता और गुणव°ा म¤ सुधार करने के उĥेशय से वतªमान म¤ संशोिधत िवतरण ±ेý Öकìम (आरडीएसएस) के माÅयम से राºयŌ के ÿयासŌ म¤ सहायता कर रही है। इस Öकìम के अंतगªत, िवतरण यूिटिलटी को िवतरण अवसंरचना के उÆनयन कायŎ जैसे नए सबÖटेशनŌ का िनमाªण, सबÖटेशनŌ और िवतरण ůांसफॉमªरŌ का उÆनयन/±मता वृिĦ, कंड³टरŌ का ÿितÖथापन, नई एचटी/एलटी लाइन¤ िबछाना, फìडर िवभाजन, फìडर पृथ³करण आिद के िलए िव°ीय सहायता कì जा रही है। ये कायª राºयŌ Ĭारा ÿÖतुत ÿÖतावŌ के आधार पर Öकìम के अंतगªत Öवीकृत िकए गए ह§। आरडीएसएस के अंतगªत, िवतरण अवसंरचना कायŎ सिहत Öमाटª मीटåरंग कायŎ के िलए 2.83 लाख करोड़ Łपये के कायª Öवीकृत िकए गए ह§, िजनम¤ उ°र ÿदेश के िलए 40,739 करोड़ Łपये के कायª शािमल ह§। उ°र ÿदेश के देवåरया और बिलया िजलŌ के िलए आरडीएसएस के अंतगªत Öवीकृत कायŎ का Êयौरा संलμन िववरण-I पर िदया गया है। इसके अितåरĉ, राºय ने अपनी Óयवसाय योजना के अंतगªत िविभÆन िवतरण अवसंरचना कायª िकए ह§ तािक वोÐटेज समÖयाओं का समाधान िकया जा सके, और उनके Êयौरे संलμन िववरण-II पर िदए 12.03.2026 1098 गए ह§। िववरण-I आरडीएसएस के तहत Öवीकृत कायª 1. देवåरया िजला ø.सं िववरण पåरयोजना लागत 1 Öमाटª मीटåरंग कायª 246.21 2 हािन म¤ कमी के कायª 162.72 कुल 408.93 हािन म¤ कमी के कायª ø.सं िववरण इकाई संÖवीकृत पåरमाण 1 हाई ट¤शन (एचटी) लाइन सीकेएम 555.72 2 लो ट¤शन (एलटी) लाइन सीकेएम 1,696.80 3 नए डीटी सं´या 142 4 िवīुतीकरण के िलए संÖवीकृत घर सं´या 3,829 2. बिलया िजला ø.सं िववरण पåरयोजना लागत 1 Öमाटª मीटåरंग कायª 199.9 2 हािन म¤ कमी के कायª 299.23 कुल 499.13 हािन म¤ कमी के कायª ø.सं िववरण इकाई संÖवीकृत पåरमाण 1 हाई ट¤शन (एचटी) लाइन सीकेएम 787.35 2 लो ट¤शन (एलटी) लाइन सीकेएम 3,441 3 नए डीटी सं´या 109 4 िवīुतीकरण के िलए संÖवीकृत घर सं´या 1,942 12.03.2026 1099 िववरण-II उ°र ÿदेश पावर कॉपōरेशन िलिमटेड कì Óयवसाय योजना के तहत Öवीकृत कायª देवåरया िजला 167 नए िवतरण ůांसफामªर कì Öथापना 1140 िवतरण ůांसफामªरŌ का संवधªन 11 केवी फìडर िवभाजन के 9 कायª 11 केवी लाइन के 28 री-कंड³टåरंग कायª बिलया िजला 72 बिÖतयŌ म¤ बांस के खंभे हटाना 1535 िवतरण ůांसफामªरŌ का संवधªन 93 अितåरĉ िवतरण ůांसफामªर कì Öथापना 11 केवी फìडर िवभाजन के 40 कायª 11 केवी लाइन के 18 री-कंड³टåरंग कायª जल जीवन िमशन के तहत सुरि±त और िनयिमत जल आपूितª 3445. ®ी धम¥Æþ यादवः ³या जल शिĉ मंýी यह बताने कì कृपा कर¤गे िकः (क) ³या सरकार Ĭारा जल जीवन िमशन के अंतगªत वषª 2024 तक ÿÂयेक घर को नल से जल उपलÊध कराने के लàय कì घोषणा िकए जाने के बावजूद देश के अनेक राºयŌ के úामीण और वंिचत ±ेýŌ म¤ लाखŌ पåरवारŌ को अभी भी सुरि±त पेयजल नहé िमल पा रहा है और यिद हां, तो तÂसंबंधी Êयौरा ³या है; (ख) अब तक कुल िकतने पåरवारŌ को नल जल कने³शन ÿदान िकए गए ह§ और राºय-वार िकतने पåरवारŌ को अभी भी इस सुिवधा से वंिचत रखा गया है; और (ग) ³या सरकार को इस बात कì जानकारी है िक कई ÖथानŌ पर पाइपलाइन िबछाने के बावजूद िनयिमत łप से जलापूितª नहé कì जा रही है और जलापूितª म¤ Éलोराइड, आस¥िनक और अÆय हािनकारक तÂव पाए जाते ह§ और यिद हां, तो तÂसंबंधी Êयौरा ³या है? जल शिĉ मंýालय म¤ राºय मंýी; तथा रेल मंýालय म¤ राºय मंýी (®ी वी. सोमÆना): (क) और (ख): भारत सरकार अगÖत 2019 से राºयŌ कì भागीदारी से देश के ÿÂयेक úामीण पåरवार को नल जल कने³शन के माÅयम से िनयिमत और दीघªकािलक आधार पर पयाªĮ माýा म¤ 12.03.2026 1100 िनधाªåरत गुणव°ा वाला सुिनिIJत पेयजल उपलÊध कराने के िलए जल जीवन िमशन (जेजेएम) - हर घर जल कायाªिÆवत कर रही है। िमशन कì शुŁआत म¤, केवल 3.23 करोड़ (16.7%) úामीण पåरवारŌ के पास नल जल कने³शन होने कì सूचना थी। अब तक, राºयŌ/संघ राºय ±ेýŌ Ĭारा सूिचत िकए गए अनुसार, 03.03.2026 तक, जल जीवन िमशन (जेजेएम) के तहत 12.58 करोड़ से अिधक और úामीण पåरवारŌ को नल जल कने³शन ÿदान िकए गए। इस ÿकार, 03.03.2026 तक, देश के लगभग 19.36 करोड़ úामीण पåरवारŌ म¤ से लगभग 15.82 करोड़ (81.71%) पåरवारŌ के पास उनके घरŌ म¤ नल जल आपूितª होने कì सूचना है और शेष 3.54 करोड़ पåरवारŌ के िलए कायª संबंिधत राºयŌ म¤ कायाªÆवयन के िविभÆन चरणŌ म¤ ह§। िदनांक 03.03.2026 तक देश भर म¤ नल जल आपूितª कì राºय/संघ राºय ±ेý-वार िÖथित संलμन िववरण म¤ दी गई है। (ग): जेजेएम के तहत, मौजूदा िदशािनद¥शŌ के अनुसार, भारतीय मानक Êयूरो के बीआईएस: 10500 मानकŌ को पाइपगत जलापूितª योजनाओं के माÅयम से आपूितª िकए जा रहे जल गुणव°ा के िलए ब¤चमाकª के łप म¤ अपनाया जाता है। कायªसंबंधी िदशािनद¥शŌ के अनुसार, राºय/संघ राºय ±ेý जल गुणव°ा िनगरानी और पयªवे±ण (डÊÐयू³यूएम एंड एस) गितिविधयŌ के िलए जेजेएम के तहत िनिधयŌ के अपने वािषªक आवंटन का 2% तक उपयोग कर सकते ह§, िजसम¤ अÆय बातŌ के साथ-साथ जल गुणव°ा परी±ण ÿयोगशालाओं कì Öथापना और सुŀढ़ीकरण, उपकरणŌ, उपÖकरŌ, रसायनŌ, कांच के बने सामान, उपभोμय सामिúयŌ कì खरीद, कुशल जनशिĉ को काम पर रखना, फìÐड टेÖट िकट (एफटीके) का उपयोग करके समुदाय Ĭारा िनगरानी, जल गुणवÂता के संबंध म¤ जागłकता ÿसार, शैि±क कायªøम, ÿयोगशालाओं का ÿÂयायन/माÆयता आिद शािमल ह§। िविभÆन िहतधारकŌ के परामशª से राºयŌ/संघ राºय ±ेýŌ के मागªदशªन के िलए िदसंबर 2024 म¤ 'úामीण पåरवारŌ को पाइपगत पेयजल आपूितª कì जल गुणव°ा कì िनगरानी हेतु संि±Į पुिÖतका' जारी कì गई है। इस पुिÖतका म¤ िविभÆन परी±ण िबंदुओं जैसे ąोत (सतही और भूजल दोनŌ), 12.03.2026 1101 शोधन संयंý, भंडारण और संिवतरण ÖथलŌ पर पेयजल के नमूनŌ का Óयापक परी±ण करने और जहां भी आवÔयक हो, उपचाराÂमक कारªवाई करने कì िसफाåरश कì गई है तािक यह सुिनिIJत िकया जा सके िक पåरवारŌ को आपूितª िकया गया जल िनधाªåरत गुणव°ा का है। इसके अलावा, जल जीवन िमशन के अंतगªत, िवभाग मानक सांि´यकìय नमूने के आधार पर चयिनत एक Öवतंý तृतीय-प± एज¤सी के माÅयम से िमशन के अंतगªत उपलÊध कराए गए पाåरवाåरक नल जल कने³शनŌ कì कायªशीलता का मूÐयांकन करता है। कायªशीलता मूÐयांकन, 2024 के दौरान, यह पाया गया िक सव¥±ण िकए गए गांवŌ म¤ 98.1% पåरवारŌ के पास नल कने³शन थे; नल कने³शन वाले 87% पåरवारŌ ने िपछले सĮाह म¤ पानी ÿाĮ करने कì सूचना दी, जो समú ÿगित का संकेत है; 84% पåरवारŌ को अनुसूची के अनुसार पानी िमलता है; 80% पåरवारŌ को Æयूनतम 55 एलपीसीडी पानी िमलता पाया गया; 76% पåरवार बै³टीåरयोलॉिजकल संदूषण से मुĉ पाए गए और 81% पåरवार आपूितª ąोत के रासायिनक संदूषण से मुĉ पाए गए तथा माýा, गुणव°ा और िनयिमतता के मापदंडŌ पर िवचार करते हòए, 76% पाåरवाåरक नल कने³शन कायªशील पाए गए। िववरण 03.03.2026 तक देश भर म¤ नल जल आपूितª कì िÖथित ø. सं. राºय/संघ राºय ±ेý आज कì तारीख म¤ कुल úामीण पåरवार नल जल आपूितª वाले úामीण पåरवार नल जल आपूितª रिहत úामीण पåरवार सं´या म¤ % सं´या म¤ % 1. अंडमान एवं िनकोबार Ĭीप समूह 0.62 0.62 100.00 - - 2. आंň ÿदेश 95.53 71.71 75.06 23.82 24.94 3. अŁणाचल ÿदेश 2.29 2.29 100.00 - - 4. असम 72.24 59.03 81.71 13.22 18.29 5. िबहार 167.55 160.36 95.71 7.19 4.29 6. छ°ीसगढ़ 49.97 41.20 82.44 8.77 17.56 7. दादरा एवं नगर हवेली और दमण एवं दीव 0.85 0.85 100.00 - - 8. गोवा 2.64 2.64 100.00 - - 9. गुजरात 91.18 91.18 100.00 - - 10. हåरयाणा 30.41 30.41 100.00 - - 12.03.2026 1102 11. िहमाचल ÿदेश 17.09 17.09 100.00 - - 12. जÌमू एवं कÔमीर 19.26 15.64 81.23 3.61 18.77 13. झारखंड 62.53 34.51 55.18 28.03 44.82 14. कनाªटक 101.31 87.83 86.70 13.48 13.30 15. केरल 70.77 38.84 54.88 31.93 45.12 16. लĥाख 0.41 0.40 97.97 0.01 2.03 17. मÅय ÿदेश 0.13 0.12 91.45 0.01 8.55 18. महाराÕů 111.29 82.27 73.92 29.02 26.08 19. मिणपुर 146.78 132.75 90.44 14.02 9.56 20. मेघालय 4.52 3.59 79.60 0.92 20.40 21. िमजोरम 6.51 5.43 83.47 1.08 16.53 22. नागाल§ड 1.33 1.33 100.00 - - 23. ओिडशा 3.64 3.44 94.47 0.20 5.53 24. पुदुचेरी 88.64 68.48 77.25 20.17 22.75 25. पंजाब 1.15 1.15 100.00 - - 26. राजÖथान 34.27 34.27 100.00 - - 27. िसि³कम 107.69 63.00 58.50 44.69 41.50 28. तिमलनाडु 1.33 1.22 92.09 0.11 7.91 29. तेलंगाना 125.26 112.20 89.57 13.06 10.43 30. िýपुरा 53.98 53.98 100.00 - - 31. उ°र ÿदेश 7.51 6.48 86.33 1.03 13.67 32. उÂतराखंड 267.20 243.72 91.21 23.48 8.79 33. पिIJम बंगाल 14.48 14.19 97.97 0.29 2.03 कुल 19,35.87 15,81.70 81.71 3,54.17 18.29 एचएच: पåरवार ąोत: जेजेएम - आईएमआईएस BAGGAGE MISHANDLING AT AIRPORTS 3446. SHRI PRAVEEN KHANDELWAL: Will the Minister of CIVIL AVIATION be pleased to state: (a) whether the Directorate General of Civil Aviation (DGCA) maintained data on delayed, mishandled and lost baggage cases during the last three years and if so, the details thereof, airport-wise, particularly for high-traffic airports such as Delhi; (b) whether any service level benchmarks for baggage delivery timelines have been formally prescribed for scheduled airlines and if so, the details 12.03.2026 1103 thereof; (c) whether penalties or compensation mechanisms under Civil Aviation Requirements are being strictly enforced in cases of delay or mishandling and if so, the details thereof; (d) whether a centralised digital tracking and grievance redressal dashboard for baggage related complaints is operational and if so, the details thereof; and (e) the steps taken to strengthen passenger rights enforcement and operational accountability of airlines? THE MINISTER OF STATE IN THE MINISTRY OF COOPERATION; AND MINISTER OF STATE IN THE MINISTRY OF CIVIL AVIATION (SHRI MURLIDHAR MOHOL): (a) to (c): The Ministry of Civil Aviation has issued a Passenger Charter aimed at outlining the rules and rights of air travel passengers. As per the Passenger Charter, the provisions regarding "Lost, Delayed, or Damaged Baggage or Cargo" are as follows: For Domestic Carriage: A. In case of loss, delay, or damage to baggage, the carrier liability is limited to Rs. 20,000 per passenger. B. In case of loss, delay, or damage to cargo, the carrier liability is limited to Rs. 350 per kg. For International Carriage: A. In case of loss, delay, or damage to baggage, the carrier liability is limited to 12.03.2026 1104 1,131 SDR per passenger. B. In case of loss, delay, or damage to cargo, the carrier liability is limited to 19 SDR per kg. Grievances received for the last three years is given in the enclosed Statement. (d): The AirSewa portal, an initiative by the Ministry of Civil Aviation (MoCA), enables grievance redressal in a time-bound manner and provides a one-stop solution for hassle-free air travel. It allows passengers to submit and track grievances related to various stakeholders such as Airlines, Airports, Security, DGCA, Customs, Immigration, BCAS under various grievance categories including Baggage Claim. (e): To ensure appropriate protection for air travellers, DGCA has issued the following passenger-centric regulations/circulars to safeguard the interests of the travelling public: a) Carriage by Air of Persons with Disability and/ or Persons with Reduced Mobility [Civil Aviation Requirement (CAR) Section 3, Series M, Part I]. b) Facilities to be provided to passengers by airlines due to denied boarding, cancellation of flights and delays in flights (CAR Section 3, Series M, Part IV). c) Refund of Airline Tickets to Passengers (CAR Section 3, Series M, Part II) and Air Transport Circular ATC 01 of 2024, titled "Unbundle of services and fees by scheduled airlines". DGCA also conducts surveillance and spot checks at various airports across the country. 12.03.2026 1105 STATEMENT Grievances regarding Damaged Baggage, Delayed Baggage and Missing/Stolen Baggage for the last three years: Year Damaged Baggage Delayed Baggage Missing/Stolen Baggage Remarks 2024 224 - 185 DGCA was not maintaining data for the category “Delayed Baggage” till the year 2024 2025 416 76 433 2026 (till 28.02.2026) 153 69 173 TARGETED INCOME GROUP UNDER AFFORDABLE RENTAL HOUSING COMPLEXES SCHEME 3447. SHRI ANURAG SHARMA: Will the Minister of HOUSING AND URBAN AFFAIRS be pleased to state: (a) the income groups identified and targeted by the Government under the Affordable Rental Housing Complexes (ARHCs) vertical of PMAY-U 2.0; and (b) whether the Government has set any targets in terms of the number of private/public agencies and the estimated timeline for their enrolment for the construction of ARHCs and if so, the details thereof? THE MINISTER OF STATE IN THE MINISTRY OF HOUSING AND URBAN AFFAIRS (SHRI TOKHAN SAHU): (b) and (b): Ministry of Housing and Urban Affairs (MoHUA) launched 12.03.2026 1106 Affordable Rental Housing Complexes (ARHCs) as a sub-scheme of Pradhan Mantri Awas Yojana - Urban (PMAY-U) in July 2020 to address the housing need faced by migrant workers, urban poor, and informal sector labourers. This scheme has been implemented through two models. Further, based on the learnings of ARHCs, a dedicated vertical of Affordable Rental Housing (ARH) has been provisioned under PMAY-U 2.0 which aims to promote construction of affordable rental housing close to the workplaces of the intended beneficiaries including urban migrants/industrial workers/working women/students/urban poor etc. from Economically Weaker Section (EWS)/Low Income Group (LIG) category across the country. The ARH vertical is implemented through two models: Model-1: Converting existing Government funded vacant houses into ARH through Public Private Partnership mode or by Public Agencies. Model-2: Construct, Operate and Maintain rental housing by Private/Public Entities for urban poor, working women, employees of Industries, Industrial Estates, Institutions and other eligible EWS/LIG families. The Scheme Guidelines of PMAY-U 2.0 are available at https://pmay- urban.gov.in/uploads/guidelines/Operational-Guidelines-of-PMAY-U-2.pdf. Through this vertical, enabling eco-system is created by incentivizing Public/Private Entities to leverage investment for creating affordable rental housing stock. These include fast-tracked, single-window approvals through a green-channel process; 50% additional Floor Area Ratio (FAR) with free Transferable Development Right (TDR); exemptions from land conversion and 12.03.2026 1107 statutory charges; and parity of municipal service charges with residential projects to further encourage participation and reduce construction costs. Further, increased Technology Innovation Grant (TIG) of ₹5,000 per sqm. of carpet area has been provisioned to incentivize public and private entities to build new ARH units. AVAILABILITY OF PILOTS 3448. SHRI YUSUF PATHAN Will the Minister of CIVIL AVIATION be pleased to state: (a) the total number of pilots in the country, airline-wise; (b) the total number of female pilots in the country, airline-wise; (c) the number of foreign pilots hired by Indian airlines, airline-wise; and (d) the details of the pilot to aircraft ratio in the country, airline-wise? THE MINISTER OF STATE IN THE MINISTRY OF COOPERATION; AND MINISTER OF STATE IN THE MINISTRY OF CIVIL AVIATION (SHRI MURLIDHAR MOHOL): (a) and (b): The total number of pilots including female pilots in the country is tabulated as under: S. No. Airlines Male Female Total 1. Aakasa Air 685 76 761 2. Alliance Air 90 25 115 3. Air India 2615 508 3123 4. Air India Express 1586 234 1820 12.03.2026 1108 5. Indigo 4230 970 5200 6. Spicejet 317 58 375 (c): Total number of foreign pilot hired by Indian airlines: S. No. Airlines foreign pilots 1. Alliance Air 15 2. Air India Express 48 3. Indigo 29 (d) Pilot to aircraft ratio: S. No. Airline Pilot-to-Aircraft Ratio 1. Akasa Air 9.33 2. Alliance Air 06 3. Air India 9.1 4. IndiGo 7.6 5. Air India Express 8.8 6. SpiceJet 9.4 ARHCs FOR MIGRANT WORKERS 3449. DR. GANAPATHY RAJKUMAR P.: Will the Minister of HOUSING AND URBAN AFFAIRS be pleased to state: (a) whether the Union Government is aware of the fact that a large number of migrant workers working in various parts of Tamil Nadu, particularly in Tiruppur and Coimbatore are facing very difficulties in getting accommodation and houses on rent for staying as the private house 12.03.2026 1109 owners are charging exorbitant rent from the migrant workers and if so, the details thereof; (b) whether the Union Government has any proposal to build/construct Affordable Rental Housing Complexes (ARHCs) on the line of working girls hostel for the benefit of migrant workers; and (c) if so, the details thereof and if not, the reasons therefor? THE MINISTER OF STATE IN THE MINISTRY OF HOUSING AND URBAN AFFAIRS (SHRI TOKHAN SAHU): (a) to (c): ‘Land’ and ‘Colonisation’ are State subjects. Therefore, Government policies and schemes related to affordable housing including providing rental accommodation for their citizens are implemented by States/Union Territories (UTs) in their respective urban areas. However, Ministry of Housing and Urban Affairs (MoHUA) supplements efforts of States/UTs by providing Central Assistance under Pradhan Mantri Awas Yojana - Urban (PMAY-U) and PMAY- U 2.0 with an aim to provide all weather pucca houses with basic civic amenities to eligible urban beneficiaries including migrant workers across the country. PMAY-U 2.0 is implemented through four verticals i.e., Beneficiary Led Construction (BLC), Affordable Housing in Partnership (AHP), Affordable Rental Housing (ARH) and Interest Subsidy Scheme (ISS). The Scheme Guidelines of PMAY-U 2.0 are available at https://pmay- urban.gov.in/uploads/guidelines/Operational-Guidelines-of-PMAY-U-2.pdf. MoHUA launched Affordable Rental Housing Complexes (ARHCs) as a sub-scheme of PMAY-U in July 2020 to address the housing need faced by 12.03.2026 1110 migrant workers, urban poor, and informal sector labourers. This scheme has been implemented through two models. Based on the initiatives taken by various States/UTs and Public/Private agencies, a total of 5,783 Government funded vacant houses have been converted into ARHCs, so far under Model-1. Further, based on the proposals submitted by States/UTs, MoHUA has approved proposals for construction of 83,298 new ARHC units in several States including Tamil Nadu, with Technology Innovation Grant (TIG) of ₹175.95 crore under Model-2. Out of this, 40,630 ARHC units have been completed on ground, showcasing rapid on-ground implementation, proactive participation from Public/Private Entities. The State/UT-wise number of ARHCs sanctioned and completed under both models is given in the enclosed Statement. Based on the learnings of ARHCs, a dedicated vertical of ARH has been provisioned under PMAY-U 2.0. The basic purpose of the ARH vertical is to promote construction of affordable rental housing close to the workplaces of the intended beneficiaries. The ARH vertical aims to create a conducive environment for construction of adequate rental housing for eligible beneficiaries including urban migrants/industrial workers/working women/students/urban poor etc. By promoting housing near employment hubs and workplaces, the scheme aims to reduce travel time and expenses, improve productivity and quality of life and create more inclusive and sustainable urban communities. 12.03.2026 1111 STATEMENT A. State/UT-wise details of the existing Government funded vacant houses converted into ARHCs for the beneficiaries under Model-1 of the scheme: S. No. Name of State/UT Name of City No. of vacant houses converted into ARHCs 1 Chandigarh Chandigarh 2,195 2 Gujarat Surat 528 3 Ahmedabad 1,376 4 Rajkot 698 5 Rajasthan Chittorgarh 480 6 Jammu and Kashmir Jammu 336 7 Uttarakhand Lalkuan 100 8 Dehradun 70 Total 5,783 B. State/UT-wise details of ARHC units sanctioned and construction completed by Public/Private Entities under Model-2 of the scheme: S. No. Name of Name of Entity Total Units Construction completedState City 1 Tamil Nadu Sriperumbudur SPR City Estates Pvt. Ltd. 18,112 6,160 2 Sriperumbudur, SPR Construction Pvt. Ltd. 4,994 4,994 3 Hosur Tata Electronic Pvt. Ltd. 13,500 10,756 4 Chennai State Industries Promotion Corporation of Tamil Nadu 18,720 18,720 5 Chennai Chennai Petroleum Corporation Ltd. 1,040 - 6 Chennai SPR Construction Pvt. Ltd. 5,045 - 7 Chhattisgarh Raipur Indian Oil Corporation Ltd. 2,222 - 8 Assam Kampur Town Guwahati Refinery Indian Oil Corporation Ltd. 2,222 - 9 Uttar Pradesh Prayagraj Indian Oil Corporation Ltd. 1,112 - 10 Gujarat Surat Mitsumi Housing Pvt. Ltd. 453 - 12.03.2026 1112 11 Telangana Nizampet Sivani Infra Pvt. Ltd. 14,490 - 12 Andhra Pradesh Kakinada Coastal Developers Pvt. Ltd. 736 - 13 Vizianagram Coastal Developers Pvt. Ltd. 652 - Total 83,298 40,630 PUCCA HOUSES FOR ST FAMILIES UNDER PM-JUGA 3450. SHRI RAMASAHAYAM RAGHURAM REDDY: Will the Minister of TRIBAL AFFAIRS be pleased to state: (a) the progress of the PM Janjatiya Unnat Gram Abhiyan in constructing 20 lakh pucca houses for Scheduled Tribes families, including the number of houses sanctioned, under construction and completed so far, State-wise; (b) the criteria being used to identify eligible Scheduled Tribes families for housing benefits under the said Abhiyan in the State of Telangana and the details thereof; and (c) the timeline fixed for completion of the said housing initiative? THE MINISTER OF STATE IN THE MINISTRY OF TRIBAL AFFAIRS (SHRI DURGA DAS UIKEY): (a) : Pradhan Mantri Janjatiya Unnat Gram Abhiyan (PMJUGA) , launched by the Hon’ble PM on October 2, 2024, as Dharti Aaba Janjatiya Gram Utkarsh Abhiyan (DAJGUA), aims to saturate infrastructural gaps , improve access to health, education, Anganwadi facilities and providing livelihood opportunities to tribal people of 63,843 villages in 549 districts and 2,911 blocks across 30 States/UTs. One of the key interventions under the program is the construction of pucca 12.03.2026 1113 houses for Scheduled Tribe (ST) families, which is being implemented by the Ministry of Rural Development. Against the target of 20 lakh pucca houses under DAJGUA, a total of 12,89,251 houses have been sanctioned across various States and Union Territories, out of which 7,60,034 houses have been completed so far. The State/UT-wise progress of houses sanctioned and completed are given in the enclosed Statement. (b): Villages under DAJGUA are identified based on the criteria that they either have a population of 500 or more with at least 50% Scheduled Tribe (ST) population, or are located in Aspirational Blocks with at least 50 ST population. Scheduled Tribe families living in these selected tribal-majority villages across the country, including the state of Telangana, who lives without any shelter or households living in homes with kuccha walls and kuccha roofs or houses with zero, one, or two rooms as per the Socio Economic and Caste Census (SECC) 2011. (c): The Dharti Aaba Janjatiya Gram Utkarsh Abhiyan (DAJGUA) period is from 2nd October, 2024 to 31st March, 2029. The interventions undertaken under the program, including the housing initiative, are expected to be completed during this period. STATEMENT The State/UT-wise progress of houses sanctioned and completed Name of the state Sanctioned houses Completed houses ANDHRA PRADESH 1 1402 ARUNACHAL PRADESH* 0 780 ASSAM 54610 69747 12.03.2026 1114 BIHAR 17 222 CHHATTISGARH 309603 180431 DADRA AND NAGAR HAVELI * 0 1767 DAMAN AND DIU* 0 10 GUJARAT 73427 72378 HIMACHAL PRADESH 2345 1115 JAMMU AND KASHMIR 21 18912 JHARKHAND 55160 5301 KARNATAKA 11565 2110 KERALA 756 122 MADHYA PRADESH 298037 118322 MAHARASHTRA 335939 76711 MANIPUR 951 4167 MEGHALAYA* 0 39412 MIZORAM* 0 6720 NAGALAND* 0 16481 ODISHA 17521 88799 RAJASTHAN 129188 43680 SIKKIM* 0 8 TAMIL NADU 110 502 TRIPURA* 0 10543 UTTAR PRADESH* 0 67 UTTARAKHAND* 0 23 WEST BENGAL* 0 302 Grand Total 1289251 760034 * Sanction before launch of DAJGUA. However, completed during DAJGUA period. माननीय अÅय± : आप अगर ÿÔन काल नहé चलने देना चाहते ह§, तो सदन कì कायªवाही आज 12 बजे तक के िलए Öथिगत कì जाती है । 11.03 hrs The Lok Sabha then adjourned till Twelve of the Clock. ________ 12.03.2026 1115 12.00 hrs The Lok Sabha re-assembled at Twelve of the Clock. (Hon. Speaker in the Chair) … (Óयवधान) माननीय अÅय± : म§ ÓयवÖथा दूंगा । SHRI K. C. VENUGOPAL (ALAPPUZHA): Sir, our eight MPs are suspended. Kindly consider to revoke the suspension. माननीय अÅय± : हम बात करते ह§ । … (Óयवधान) माननीय अÅय± : नहé-नहé, हम बात करते ह§ । … (Óयवधान) 12.02 hrs OBSERVATION BY THE SPEAKER Neutrality of the Chair and Adherence of Parliamentary Norms माननीय अÅय± : माननीय सदÖयगण, Öवतंý भारत के संसदीय इितहास म¤ तीसरी बार लोक सभा अÅय± के िवłĦ अिवÔवास ÿÖताव के संकÐप पर सदन म¤ दो िदनŌ म¤ माननीय सदÖयŌ ने 12 घंटे से अिधक चचाª कì है । … (Óयवधान) डॉ. मोहÌमद जावेद (िकशनगंज) : सर, म§ने åरजॉÐयूशन मूव िकया था और मुझे बोलने का मौका नहé िमला । ...(Óयवधान) माननीय अÅय± : यह सबसे अिधक चचाª रही, तािक सभी माननीय सदÖयŌ के िवचार, तकª और िचंताएं सदन के सम± आ सक¤ । ÿितप± के माननीय सदÖयŌ ने िवप± कì आवाज दबाने और िनÕप±ता के अभाव कì बात कही । माननीय सदÖयŌ ने आसन कì िनÕप±ता, सदन कì 12.03.2026 1116 कायªकुशलता एवं भारत कì संसद कì वैिĵक उपलिÊधयŌ कì बात कì । वहé, माननीय सदÖयŌ ने हमारे संसदीय लोकतंý कì Óया´या कì एवं सदन कì गåरमापूणª परंपराओं, िनयमŌ और ÿिøयाओं पर अपना ŀिĶकोण रखा । माननीय सदÖयगण, यह सदन भारत के 140 करोड़ नागåरकŌ कì संÿभु इ¸छा का ÿितिनिधÂव करता है । यहां उपिÖथत ÿÂयेक सदÖय लाखŌ नागåरकŌ के जनादेश को लेकर आते ह§ और हर माननीय सदÖय नागåरकŌ कì समÖयाओं, अभावŌ और किठनाइयŌ को दूर करने तथा उनकì अपे±ाओं, आकां±ाओं और उÌमीदŌ को पूणª करने कì आशा भी साथ लेकर आता है । म§ने हमेशा यह ÿयास िकया है िक सदन के अंदर ÿÂयेक माननीय सदÖय िनयमŌ और ÿिøयाओं के तहत िवषय, मुĥŌ पर अपने िवचार Óय³त करे । म§ने इसके िलए सभी माननीय सदÖयŌ को पयाªÈत अवसर भी देने का ÿयास िकया । यह सदन समाज के अंितम पंिĉ म¤ खड़े हर Óयिĉ कì आवाज बने, ऐसा म§ने ÿयास िकया है । म§ने िनरंतर यह ÿयास िकया है िक म§ उन माननीय सदÖयŌ को सदन कì कारªवाई म¤ िहÖसा लेने के िलए ÿेåरत कłं, जो या तो संकोच करते ह§ या नहé बोलते ह§ । मेरे दोनŌ कायªकाल म¤ समय-समय पर िजन माननीय सदÖयŌ ने अपने िवचार Óय³त नहé िकए, म§ने उनको च§बर म¤ बुलाकर आúहपूवªक कहा िक वे सदन म¤ अपनी बात रख¤, अपने ±ेý कì आवाज को रख¤, ³यŌिक सदन म¤ बोलने से लोकतंý का संकÐप भी मजबूत होता है और सरकार कì जवाबदेही भी तय होती है ।यह सदन िवचारŌ का, चचाª का जीवंत मंच रहा है । हमारे संसदीय लोकतंý म¤ सहमित, असहमित कì महान परंपरा हमेशा से रही है । माननीय सदÖयगण, जब हमारे संिवधान िनमाªताओं ने Öवतंý भारत के िलए संिवधान का िनमाªण िकया तब उÆहŌने गहन िवमशª और अनुभव के आधार पर संसदीय लोकतंý कì ÓयवÖथा को अपनाया । आज दुिनया के अंदर संसदीय लोकतंý कì ÓयवÖथा ही शासन चलाने कì सवª®ेÕठ पĦित है । इस ÓयवÖथा म¤ संसद केवल कानून बनाने का मंच न होकर राÕů कì लोकतांिýक चेतना का केÆþ िबÆदु भी है । भारतीय संिवधान के आिटªकल 93 म¤ अÅय± के िनवाªचन का ÿावधान है । मुझे इस पावन सदन ने दूसरी बार अÅय± पद का दाियÂव और अवसर िदया है । म§ने हमेशा यह ÿयास िकया िक 12.03.2026 1117 सदन कì कायªवाही िनÕप±ता, अनुशासन, संतुलन और िनयमŌ के साथ संचािलत हो । सदन म¤ सभी को साथ लेकर सामंजÖय, ÓयवÖथा एवं कायª कुशलता बनाए रखने के िलए म§ने अपने दाियÂव को िनभाया । मेरा हमेशा यह ÿयास रहता है िक सदन कì गåरमा, मयाªदा और ÿितÕठा म¤ उÂतरोÂतर वृिĦ होती रहे । मंगलवार, िदनांक 10 फरवरी, 2026 को ÿितप± के कुछ माननीय सदÖयŌ ने अिवÔवास ÿÖताव का नोिटस िदया । हमारे संिवधान Ĭारा Öथािपत संसदीय लोकतंý कì ÓयवÖथा म¤ मेरा हमेशा अटूट िवÔवास रहा है । म§ने अपने नैितक कÂतªÓयŌ का िनवªहन करते हòए अिवÔवास ÿÖताव के ÿÖतुतीकरण के साथ ही सदन कì कायªवाही से अपने आपको अलग कर िलया । िपछले दो िदनŌ म¤ इस सदन ने लोकतंý कì एक महÂवपूणª संसदीय ÿणाली को पूरा िकया । इस चचाª के दौरान अनेक िवचार, अनेक ŀिĶकोण, अनेक भावनाएं इस सदन के सामने रखी गईं । म§ने सदन के ÿÂयेक माननीय सदÖय कì बात को गंभीरता और Åयान से सुना । म§ इस सदन के सभी माननीय सदÖयŌ का Ńदय से आभार Óय³त करता हóं, चाहे उÆहŌने समथªन म¤ अपने िवचार रखे हŌ या आलोचना के łप म¤ अपने सुझाव िदए हŌ । लोकतंý कì यही िवशेषता है । यहां हर आवाज सुनी जाती है और हर ŀिĶकोण को महÂव िदया जाता है । यह आसन िकसी Óयिĉ का नहé है । यह भारत कì लोकतांिýक परंपरा, संिवधान कì भावना और इस महान संÖथा कì ÿितÕठा का ÿतीक है । मेरे पूवªवतê अÅय±Ō ने इस सदन कì मयाªदा एवं परंपरा को मजबूत िकया और हमेशा इस सदन कì ÿितÕठा बढ़ाई है । संÖथाएं, मयाªदा और परंपराएं Öथायी रहती ह§ । सदन Ĭारा मुझ पर Óय³त िकए गए िवÔवास के िलए म§ सभी का आभार Óय³त करता हóं । म§ आपको िवÔवास िदलाता हóं िक इस िवÔवास को अपनी िजÌमेदारी मानते हòए पूरी िनÕठा, िनÕप±ता और संवैधािनक मयाªदा के साथ िनभाने का ÿयास कłंगा । कुछ माननीय सदÖयŌ ने कहा िक ÿितप± के नेता को बोलने से रोका जाता है । उÆह¤ बोलने का पयाªÈत अवसर नहé िदया जाता है । म§ इस पावन पीठ को ÖपÕट करना चाहता हóं, चाहे 12.03.2026 1118 सदन म¤ नेता हो या चाहे ÿितप± के नेता हो या कोई मंýीगण हो, कोई भी सदÖय हो – सभी माननीय सदÖयŌ को सदन के अंदर िनयमŌ के तहत, ÿिøया के तहत ही बोलने का अिधकार िनिहत है । कुछ माननीय सदÖयŌ का यह भी मानना था िक ÿितप± के नेता सदन से ऊपर उठकर ह§, िकसी भी िवषय पर बोल सकते ह§ । यह िकसी को िवशेषािधकार नहé है । म§ ÖपÕट करना चाहता हóं िक सदन िनयमŌ से चलता है । सदन के कायª संचालन िनयम सदन Ĭारा बनाए गए ह§, न सरकार ने, न ÿितप± ने । ये िनयम मुझे िवरासत म¤ िमले ह§ । इस सदन म¤ सभी सदÖयŌ के िलए िनयम समान łप से लागू ह§ । सदन म¤ जब भी लोकमत के िकसी िवषय को, चाहे माननीय ÿधान मंýी जी हŌ या माननीय मंýीगण हŌ, उनको भी अगर वĉÓय देना होता है, तो िनयम 372 के तहत अÅय± से पूवाªनुमित ÿाĮ करनी होती है । उसके नोिटस के बाद ही वे अपना वĉÓय दे सकते ह§ । िकसी माननीय सदÖय को िनयमŌ से अलग जाकर बोलने का अिधकार इस सदन म¤ नहé है । हमारे देश म¤ लोकतांिýक संÖथाओं कì गåरमा, मयाªदा और इसके िनयमŌ के सÌमान कì एक समृĦ परंपरा रही है । म§ आपके सम± इस सदन के कुछ माननीय पूवª अÅय±Ō के िनणªयŌ का भी उÐलेख करना चाहता हóं । वषª 1957 म¤ माननीय राÕůपित जी के अिभभाषण के धÆयवाद ÿÖताव पर बोलते हòए जब Öवगêय अटल िबहारी वाजपेयी जी ने जÌमू और कÔमीर से संबंिधत कुछ फोटोज़ को अपने Ĭारा कही गई बात के ÿमाण के तौर पर सदन के सामने रखना चाहा, तो इसी चेयर ने ÓयवÖथा दी िक ऐसा करने से पहले उस डॉ³यूम¤ट को Öपीकर को िदखाया जाए, िफर वह िनणªय ल¤गे । अटल जी ने सदन का सÌमान िकया, अÅय± के िनद¥शŌ कì पालना कì । 1 माचª, 1958 को ®ीमती रेणु चøवतê ने िकसी एक गैर-सरकारी दÖतावेज को सदन के पटल पर रखना चाहा, तो चेयर के Ĭारा यह कहकर नामंजूर कर िदया गया िक Öपीकर को िबना िदखाए आप सभा पटल पर यह पý नहé रख सकते । 26 माचª, 1958 को एक माननीय सदÖय ®ी एस. एम. बनजê ने अपनी बात के समथªन म¤ पý के साथ कोई कोट करना चाहा, तो माननीय उपाÅय± महोदय ने यह कहकर मना 12.03.2026 1119 कर िदया िक ऐसा करने से पहले आपको चेयर को िदखाना जłरी होगा । ऐसे कई सारे ÿकरण ह§, चाहे लोक सभा म¤ हŌ, चाहे राºय सभा म¤ हŌ, जब िबना चेयर कì परिमशन के िकसी दÖतावेज को सदन के पटल पर रखने या कोट करने कì अनुमित नहé दी गई है । ऐसी पुरानी परंपरा भी रही है । अÅय± पीठ के िनणªय से कोई भी माननीय सदÖय Óयिĉगत łप से सहमत या असहमत हो सकता है, परंतु सदन के िनयम, ÿिøया, परंपराओं को लागू करना मेरा दाियÂव है, कतªÓय है । जब भी कोई माननीय सदÖय सदन कì मयाªदाओं के िवŁĦ आचरण, Óयवहार करता है, तब सदन कì मयाªदा बनाए रखने के िलए मुझे कठोर िनणªय और ÓयवÖथाएं देनी पड़ती ह§ । सदन कì चचाª के दौरान एक माननीय िवĬान सदÖय ने संिवधान के आिटªकल 105 के तहत संसद के सदÖयŌ कì बोलने कì आजादी (Āìडम ऑफ Öपीच) के अिधकार कì बात कही । म§ इस सदन के सम± हमारे संिवधान के आिटªकल 105 (1) को पढ़कर इस संबंध म¤ िÖथित ÖपĶ करना चाहता हóं- ‘इस संिवधान के उपबंधŌ और संसद कì ÿिøया का िविनयम करने वाले िनयमŌ और Öथायी आदेशŌ के अधीन रहते हòए संसद कì Āìडम ऑफ Öपीच होगी ।’ अथाªत्, हम¤ संसद म¤ बोलने कì आजादी तो है, परंतु सदन Ĭारा Öवीकृत ÿिøया, िनयमŌ एवं Öथायी आदेशŌ के अधीन है । िनयम 352 (11) के उपिनयमŌ म¤ माननीय सदÖयŌ के िलए िवÖतृत िनद¥श अंिकत ह§ िक सदन म¤ बोलते समय िकन- िकन बातŌ का Åयान रखना चािहए, िकस ÿकार के तÃय और िकस ÿकार के वा³यŌ को नहé बोलना चािहए । चचाª के दौरान अÅय± पीठ के Ĭारा ÿितप± के कुछ सदÖयŌ ने माइक बंद करने का िवषय भी उठाया । इस बारे म¤ म§ पहले भी ÖपĶ कर चुका हóं िक आसन के पास कभी भी माइक ऑफ या ऑन करने का बटन नहé होता है । … (Óयवधान) माननीय अÅय± : आप इस बारे म¤ शैलजा जी से पूछ लीिजए । ÿितप± के माननीय सदÖय भी जब इस आसन के पीठासीन अिधकारी के łप म¤ कायª करते ह§, तो उनको भी यह भली-भांित पता है । सदन म¤ यह ÓयवÖथा है िक िजस माननीय सदÖय को बोलने कì अनुमित दी जाती है, 12.03.2026 1120 उनका ही माइक ऑन होता है । चचाª के दौरान माननीय मिहला सदÖयŌ के सÌमान को लेकर भी िवचार Óय³त िकए गए । मेरे मन म¤ हमेशा माननीय मिहला सदÖयŌ के ÿित सवō¸च सÌमान रहा है । मेरा हमेशा यह ÿयास रहा है िक हर माननीय मिहला सदÖय को सदन म¤ बोलने का पयाªÈत अवसर द¤ और पयाªÈत समय द¤ । म§ने हमेशा ÿाथिमकता के आधार पर भी हमेशा माननीय मिहला सदÖयŌ को बोलने म¤ ÿाथिमकता दी है । मुझे इस बात का गवª है िक मेरे अÅय± के कायªकाल म¤ सबसे ºयादा माननीय मिहला सदÖयŌ ने और सभी माननीय मिहला सदÖयŌ ने अपने िवचार रखे ह§ । परंतु, िजस ÿकार से ÿितप± के कुछ माननीय सदÖय वेल øॉस करके, ůेजरी ब¤च कì तरफ जा कर नारेबाजी कर रही थé, बैनर िदखा रही थé, उससे िनिIJत łप से अÿÂयािशत िÖथित बन सकती थी और इस अÿÂयािशत िÖथित कì संभावनाओं को टालने एवं ÓयवÖथा बनाए रखने कì िजÌमेदारी मेरी थी । इसीिलए म§ने सदन के नेता को सदन म¤ नहé आने का आúह िकया था । ऐसी ÿितकूल िÖथित म¤ सदन कì ÓयवÖथा और ÿितÕठा बनाने के िलए जो उिचत था, म§ने वह िकया । माननीय सदÖयŌ कì ओर से यह भी कहा गया िक ÿितप± के माननीय सदÖयŌ को पयाªÈत अवसर नहé िमलता है । 17वé और 18वé लोक सभा के संसदीय कायªवाही के आिधकाåरक आंकड़े उजागर करते ह§ िक सं´या बल पर देखा जाए तो भी ÿितप± के माननीय सदÖयŌ को राÕůपित अिभभाषण, धÆयवाद ÿÖताव, बजट, महÂवपूणª िवधेयकŌ, िवशेष चचाªओं, ÿÔन काल एवं शूÆय काल के दौरान आवंिटत समय से अिधक बोलने का अवसर िमला है । यह तÃय दो िदनŌ कì चचाª म¤ कई बार सदन के पटल पर आ चुका है । मेरी हमेशा कोिशश रहती है, चाहे देर रात तक मुझे बैठना पड़े, म§ सदन म¤ सुबह आता हóं और सदन के अंितम माननीय सदÖय के łप म¤ सदन से तभी जाता हóं जब सभी माननीय सदÖयŌ को मौका िमले । म§ हमेशा यही ÿयास करता हóं िक चाहे माननीय सदÖय अकेला हो या उनके दल का एक सदÖय हो, उनको भी पयाªÈत अवसर, पयाªÈत मौका िमले । मुझे खुशी है िक जो भी माननीय सदÖय बोलना चाहते थे, म§ने सभी को एक वषª के अंदर ही बोलने का अवसर िदया है । म§ने उÆह¤ बुला कर कहा िक आप बोल¤ । जो कोई भी माननीय 12.03.2026 1121 सदÖय बोलना चाहते हŌ और म§ने उनको अवसर नहé िदया है, ऐसा कोई उदाहरण सदन के पटल पर नहé रख सकता । कुछ माननीय सदÖयŌ ने िनलंबन का िवषय उठाया । यह अभी भी उठाया गया है । मेरा हमेशा ÿयास रहा है िक म§ िकसी भी माननीय सदÖय का िनलंबन नहé कłं । मेरा दल से ऊपर उठकर भी सभी माननीय सदÖयŌ से आज भी Óयिĉगत संबंध है और हमारे पुराने कायªकाल से Óयिĉगत संबंध रहे ह§, लेिकन सदन कì ÓयवÖथा बनाए रखने कì िजÌमेदारी भी मेरी है । इसीिलए जब म§ इस तरीके का कठोर या सदन इस तरीके का कठोर िनणªय करता है, तो िनिIJत łप से मेरा मन दु:खी होता है । परंतु हम¤ िवचार करना होगा िक ऐसी िÖथित ³यŌ उÂपÆन हòई? इस सदन म¤ िनलंबन जैसे कठोर िनणªय ³यŌ लेने पड़े? जब भी म§ आता हóं, तो म§ सदन म¤ कोिशश करता हóं िक सदन कì मयाªदा बनी रहे, ÿितÕठा बनी रहे और म§ इसके िलए आúह भी करता हóं । जब भी सदन म¤ चाहे ÿÔन काल हो या िनयोिजत तरीके से गितरोध पैदा करना हो, तब भी म§ आúहपूवªक कहता हóं िक आप सदन म¤ बैठ¤, चचाª कर¤, लेिकन जब सदन के माननीय सदÖय नहé मानते ह§ तो सदन Öथिगत करना पड़ता है । माननीय सदÖयगण, जब वषª 1997 म¤ आजादी के 50 वषª हòए थे, तो उस समय भी सदन कì मयाªदा और गåरमा पर चचाª हòई । वषª 2001 म¤ भी इसी तरीके से उस समय के तÂकालीन अÅय± ®ी बालयोगी जी के नेतृÂव म¤ पीठासीन अिधकाåरयŌ का एक सÌमेलन हòआ, िजसम¤ देश भर के मु´यमंýी आए, पीठासीन अिधकारी आए, मु´य सचेतक आए, और एक लंबी चचाª हòई । सभी ने सवªसÌमित से संकÐप िलया िक सदन म¤ नारेबाजी नहé करना, इÔतेहार नहé िदखाना, पýŌ को नहé फाड़ना, अभþ मुþाओं का ÿदशªन आिद नहé करना है । उस समय के तÂकालीन ÿधानमंýी Öवगêय अटल िबहारी जी थे और ÿितप± कì नेता ®ीमती सोिनया गांधी जी थé । उÆहŌने तो यहां तक कहा िक Óयवधान कम से कम करने के िलए सदन के बीचŌ बीच वेल म¤ आने पर पूणªत: रोक लगानी चािहए । इस मूल िनयम के उÐलंघन पर 12.03.2026 1122 Öवत: ही कड़ी अनुशासनाÂमक कारªवाई कì जानी चािहए । उÆहŌने यह भी कहा िक म§ ŀढ़ता से महसूस करती हóं िक राÕůपित के अिभभाषण के समय िकसी ÿकार के Óयवधान कì अनुमित नहé दी जानी चािहए । ऐसा Öपीकसª सÌमेलन म¤ भी, जहां सभी दलŌ कì सरकार¤ होती है, वहां भी हम कोिशश करते ह§ िक सदन कì मयाªदा और ÿितÕठा बनी रहे । हम उ¸च सदन ह§, हम िजतनी मयाªदा और परंपरा बनाए रख¤गे, नीचे पंचायत Öतर तक लोकतांिýक संÖथाओं म¤ उतनी मयाªदा बनी रहेगी, उतनी चचाª अ¸छी होगी, संवाद होगा और उससे पåरणाम िनकल¤गे । मतभेद हो सकते ह§, हम अलग-अलग दल और िवचारधाराओं से आते ह§, सहमित- असहमित भी होती है । लेिकन लोकतंý म¤ ÓयवÖथा बनाने कì िजÌमेदारी हमारी है । हम¤ अ¸छा नहé लगता है, बार-बार ति´तयां िदखाना, नारे लगाना और कागज फाड़ना, मेजŌ पर चढ़ना, यह संसदीय लोकतंý कì परंपरा नहé है । आप अगर उसको भी उिचत मानते ह§ तो यह आपकì िवचारधारा हो सकती है, लेिकन सदन और देश इस मत से सहमत नहé है । मेरा मानना है िक हम¤ सदन म¤ अ¸छी परंपराओं, पåरपािटयŌ और सदन कì मयाªदा को बनाने का ÿयास हमेशा करना चािहए । इस सदन कì कायªवाही को सभी देश देखते ह§ । सदन के अंदर लोगŌ का िवÔवास हो, लोगŌ का भरोसा रहे, लाखŌ लोग यह अपे±ा और आकां±ा करते ह§ । म§ भरोसा और िवÔवास बनाए रखने के िलए िफर से आúह कłंगा िक हम¤ सदन कì मयाªदा, ÿितÕठा और गåरमा बनाने के िलए सामूिहक संकÐप भी लेना चािहए और सामूिहक िवचार-िवमशª भी करना चािहए । िपछले दो िदनŌ कì चचाª म¤ कई माननीय सदÖयŌ Ĭारा संसद म¤ 22 भाषाओं म¤ अनुवाद, िडिजटल टे³नोलॉजी का उपयोग, åरसचª और सपोटª, कैिपिसटी िबिÐडंग, पी-20 और सीएसपीओसी के सफल आयोजन §डली गुÈस जैसे िवषयŌ कì उपलिÊध के ऊपर भी बात कì । यह मेरी उपलिÊध नहé है, यह सदन कì उपलिÊध है और सामूिहक ÿयासŌ कì उपलिÊध है । म§ जब भी दुिनया के दूसरे देशŌ म¤ जाता हóं तो वहां के राÕůमंडल के अÅय±Ō से भी िमलता 12.03.2026 1123 हóं तो मुझे भारत के लोकतंý और भारत के संिवधान पर गवª होता है । यह म§ने अभी सीएसपीओसी के सÌमेलन म¤ भी देखा और कई बार म§ने इसको महसूस भी िकया । िवÔव भर म¤ भारत के लोकतंý कì ÿितÕठा बने, हम¤ इसके िलए ÿयास करना चािहए । म§ यह भी बता दूं िक 125 से ºयादा लोकतांिýक देश यहां पर हमारी ÿाइड संÖथा जो ÿिश±ण देती है, वह हमारी लोकतांिýक ÿिøयाओं, परंपराओं और हमारी सिमितयŌ के िसÖटम को देखने आते ह§ और ÿिश±ण ÿाÈत करते ह§ । माननीय सदÖयगण, सदन के संचालन हेतु सदन Ĭारा बनाए गए िनयमŌ कì पालना करना, हम सभी सदÖयŌ कì Óयिĉगत और सामूिहक िजÌमेदारी है । परंतु कुछ माननीय सदÖय िनयमŌ कì अवहेलना करते ह§, सदन के संचालन म¤ Óयवधान करते ह§ । ऐसे सदÖयŌ को समय-समय पर मुझे मागªदशªन भी देना पड़ता है, उÆह¤ चेतावनी भी देनी पड़ती है ³यŌिक यह Öपीकर का दाियÂव है । िनयम 378 भी यह ÖपÕट करता है िक अÅय± Ĭारा ÓयवÖथाएं बनाये रखी जाएं और अपने िनणªयŌ के ÿयोजन के िलए जो शिĉयां मुझे िमली ह§, उनसे सदन कì मयाªदा बनाए रखने कì म§ कोिशश करता हóँ । लोकतंý कì संÖथाएं Öथायी होती ह§ । मजबूत संÖथाएं एक मजबूत लोकतंý का िनमाªण करती ह§ । यिद हम Öवयं इन संÖथाओं कì ÿितÕठा को कम कर¤गे तो इससे िकसी Óयिĉ अथवा दल को ही नहé, पूरे राÕů को ±ित होगी । संवैधािनक संÖथाओं का सÌमान करना केवल औपचाåरकता नहé है, यह लोकतंý कì िÖथरता का आधार है । माननीय सदÖयगण, जब-जब भी इस सदन म¤ शोर होता है, िनयोिजत Óयवधान होता है तो जनता के मन म¤ िनराशा पैदा होती है । म§ आपसे िवनăतापूवªक आúह करना चाहता हóँ िक भारत के जनमानस म¤ सदन के ÿित िवÔवास और भरोसा बनाए रखने के िलए हम सबको सहयोग करना चािहए । हमारा महान संिवधान, हमारे िनयम, हमारी परÌपराएं हम¤ िवरासत म¤ िमली ह§ । जहां मुझे इस महान िवरासत पर गवª है, वहé मेरा संकÐप भी है िक म§ इस महान िवरासत को हमेशा आगे बढ़ाऊँ और कभी भी इस सदन कì मयाªदा म¤ कमी न आने दूँ । जब म§ Öवयं को सदन म¤ प± और ÿितप±, सभी माननीय सदÖयŌ के संर±क के łप म¤ देखता हóँ तो चाहे िकतनी भी िÿतकूल 12.03.2026 1124 पåरिÖथित हो, कोई माननीय सदÖय मेरे मत से सहमत हो, असहमत हो, वह मेरे िखलाफ कुछ व³तÓय भी दे, लेिकन मेरा हमेशा ÿयास रहेगा, म§ इस संकÐप के िलए अटल हóँ और म§ सदन कì मयाªदा और ÿितÕठा को बनाये रखने के िलए किटबĦ हóँ । यह सदन हमेशा िनयम-ÿिøयाओं से चला है और भिवÕय म¤ भी यह सदन िनयम-ÿिकयाओं से ही चलेगा, चाहे कोई सहमत हो या असहमत हो । ÿशंसा हो या आलोचना हो, इस सबके बीच मेरा एक ही संकÐप सदन कì मयाªदा और िनयमŌ कì र±ा करना है । हम केवल संिवधान के शÊदŌ का ही नहé, बिÐक संवैधािनक नैितकता यानी कांÖटीट्यूशनल मोरािलटी का भी पालन कर¤ । आइए, हम सब िमलकर नए सकाराÂमक, रचनाÂमक अÅयाय कì शुŁआत कर¤ । राÕů के िनमाªण म¤, राÕů कì सेवा म¤ अपना योगदान द¤ और इस सदन को आगे चलाएं । म§ तो यह भी कहता हóँ िक जो हमारे सदन का दो िदन का समय इस िवशेष चचाª पर नÕट हòआ है, उसको हम आगे कैसे कवर करके लोगŌ कì अपे±ाओं, आकां±ाओं को पूरा कर सकते ह§, इसिलए देर रािý तक बैठकर भी हम¤ ये 14 घंटे कवर करने चािहए तािक देश कì जनता म¤ यह भरोसा पैदा हो िक सदन हमेशा लोगŌ कì अपे±ाओं, आकां±ाओं, उनकì किठनाइयŌ पर िचंता Óय³त करता है । म§ माननीय सदÖयŌ से आúह करता हóँ िक वे सदन कì मयाªदा बनाए रखने और अÅय± पीठ का सहयोग करने का ÿयास कर¤ । धÆयवाद । ________ 12.03.2026 1125 माननीय अÅय± : माननीय सदÖयगण, मुझे कई माननीय सदÖयŌ Ĭारा कुछ िवषयŌ पर Öथगन ÿÖताव कì सूचनाएं ÿाÈत हòई ह§ । म§ने आज Öथगन ÿÖताव कì िकसी भी सूचना के िलए अनुमित ÿदान नहé कì है । 12.28 hrs PAPERS LAID ON THE TABLE माननीय अÅय± : अब पý सभा पटल पर रखे जाएंगे । आइटम नंबर 2, ®ी ®ीपाद येसो नाईक । िवīुत मंýालय म¤ राºय मंýी; तथा नवीन और नवीकरणीय ऊजाª मंýालय म¤ राºय मंýी (®ी ®ीपाद येसो नाईक): महोदय, म§ िवīुत अिधिनयम, 2003 कì धारा 179 के अंतगªत िनÌनिलिखत अिधसूचनाएं (िहÆदी तथा अंúेजी संÖकरण) सभा पटल पर रखता हóँ:- (1) संयुĉ िवīुत िविनयामक आयोग (उपभोĉा िशकायत िनवारण मंच और लोकपाल) (पहला संशोधन) िविनयम, 2025 जो िदनांक 27 जनवरी, 2026 के भारत के राजपý म¤ अिधसूचना सं´या जेईआरसी-31/2024 म¤ ÿकािशत हòए थे । (2) गोवा राºय और संघ राºय±ेý के िलए संयुĉ िवīुत िविनयामक आयोग (कारबार का संचालन) (7वां संशोधन) िविनयम, 2025, जो िदनांक 27 जनवरी, 2026 के भारत के राजपý म¤ अिधसूचना सं´या जेईआरसी-1/2009 म¤ ÿकािशत हòए थे । (3) ऊजाª संर±ण अिधिनयम, 2001 कì धारा 59 कì उप-धारा (1) के अंतगªत ऊजाª संर±ण (अिभिहत उपभोĉाओं के िलए ऊजाª खपत के मानदंड और मानक, ÿłप, समय िजसके अंतगªत तथा योजना कì तैयारी और कायाªÆवयन कì पĦित, ऊजाª बचत ÿमाण पý जारी करने कì ÿिøया और खपत कì गई ऊजाª के ÿित मीिůक टन तेल के समक± मूÐय) िनयम, 2026, जो िदनांक 5 माचª, 2026 के भारत के राजपý म¤ अिधसूचना सं´या सा.का.िन.157(अ) म¤ ÿकािशत हòए थे, कì एक ÿित (िहÆदी तथा अंúेजी संÖकरण) । [Placed in Library, See No. LT 6502/18/26] सड़क पåरवहन और राजमागª मंýालय म¤ राºय मंýी (®ी अजय टÌटा) : महोदय, म§ िनÌनिलिखत 12.03.2026 1126 पý सभा पटल पर रखता हóँ:- (1) राÕůीय राजमागª अिधिनयम, 1956 कì धारा 10 के अंतगªत िनÌनिलिखत अिधसूचनाओं कì एक-एक ÿित (िहÆदी तथा अंúेजी संÖकरण):- (एक) का.आ.5671(अ) जो िदनांक 8 िदसंबर, 2025 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 4 अÿैल, 2011 कì अिधसूचना सं´या का.आ.689(अ) म¤ कितपय संशोधन िकए गए ह§ । (दो) का.आ.46(अ) जो िदनांक 5 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 8 जुलाई, 2021 कì अिधसूचना सं´या का.आ.2740(अ) म¤ कितपय संशोधन िकए गए ह§ । (तीन) का.आ.57(अ) जो िदनांक 5 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 4 अगÖत, 2005 कì अिधसूचना सं´या का.आ.1096(अ) म¤ कितपय संशोधन िकए गए ह§ । (चार) का.आ.61(अ) जो िदनांक 5 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 4 अगÖत, 2005 कì अिधसूचना सं´या का.आ.1096(अ) म¤ कितपय संशोधन िकए गए ह§ । (पांच) का.आ.247(अ) जो िदनांक 16 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 4 अगÖत, 2005 कì अिधसूचना सं´या का.आ.1096(अ) म¤ कितपय संशोधन िकए गए ह§ । (छह) का.आ.248(अ) जो िदनांक 16 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 4 अगÖत, 2005 कì अिधसूचना सं´या का.आ.1096(अ) म¤ कितपय संशोधन िकए गए ह§ । 12.03.2026 1127 (सात) का.आ.250(अ) जो िदनांक 16 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 4 अगÖत, 2005 कì अिधसूचना सं´या का.आ.1096(अ) म¤ कितपय संशोधन िकए गए ह§ । (आठ) का.आ.251(अ) जो िदनांक 16 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा राÕůीय राजमागª एवं अवसंरचना िवकास िनगम िलिमटेड को, उसम¤ उिÐलिखत, राÕůीय राजमागŎ के खंडŌ के िवकास और रख-रखाव से संबंिधत कायª करने का िनदेश िदया गया है । (नौ) का.आ.253(अ) जो िदनांक 16 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 29 अ³टूबर, 2024 कì अिधसूचना सं´या का.आ.4721(अ) को िनरÖत िकया गया है । (दस) का.आ.444(अ) जो िदनांक 30 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 4 अÿैल, 2011 कì अिधसूचना सं´या का.आ.689(अ) म¤ कितपय संशोधन िकए गए ह§ । (μयारह) का.आ.651(अ) जो िदनांक 6 फरवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 4 अगÖत, 2005 कì अिधसूचना सं´या का.आ.1096(अ) म¤ कितपय संशोधन िकए गए ह§ । (बारह) का.आ.838(अ) जो िदनांक 16 फरवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 4 अगÖत, 2005 कì अिधसूचना सं´या का.आ.1096(अ) म¤ कितपय संशोधन िकए गए ह§ । (तेरह) का.आ.839(अ) जो िदनांक 16 फरवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 4 अगÖत, 2005 कì अिधसूचना सं´या का.आ.1096(अ) म¤ कितपय संशोधन िकए गए ह§ । (चौदह) का.आ.841(अ) जो िदनांक 16 फरवरी, 2026 के भारत के राजपý म¤ ÿकािशत 12.03.2026 1128 हòआ था तथा िजसके Ĭारा राÕůीय राजमागª एवं अवसंरचना िवकास िनगम िलिमटेड को, उसम¤ उिÐलिखत, राÕůीय राजमागŎ के खंडŌ के िवकास और रख- रखाव से संबंिधत कायª करने का िनदेश िदया गया है । (पÆþह) का.आ.842(अ) जो िदनांक 16 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 4 अगÖत, 2005 कì अिधसूचना सं´या का.आ.1096(अ) म¤ कितपय संशोधन िकए गए ह§ । (सोलह) का.आ.873(अ) जो िदनांक 17 फरवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 4 अÿैल, 2011 कì अिधसूचना सं´या का.आ.689(अ) म¤ कितपय संशोधन िकए गए ह§ । (2) उपयुªĉ (1) के मद सं´या (एक) म¤ उिÐलिखत पýŌ को सभा पटल पर रखने म¤ हòए िवलÌब के कारण दशाªने वाला िववरण (िहÆदी तथा अंúेजी संÖकरण) । [Placed in Library, See No. LT 6503/18/26] (3) भारतीय राÕůीय राजमागª ÿािधकरण अिधिनयम, 1988 कì धारा 11 के अंतगªत जारी िनÌनिलिखत अिधसूचनाओं कì एक-एक ÿित (िहÆदी तथा अंúेजी संÖकरण):- (एक) का.आ.56(अ) जो िदनांक 5 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा, उसम¤ उिÐलिखत, राÕůीय राजमागŎ के खंडŌ को भारतीय राÕůीय राजमागª ÿािधकरण को सŏपा गया ह§ । (दो) का.आ.55(अ) जो िदनांक 5 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 19 जनवरी, 2024 कì अिधसूचना सं´या का.आ.304(अ) म¤ कितपय संशोधन िकए गए ह§ । (तीन) का.आ.58(अ) जो िदनांक 5 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 5 जनवरी, 2021 कì अिधसूचना सं´या का.आ.42(अ) म¤ कितपय संशोधन िकए गए ह§ । 12.03.2026 1129 (चार) का.आ.59(अ) जो िदनांक 5 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 24 जनवरी, 2019 कì अिधसूचना सं´या का.आ.380(अ) म¤ कितपय संशोधन िकए गए ह§ । (पांच) का.आ.60(अ) जो िदनांक 5 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 19 िसतंबर, 2018 कì अिधसूचना सं´या का.आ. 4896 (अ) को िनरÖत िकया गया है । (छह) का.आ.62(अ) जो िदनांक 5 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा, उसम¤ उिÐलिखत, राÕůीय राजमागŎ के खंडŌ को भारतीय राÕůीय राजमागª ÿािधकरण को सŏपा गया ह§ । (सात) का.आ.63(अ) जो िदनांक 5 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 16 अ³टूबर, 2020 कì अिधसूचना सं´या का.आ.3642(अ) को िनरÖत िकया गया है । (आठ) का.आ.252(अ) जो िदनांक 16 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा, उसम¤ उिÐलिखत, राÕůीय राजमागŎ के खंडŌ को भारतीय राÕůीय राजमागª ÿािधकरण को सŏपा गया ह§ । (नौ) का.आ.652(अ) जो िदनांक 6 फरवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा, उसम¤ उिÐलिखत, राÕůीय राजमागŎ के खंडŌ को भारतीय राÕůीय राजमागª ÿािधकरण को सŏपा गया ह§ । (दस) का.आ.653(अ) जो िदनांक 6 फरवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 1 िसतंबर, 2017 कì अिधसूचना सं´या का.आ.2863(अ) को िनरÖत िकया गया है । (μयारह) का.आ.654(अ) जो िदनांक 6 फरवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 6 िसतंबर, 2021 कì अिधसूचना सं´या 12.03.2026 1130 का.आ.3626(अ) म¤ कितपय संशोधन िकए गए ह§ । (बारह) का.आ.655(अ) जो िदनांक 6 फरवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 9 मई, 2017 कì अिधसूचना सं´या का.आ.1457(अ) म¤ कितपय संशोधन िकए गए ह§ । (तेरह) का.आ.840(अ) जो िदनांक 16 फरवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा, उसम¤ उिÐलिखत, राÕůीय राजमागŎ के खंडŌ को भारतीय राÕůीय राजमागª ÿािधकरण को सŏपा गया ह§ । (चौदह) का.आ.249(अ) जो िदनांक 16 जनवरी, 2026 के भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा, उसम¤ उिÐलिखत, राÕůीय राजमागŎ के खंडŌ को भारतीय राÕůीय राजमागª ÿािधकरण को सŏपा गया ह§ । (पÆþह) का.आ.64(अ) जो िदनांक 5 जनवरी, 2026 को भारत के राजपý म¤ ÿकािशत हòआ था तथा िजसके Ĭारा िदनांक 23 मई, 2022 कì अिधसूचना सं´या का.आ.2365(अ) म¤ कितपय संशोधन िकए गए ह§ । [Placed in Library, See No. LT 6504/18/26] THE MINISTER OF STATE OF THE MINISTRY OF LAW AND JUSTICE; AND MINISTER OF STATE IN THE MINISTRY OF PARLIAMENTARY AFFAIRS (SHRI ARJUN RAM MEGHWAL): Hon. Speaker Sir, with your kind permission, on behalf of my colleague, Shri Tokhan Sahu, I rise to lay on the Table:- (1) A copy of the Memorandum of Understanding (Hindi and English versions) between the National Capital Region Planning Board and the Ministry of Housing and Urban Affairs for the year 2023-2024. [Placed in Library, See No. LT 6505/18/26] 12.03.2026 1131 (2) (i) A copy of the Annual Report (Hindi and English versions) of the National Capital Region Planning Board, New Delhi, for the year 2023-2024. (ii) A copy of the Annual Accounts (Hindi and English versions) of the National Capital Region Planning Board, New Delhi, for the year 2023-2024, together with Audit Report thereon. (iii) A copy of the Review (Hindi and English versions) by the Government of the working of the National Capital Region Planning Board, New Delhi, for the year 2023-2024. (3) Statement (Hindi and English versions) showing reasons for delay in laying the papers mentioned at (2) above. [Placed in Library, See No. LT 6506/18/26] (4) (i) A copy of the Annual Report (Hindi and English versions) of the Delhi Development Authority, New Delhi, for the year 2024-2025. (ii) A copy of the Review (Hindi and English versions) by the Government of the working of the Delhi Development Authority, New Delhi, for the year 2024-2025. (5) Statement (Hindi and English versions) showing reasons for delay in laying the papers mentioned at (4) above. [Placed in Library, See No. LT 6507/18/26] THE MINISTER OF STATE IN THE MINISTRY OF JAL SHAKTI (DR. RAJ BHUSHAN CHOUDHARY): Hon. Speaker Sir, with your kind permission, I rise to lay on the Table a copy of the Annual Accounts (Hindi and English versions) 12.03.2026 1132 of the Betwa River Board, Jhansi, for the year 2024-2025, together with Audit Report thereon. [Placed in Library, See No. LT 6508/18/26] ________ 12.03.2026 1133 12.30 hrs STANDING COMMITTEE ON ENERGY 11th and 12th Reports SHRI SHRIRANG APPA CHANDU BARNE (MAVAL): Hon. Speaker, Sir, I wish to present the following Reports (Hindi and English versions) of the Standing Committee on Energy:- (1) Eleventh Report on ‘Demands for Grants (2026-27) of the Ministry of Power’. (2) Twelfth Report on ‘Demands for Grants (2026-27) of the Ministry of New and Renewable Energy’. ________ 12.31 hrs STANDING COMMITTEE ON FINANCE 30th to 32nd Reports SHRI BHARTRUHARI MAHTAB (CUTTACK): Sir, I rise to present the following Reports (Hindi and English versions) of the Standing Committee on Finance:- (1) Thirtieth Report on Demands for Grants (2026-27) of the Ministry of Finance (Department of Revenue). (2) Thirty-first Report on Demands for Grants (2026-27) of the Ministry of Corporate Affairs. (3) Thirty-second Report on Demands for Grants (2026-27) of the Ministry of Finance (Department of Financial Services). _________ 12.03.2026 1134 12.32 hrs STANDING COMMITTEE ON HOUSING AND URBAN AFFAIRS 9th Report SHRI MAGUNTA SREENIVASULU REDDY (ONGOLE): Hon. Speaker, Sir, I rise to present the Ninth Report (Hindi and English versions) of the Standing Committee on Housing and Urban Affairs (2025-26) on Demands for Grants (2026-27) of the Ministry of Housing and Urban Affairs. _________ 12.33 hrs STANDING COMMITTEE ON COAL, MINES AND STEEL 19th Report SHRI ANURAG SINGH THAKUR (HAMIRPUR): Hon. Speaker, Sir, with your permission, I rise to present the Nineteenth Report on Demands for Grants (2026-27) of the Ministry of Mines (Hindi and English versions) of the Standing Committee on Coal, Mines and Steel. ________ SHRI K. C. VENUGOPAL (ALAPPUZHA): Sir, hon. LoP has given a notice. We have only given a notice of Adjournment Motion. … (Interruptions) This is an important issue. Please allow LoP to raise that issue. This is on LPG crisis. … (Interruptions) माननीय अÅय± : मुझे ÿितप± के नेता का नोिटस िमला है । म§ने माननीय मंýी जी को उस िवषय के बारे म¤ अवगत करा िदया है । जब माननीय मंýी जी रह¤गे, तब हम इस पर चचाª कर¤गे । … (Óयवधान) 12.03.2026 1135 संसदीय कायª मंýी; तथा अÐपसं´यक कायª मंýी (®ी िकरेन åरिजजू) : जैसा िक Öपीकर साहब ने कहा है । मुĥा अज¦ट और इÌपोट¦ट है, तो सरकार उसका जवाब देना चाहेगी, उस पर Öटेटम¤ट देना चाहेगी । यह नहé कहा िक सरकार कुछ नहé कहेगी । उÆहŌने कहा है िक लीडर ऑफ अपोिजशन का नोिटस िमला है । Öपीकर साहब ने सरकार को भी बता िदया है िक ऐसा नोिटस आया है, तो वे तय कर¤गे, िफर आपको जानकारी द¤गे । … (Óयवधान) हम ऐसे नहé कह रहे िक हम इस पर नहé बोल¤गे । … (Óयवधान) इसके िलए मंýी जी तो होने चािहए । … (Óयवधान)
Spoke Anurag Singh Thakur
Spoke on
In debate Regarding need to establish Army Recruitment Centre in Kushinagar district, Uttar Pradesh-Laid
Anurag Singh ThakurSession ls-18-s7Regarding need to establish Army Recruitment Centre in Kushinagar district, Uttar Pradesh-LaidLok Sabha Proceedings