Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state: (a) the details of the challenges faced in signing Power Purchase Agreements (PPAs) for renewable projects along with the steps taken by the Government to address them; (b) the manner in which direct Power Purchase Agreements between renewable developers and agencies like National Hydroelectric Power Corporation 17.12.2025 175 (NHPC), National Thermal Power Corporation (NTPC) and Solar Energy Corporation of India (SECI) would help accelerate capacity addition; (c) the target set for country’s non-fossil fuel installed power capacity by the year 2030 and the manner in which these Power Purchase Agreement strategy would contribute to it; (d) the details of Government and private stakeholders involved in implementing this procurement framework; and (e) the manner in which this approach ensures grid reliability and promotes cleaner energy sources? THE MINISTER OF STATE IN THE MINISTRY OF POWER; AND MINISTER OF STATE IN THE MINISTRY OF NEW AND RENEWABLE ENERGY (SHRI SHRIPAD YESSO NAIK): (a): With the declining cost of solar-plus-storage and dispatchable renewable power, there is a growing preference among distribution companies and end procurers for such solutions. This shift has been accompanied by a reduced demand for plain solar power. Solar-plus-storage configurations are also being preferred over wind-solar hybrid projects, particularly due to their ability to supply power during peak demand hours. Accordingly, the Government has sensitized Renewable Energy Implementing Agencies (REIAs), namely Solar Energy Corporation of India Limited (SECI), NTPC Limited, NHPC Limited and SJVN Limited to move from plain solar tenders to tenders of Solar with Energy Storage, tenders with configuration to supply renewable power during peak hours and 17.12.2025 176 tenders with configuration to supply Firm and Dispatchable Renewable Energy (FDRE). To facilitate the further execution of Power Purchase Agreements (PPAs) in respect of bids issued by REIAs, the Government has undertaken several proactive measures. These include urging States to comply with the Renewable Consumption Obligation (RCO) under the Energy Conservation Act, and advising REIAs to aggregate demand from Electricity Distribution companies (DISCOMs) and other consumers before designing and issuing tenders. Regional workshops have been organized with major renewable energy- procuring States to address implementation challenges and accelerate PPA signing. (b) to (e): Generally Renewable Energy Implementing Agencies (REIAs), namely Solar Energy Corporation of India Limited (SECI), NTPC Limited, NHPC Limited and SJVN Limited, issue tenders as Intermediary Procurers for long- term procurement of renewable power. Renewable Power Developers, which may be from private or public sector, participate in these tenders wherein the successful bidders are decided through transparent competitive bidding process. REIAs sign Power Sale Agreements (PSAs) with End Procurers like Electricity Distribution companies (DISCOMs) and sign back-to-back Power Purchase Agreements (PPAs) with the Renewable Power Developers who are the successful bidders under the aforesaid tenders issued by REIAs. Generally, REIAs do not enter into PPAs with Renewable Power Developers unless they have executed Power Sale Agreements with the End Procurers. Normally, after 17.12.2025 177 the signing of PPA between REIA and renewable power developer, the renewable power developer installs and commissions the renewable power project on Build, Own & Operate (BOO) basis, in compliance to the relevant rules and regulations of the concerned Central/State Government and Government agencies like Central Electricity Authority (CEA), Central Transmission Utility of India Limited (CTUIL), Grid Controller of India Limited (Grid-India), Central/State Electricity Regulatory Commission (CERC/ SERC), Regional/ State Load Dispatch Centers (RLDC/SLDC), etc. which ensures both promotion and deployment of clean energy as well as grid reliability. Aforesaid mechanism of setting up renewable power projects through long-term renewable power procurement by REIAs acting as intermediary procurers has contributed greatly to promoting cleaner energy sources by increasing share of renewable power in installed power generation capacity and as a result India has already achieved 50% of its installed electricity capacity from non-fossil fuel sources, five years ahead of the target set under its Nationally Determined Contributions to the Paris Agreement. As of 31 October 2025, the installed capacity from non-fossil sources stands at about 259 GW, with 31.2 GW added in the current financial year up to October 2025. INCLUSION OF NUCLEAR ENERGY 2763. SHRI DHAVAL LAXMANBHAI PATEL: Will the PRIME MINISTER be pleased to state: 17.12.2025 178 (a) the manner in which the inclusion of nuclear energy in country’s energy mix is expected to strengthen long-term energy security; and (b) the manner in which nuclear energy is likely to contribute to achieving India’s Net Zero target by 2070? THE MINISTER OF STATE OF THE MINISTRY OF SCIENCE AND TECHNOLOGY; MINISTER OF STATE OF THE MINISTRY OF EARTH SCIENCES; MINISTER OF STATE IN THE PRIME MINISTER'S OFFICE; MINISTER OF STATE IN THE MINISTRY OF PERSONNEL, PUBLIC GRIEVANCES AND PENSIONS; MINISTER OF STATE IN THE DEPARTMENT OF ATOMIC ENERGY; AND MINISTER OF STATE IN THE DEPARTMENT OF SPACE (DR. JITENDRA SINGH): (a): Nuclear Energy has a huge potential to ensure long term energy security. With a view to optimally utilise limited uranium reserves and large thorium reserves in the country, the Department of Atomic Energy has adopted a three stage nuclear power programme, based on a closed nuclear fuel cycle, for generation of nuclear power and for achieving long term energy security. The three stage nuclear power programme, which is to be implemented sequentially, aims to multiply the domestically available fissile resources through the use of natural Uranium in Pressurised Heavy Water Reactors (first stage), followed by use of Plutonium obtained from the spent fuel of Pressurised Heavy Water Reactors in Fast Breeder Reactors, in the second stage. Large scale use of Thorium will subsequently follow making use of Uranium-233 that will be bred in Fast Breeder Reactors, when adequate 17.12.2025 179 nuclear installed capacity in the country has been built. Accordingly, the utilisation of Thorium as a practically inexhaustible energy source has been contemplated during the third stage of the Indian nuclear programme, which can be reached in future. The first stage of nuclear power programme comprising indigenous Pressurised Heavy Water Reactors (PHWRs) is in industrial domain. A Prototype Fast Breeder Reactor (PFBR) under the second stage is being commissioned by Bharatiya Nabhikiya Vidyut Nigam Limited (BHAVINI) at Kalpakkam, Tamil Nadu. (b): Nuclear power is a clean, base load source of electricity available 24X7. The lifecycle emissions of nuclear power are comparable to those of renewables like hydro and wind. Thus, nuclear energy will contribute significantly in India’s clean energy transition towards Net Zero by 2070. राजÖथान म¤ बेरोजगारी भ°ा 2764. ®ी भजन लाल जाटव: ³या योजना मंýी यह बताने कì कृपा कर¤गे िक: (क) राजÖथान म¤ बेरोजगारी भ°ा ÿाĮकताªओं और मु´यमंýी रोजगार सृजन योजना के अंतगªत लाभािथªयŌ कì कुल सं´या िकतनी है; (ख) इस योजना के अंतगªत करौली और धौलपुर िजलŌ म¤ िकतने युवा लाभािÆवत हòए ह§; (ग) इन िजलŌ म¤ आवेदनŌ को अÖवीकृत िकए जाने के मु´य कारण ³या ह§; (घ) ³या केÆþ और राºय सरकारŌ Ĭारा संयुĉ łप से इन िजलŌ म¤ युवाओं के िलए एक सरलीकृत पंजीकरण और सÂयापन ÿिøया को लागू िकए जाने कì संभावना है और यिद हां, तो तÂसंबंधी Êयौरा ³या है; 17.12.2025 180 (ङ) िजन लाभािथªयŌ का बेरोजगारी भ°ा सूचना के अभाव म¤ बंद कर िदया गया है, उनके िलए बेरोजगारी भ°े को िफर से शुł करने कì ÿिøया का Êयौरा ³या है और इसकì समय-सीमा ³या है; और (च) ऐसे लोगŌ का िजला-वार Êयौरा ³या है िजनके भ°े बहाल कर िदए गए ह§? सांि´यकì और कायªøम कायाªÆवयन मंýालय के राºय मंýी; योजना मंýालय के राºय मंýी; तथा संÖकृित मंýालय म¤ राºय मंýी (राव इÆþजीत िसंह): (क): नीित आयोग राºय Öतरीय योजनाओं का िववरण नहé रखता है। (ख) से (च): ÿij नहé उठता। MOISTURE CONTENT IN PADDY 2765. DR. T SUMATHY ALIAS THAMIZHACHI THANGAPANDIAN:
Spoke Shrikant Eknath Shinde
Spoke on
In debate Viksit Bharat Gurantee for Rojgar and Ajevika Mission (Gramin):VB-G RAM G Bill
Shrikant Eknath ShindeSession ls-18-s6Viksit Bharat Gurantee for Rojgar and Ajevika Mission (Gramin):VB-G RAM G BillLok Sabha Proceedings